Of a garden fuel storage shed, an extension of an existing garden shed and a garden hut temporary structure in the rear garden of the house
To erect a 24m high lattice telecommunications support structure together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing
For the proposed extension to existing building for the provision of a new Camogie Club changing room facilities and connection to existing services on site and ancillary site works
For development which will consist of (a) the revised layout and design for Camogie / LGFA Club changing room facilities as granted previously under planning ref P20/397 to incorporate club shop and referee changing room facility (b) the proposed extension to existing storage shed building to the north to incorporate open shed for machinery storage (c) the proposed construction of a new spectator viewing area along western side of the upper playing pitch and (d) the proposed floodlighting of the upper playing pitch, connection to existing services on site and ancillary site works
To construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
For development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works
For (1) Retention permission for the change of use from an existing licensed store to a multi-purpose room associated with the existing bar and restaurant areas, including minor changes to elevations (2) PERMISSION for development which will consist of the following (a) A stretch tent sound absorbent fabric covering, as weather protection between the existing kitchen and toilet areas and the multi-purpose room. (b) Signage associated with the multi-purpose room. (c) A ten-year permission for a temporary car park to serve the existing bar, restaurant and multi-purpose room. (d) Ancillary site works
For development consisting of the following: (a) The demolition of part of the existing bar/restaurant toilets, including store and boiler house (b) The change of use of the existing living room to a restaurant area linked to the existing kitchen area, previously used by the existing bar/restaurant (c) The construction of new toilets, including wheelchair accessible toilet, store and ancillary areas, incorporating part of the existing toilet area, to serve the existing refurbished bar area (d) The construction of new toilets including wheelchair accessible toilet and ancillary areas to serve the new restaurant area (e) The provision of new boundary wall and fencing to part of the site curtilage (f) The provision of new roof lights over the existing bar/restaurant area (g) Changes to all building elevations and (h) Associated signage and ancillary site works.
The development will consist of alterations and an extension to the existing dwelling house, including the use of the existing foundations granted under Planning Ref. 19-201, all ancillary site works
For development, the development consists of the construction of an agricultural loose house and associated site works
For the following development. 1. Sub-division and extension to existing commercial premises formally known as New Village Restaurant to 2 no two bedroom dwelling houses to include the CHANGE OF USE from commercial use to residential use, including the demolition of the existing rear extension and storage shed with all necessary ancillary works. 2. Demolish adjoining derelict buildings at the east of the existing commercial building facing the public road with all necessary ancillary works. 3. Construct 4 no. four bedroom dwelling houses, including the development of service road, public footpaths, public lighting and all necessary connections to public utilities to service the overall development to include RETENTION of public access to the River Rine adjoining the property with all necessary ancillary works
For (a) PERMISSION to construct a pergola at the rear of existing dwelling house and (b) PERMISSION to change the front door of this dwelling house, along with ancillary works
Of a) security bars to ground floor windows and doors and b) security gate
For development which will consist of the following, (1) The relocation and extension of the existing first level retail outlet into an existing enclosed courtyard (2) A new yoga-meditation at the lower floor level in the existing courtyard (3) Minor alterations to existing internal walls and layout (4) Ancillary site works (The development is proposed within the existing hotel complex a protected structure Dromoland Castle, Dromoland)
Of dwelling house as constructed, de-commission and close off existing septic tank, construct new advanced treatment system, bore new well and carry out ancillary site works
The development will consist of the demolition of the existing dwelling under the Defective Concrete Blocks Grant Scheme (DCBGS) and construction of a replacement dwelling, with single-storey extension to the rear and an additional storey added to the side of the dwelling, and all associated site works
(Reference No. P21/886) to Clare County Council for the construction of a dwelling house, treatment system, stables, bored well, create new entrance to public road and carry out ancillary site works and for full planning PERMISSION for Stables, Hay Store and Dungstead
To construct dwelling house, treatment system, stables, bored well, create new entrance to public road and carry out ancillary site works
For the development which will consist of the demolition of the existing dwelling down to foundation level. The proposed development will be constructed on the same footprint as the existing structure, with the addition of a new porch to the front, single-storey extension to the rear and an additional storey added to the side of the dwelling, and all associated site works
