The relocation of existing Agricultural Entrance, construction of a Livestock underpass, effluent holding tank and all associated site worksDecision record indexed
Construction of a single storey dwelling house, domestic garage to include classic car storage, entrance, installation of a proprietary treatment system and sand polishing filter and all associated site worksDecision record indexed
The (A) Demolition of existing derelict dwelling house, (B) Construction of a new replacement dwelling house (C) Construction of a new domestic garage, (d) Installation of new mechanical aeration unit and percolation system, (e) utilisation of existing entrance, constructing new entrance wall and all associated site worksDecision record indexed
The construction of an extension to the side of the dwelling house, to provide a ground floor kitchen window and to erect 3 no. solar panels at first floor level on the side elevation of the exsiting house and all ancillary site worksDecision record indexed
Construction of a livestock underpass along with associated soiled water storage facilities & livestock entrance and all other associated site worksDecision record indexed
Phase 1 to consist of 30 no. dwellings as follows - 12 no. two storey 3 bed terrace units, 18 no. two storey semi detached 3 bed units, together with all associated access roadways, landscaping and all associated site works and connection to existing servicesDecision record indexed
The construction of a dwelling house, garage, entrance, installation of a waste water treatment system and associated site worksDecision record indexed
The change of use of the former filling station to a café and for the existing car wash. Planning permission for the construction of new sanitary facilities for the café. Change of use of part of the existing public house/restaurant and function room to provide a gymnasium, a barber shop, and a modified public house/restaurant. Construction of a ground floor extension to provide an access corridor to the rear of the proposed gym; construction of a ground floor extension to provide a new entrance and sanitary facilities for the restaurant and to provide access to the first floor existing residential area. Construction of a first floor extension to the rear to accommodate a fitness studio, changing rooms and ancillary gymnasium areas; a separate first floor extension to staff office facilities; and a new roof connecting with the existing pitched roof structure. Alterations and change of use of the existing go-kart track to an athletics/walking track. Change of use of the existing track viewing area/ changing room structure to sports injury treatment rooms. Alterations to the façade and change of use of the existing storage building to a hydro training area. Construction and installation of 2 no. paddle courts with enclosed glass panel walls. Change of use of the existing barn structure to a car valet and cleaning area. Site development works including: installation of 6 no. sauna and plunge pool pods and a wave pool in a new external recreation area; installation of a new wastewater treatment system; improvements to SUDS drainage infrastructure; alterations to existing vehicle entrances; provision of new parking areas and internal roads; modifications to site walls; installation of new footpaths and pedestrian areas; and all associated site worksGrounds not yet categorised
The demolition of existing single storey function room/nite club/restaurant, toilet blocks/1st floor living accommodation and construction of new 2 storey 20 bed country lodge, including refurbishment of existing original public bar & petrol station/associated site development works and replace existing on site treatment unitGrounds not yet categorised
Construction of a two-storey dwelling house, detached domestic garage, wastewater treatment system, percolation area, bored well, upgrading of existing agricultural entrance to serve as site entrance and all ancillary site worksDecision record indexed
The construction of 1no. single story dwelling house, upgrade works to to the existing site entrance, new fenced/hedged site boundaries, wastewater treatment plant, percolation area, detached shed to the rear of the site, and all associated worksDecision record indexed
Design alterations to granted permission 21/561 namely the removal of the rear single storey annex, inclusion of a new single storey annex to side of granted dwelling, inclusion of 2 no. new windows to side and 1 no. to rear of dwelling and minor repositioning of dwelling on site along with all ancillary worksDecision record indexed
The construction of a two-storey dwelling house, detached domestic garage, carport between dwelling and garage, wastewater treatment system, percolation area, bored well, access to site using entrance as granted under planning permission 20/74 and all ancillary site worksDecision record indexed
Construction of a new dwelling and detached garage, the installation of a waste-water treatment system, a new vehicle entrance and all associated site worksDecision record indexed
A change of house design and relocation of domestic garage to rear of dwelling granted planning under planning ref. no. 24/61275Decision record indexed
The demolition of existing building in ruins and the construction of a dwelling house, garage, installation of waste water treatment system, new vehicular entrance and all associated site worksDecision record indexed
Construction of 1no. one storey dwelling house, upgrade works to the existing site entrance, new front stone wall, new fenced/hedged site boundaries, wastewater treatment plant, percolation area, detached shed to the rear of the site and all associated site worksDecision record indexed
The construction of a new dwelling house, new vehicular entrance, new waste water treatment system and all associated site worksDecision record indexed
Construction of a dwelling house, domestic garage, entrance, bored well, installation of a proprietary treatment system and soil polishing filter and all associated site worksDecision record indexed
Decommissioning of existing septic tank and soak-pit. Installation of a packaged wastewater treatment system with eco-flo filterDecision record indexed
Revised site boundaries and site layout to include new location of wastewater treatment system as opposed to that permitted under planning reference 18/13Decision record indexed
The construction of a 1.5 storey dwelling house, domestic garage, entrance, bored well, installation of proprietary treatment system and soil polishing filter and all associated site worksDecision record indexed
Extension of duration for 16/747 for the construction of (1) two extensions to the rear of the existing public house and alterations of the exterior and interior of the building (2) demolition of two store buildings to the rear and all associated site worksDecision record indexed
Construction of a dwelling house, garage, wastewater treatment system, percolation area, site entrance and all associated site worksDecision record indexed
The construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site worksDecision record indexed
Construction of a dwelling, garage, entrance, effluent treatment system and all associated site works. Outline Permission Ref. No. 21/1644Decision record indexed
A New dwelling house, new wastewater treatment system, percolation area, garage, entrance and all ancillary site works. Outline Permission reference no. 21/491Decision record indexed
The construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site worksDecision record indexed
Construction of a dwelling house, garage, wastewater treatment system, percolation area, site entrance and all associated site worksDecision record indexed
A new dwelling house, new wastewater treatment system, percolation area, entrance and all ancillary site works. Outline Planning Ref. No. 21/490Decision record indexed
Demolition of rear extension and construction of a new rear/side extension, demolition of existing sheds and construction of a domestic garage, installation of a proprietary treatment unit and sand polishing filter and all associated site worksDecision record indexed
Construction of a new dwelling house, site entrance, waste water treatment system, percolation area and all associated site worksDecision record indexed
Construction of a new dwelling house, site entrance, waste water treatment system, percolation area and all associated site worksGrounds not yet categorised
The construction of a granny flat extension to the side of the existing dwelling, the upgrade of the existing waste water treatment system and all associated site worksDecision record indexed
(1) the provision of equestrian facilities within an existing equine estate which comprises a number of permitted equine farm buildings and stables. The development consists of: (a) provision of sand-based training/competition arenas with associated smaller warm-up/practice areas; (b) provision of covered spectator areas and judges cabins; (c) rider welfare cabin including WC with associated underground foul water holding tank; (d) modifications to internal access road; (e) provision of parking and horsebox holding areas; (f) provision of timber post and rail fencing and paved pathway; and, (g) all associated site development works, and (2) Planning Permission for; erection of a bat box, and provision of landscape and heritage amenity planting and all associated site development worksGrounds not yet categorised
The refurbishment of an existing two storey dwelling and the construction of a single storey extension to the western side of existing dwelling, the replacement of an existing septic tank and percolation area with a newly constructed Septic tank and percolation area, and all ancillary site works including the removal of selected farm outbuildingDecision record indexed
Kilcornan National School, Kilcornan, Co. Limerick
The construction of a two-classroom extension to the rear and side of the existing school, wastewater treatment system with new percolation area and all ancillary site worksDecision record indexed