For the conversion of the attic area to a home office/ study, the installation of roof lights and all associated site works
For a proposed community recreation park consisting of an all-weather multi-purpose playing pitch and walking track with associated fencing and floodlighting, creation of community walking trail loops with low level lighting providing connectivity with residential areas to the north and south of Clarecastle Village
For the development which will consist of a new guest carpark including petrol interceptor, surface water attenuation tank, connection to existing surface water drainage system, carpark lighting and ancillary site works (The development is proposed within the curtilage of a protected structure Dromoland Castle, Dromoland)
For development at Dromoland Castle and Estate, Dromoland, Newmarket-on-Fergus, Co. Clare (Dromoland Castle is a Protected Structure: RPS No. 278). The development consists of:- The demolition of existing golf maintenance shed and the renovation and conversion of the existing stables building from golf storage/maintenance to visitor accommodation to provide 13 no. rooms/ suites, including an integrated bat loft, removal of solar panels, alterations to roof and openings, including installation of new and replacement doors, windows, gates, rooflights, infill wall sections, internal alterations and associated landscape works. - The renovation and conversion of the existing ‘Gardener’s Cottage’ from staff accommodation to visitor accommodation, including removal of existing storage shed, removal of existing rear lean to extension and replacement with two storey extension, new storage shed, internal alterations to provide a 4 no. bedroom guest house, 1 no. car parking space and associated landscape works. - Alteration and extension of existing clubhouse building to provide an enhanced wellness area and associated facilities, including replacement and extension of external deck to rear (south) with single storey timber spa structure, single storey extension to front (north) elevation, together internal alterations. - Installation of 3 no. sauna huts on lake island accessed via existing bridge, including raised timber walkways and floating timber jetties with plunge pools; - The provision of a new formal staff car park to the south of the stables building to provide 61 no. spaces, including accessible and EV charging spaces; - The provision of new/formalised car park to serve Brian Boru Hall (event facilities) to provide 21 no. spaces, including accessible spaces; and - Alterations to the existing stables car park resulting in a reduction of 4 no. spaces (36 no. spaces remaining), including accessible spaces; and - The provision of new/ formalised car park to serve the club house/ wellness centre to provide 10 no. spaces, including an accessible space. The proposed development will also comprise all ancillary landscaping and boundary treatment works, bicycle parking, biodiversity enhancement measures, wayfinding/ signage, site services, site lighting, construction compound, and all other associated site excavation, infrastructural and site development works. The planning application includes a Natura Impact Statement
To construct an extension to the existing dwelling house along with ancillary site works
For development which will consist of the following, (a) Remove existing front and part of side boundary wall (b) Construct new block wall and piers to match height of existing adjacent wall. (c) Increase entrance width and install security gate. (d) All ancillary site works
Of extensions to existing dwelling house, former stable building now used as storage and ancillary site works
To construct an entrance, dwelling house, garage, waste-water treatment system and soil polishing filter together with all associated site development works and services
For development at Dromoland Castle and Estate, (Dromoland Castle is a Protected Structure: RPS No. 278). The development will consist of: the demolition of the 20th century / non-original infill structures at the castle courtyard and the construction of a glazed roof structure (max height c.11m) to provide additional internal guest recreation / dining space for guests (c.300sqm additional floor area); Demolition of existing part one/part two element and the construction of a part three/part four storey extension to the existing 21st century castle's east wing to provide additional guest accommodation, resulting in the loss of 1 No. existing guest room and an additional 17 No. guest rooms, resulting in a net gain of 16 No. rooms within this part of the castle. Internal upgrades and reconfiguration to the castle's ground floor, resulting in a consolidated kitchen / back of house area and improved and extended guest dining and bar facilities, installation of new lift, alterations to ancillary facilities and loss of 3 No. existing guest bedrooms. Internal upgrades and reconfiguration at the castle's lower ground floor level, to provide additional bar space, kitchen facilities, the upgrade of existing spa areas together with the introduction of new wet spa facilities, all resulting in the loss of back of house space and 1 No. guest bedroom. Removal of existing deck and canopy and the extension of the existing clubhouse building through the reinstatement of the former orangery building to provide a guest restaurant / event space; Alteration and change of use of existing farm structures from agricultural to a golf maintenance facility and central delivery and procurement hub for the estate, including staff car parking to provide 11 No. spaces, including accessible spaces and EV charging spaces; and the provision of new / formalised car park to serve the Castle guests and Brian Boru Hall (event facilities) to provide 85 No. spaces, including accessible spaces and EV charging spaces. The proposed development will also comprise all ancillary landscaping and boundary treatment works, site services, wayfinding, site lighting, and all other associated site excavation, construction compound, infrastructural and site development works. The planning application includes a Natura Impact Statement
For development which will consist of a single detached two storey dwelling with all associated site works and services
For development which will consist of a revised garage design, including a change to the garage location to that previously granted under Planning Ref. P19-274 and P18-771
Of (a) existing beer garden consisting of covered seating and BBQ area as constructed (b) Permission to erect acoustic panel fencing along section of western boundary together with all associated site development works and services
A to retain detached converted domestic garage for continued use as a separate residential unit and to provide separate connections to services B PERMISSION to alter and extend the same residential unit including provision of ancillary garden shed in lieu of existing garden shed proposed to be demolished. C Relocate the vehicular entrance to the residential unit referred to above, which also serves the existing main house and access to applicants farmland at the rear, including proposed access to the (yet to be constructed house) previously granted permission under planning ref 22/457. D PERMISSION is also sought to subdivide the property into 3 separate plots for residential use ( excluding the farmland to the rear)
To relocate existing domestic and agricultural entrance to form one joint entrance and to erect a dwelling house, garage, and to connect to public services and access new house from new joint entrance and all associated site works
To construct a dwelling house, domestic garage, boundary walls / vehicular entrance including all associated site works and services
Is sought to construct a dwelling house, domestic garage, shared entrance, effluent treatment system including all ancillary site works and services
Of an upstairs attic conversion consisting of 2 bedrooms and 2 bathrooms, windows and all ancillary incidental works
To construct a new dwelling house, entrance, private garage and install a new wastewater treatment system on an infill site along with all associated works
To make alterations to the existing dwelling house to include the following; a) construction of covered canopy area to front of dwelling, b) elevational alterations, c) construction of minor extension to the rear of the dwelling and d) associated site works
For as constructed detached garage, fuel store and additional storage space together with all associated ancillary and incidental works
Is sought to construct a dwelling house, domestic garage, shared entrance, effluent treatment system including all ancillary site works and services
For the construction of a Dwelling House, Effluent Treatment System & all associated site works
To construct private dwelling house, detached garage, new site entrance, new on-site wastewater treatment system, connect to existing infrastructure services and all associated site works
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
To construct an entrance, dwellinghouse and garden shed together with all associated site development works and services
To Extend the Appropriate Period of Planning Permission for P17-453 to construct a dwelling house on site forming part of Site No. 12 Abbeylawn, Kildysart Road, Ennis, Co. Clare, connect to public water supply, connect to public sewer and carry out all ancillary site works
To construct a dwelling house on site forming part of site No 12 Abbeylawn, Kildysart Road, Ennis, connect to public water supply, connect to public sewerage and carry out all ancillary site works
Proposes to carry out the following development. The development consists of a flood defence protecting three properties in Quin Co Clare. The defence consists of two sections of earthen embankment and a reinforced concrete wall. The reinforced concrete wall section is approximately 120m long, with a maximum height of 2.2m. To the south a 2m high embankment extends approximately 80m to higher ground. To the north a less than 1m high embankment extends approximately 20m to highter ground. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project and has determinined that a full Appropriate Assessment is not required in respect of the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of signigicant effects on the environment arising from the proposed development.
To construct an entrance, dwellinghouse and garden shed together with all associated site development works and connections to public services
Of upper floor garage
For (a) to demolish an existing extension to the north side of an existing dwelling house and replace it with a smaller porch (b) to construct an extension to the south side of the existing dwelling and (c) alterations to the existing dwelling including lifting the roof to incorporate first floor living accommodation along with ancillary works