The construction of a vehicular entrance, dwelling house, garage, septic tank and percolation area together with all associated site worksDecision record indexed
Alterations to the permitted site boundaries and site layout plan under previously permitted governing planning permission reference number 21-1775 together with all associated site works atDecision record indexed
A solar PV development on a 92 ha site consisting of: - The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; - 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; - 1 no. on-site IPP switching substation and associated works abutting the existing Cauteen 110kv substation; - a temporary construction compound; and - all associated ancillary development works; at Barnanalleen, Moanmore and Seskin, County Tipperary. The development can operate as an independent solar PV development and in conjunction with the solar PV developments permitted under planning permission references 17/600456 and 21/1109. The operational lifespan of the solar PV development will be 35 years. A Natura Impact Statement will accompany the planning application.Decision record indexed
The construction of a dwelling, site entrance, domestic garage, on-site effluent treatment system, and all associated site development worksDecision record indexed
Change of use of former farmyard (Buildings A and C) to micro artisan food production unit with ancillary offices, meeting room, storage and toilet facilities. Construction of a glazed link with social dining space to the Eastern courtyard elevation of farmyard building A. Change of use of former Laundry Buildings (Buildings B1 and B2) to an eHub space with computing, social space/conference room, office and toilet facilities. Construction of a single storey flat roofed corner link extension to connect buildings B1 and B2 together. Erection of retractable fabric canopies to the farmyard space varying in height between 3.8 to 4.5 metres. Change of use of farmyard courtyard to be used as a local farmers market space & all associated site works. Doon Social Farm is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No: 21809006. The Convent building complex and curtilage is a candidate Protected Structure. Original Planning Ref. No. 21/216Grounds not yet categorised
Change of use of former farmyard (Buildings A and C) to micro artisan food production unit with ancillary offices, meeting room, storage and toilet facilities. Construction of a glazed link with social dining space to the Eastern courtyard elevation of farmyard building A. Change of use of former Laundry Buildings (Buildings B1 and B2) to an eHub space with computing, social space/conference room, office and toilet facilities. Construction of a single storey flat roofed corner link extension to connect buildings B1 and B2 together. Erection of retractable fabric canopies to the farmyard space varying in height between 3.8 to 4.5 metres. Change of use of farmyard courtyard to be used as a local farmers market space & all associated site works. Doon Social Farm is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No: 21809006. The Convent building complex and curtilage is a candidate Protected StructureDecision record indexed
To carry out renovations to existing cottage which include raising the roof height, fitting of dormer type windows and repositioning of front porch and all associated ancillary worksDecision record indexed
The construction of a vehicular entrance, single storey dwelling house, garage, domestic waste water treatment system and polishing filter; together with all associated site worksDecision record indexed
To construct a playground and AstroTurf pitch to include fixed playground equipment, seating, all perimeter fencing and gates, street lighting and to construct a memorial wall in the centre of the site and all associated site worksDecision record indexed
The construction of an all-weather playing pitch with an integrated hurling ball-wall and an adjoining pitch for sensory-use, together with perimeter fencing, lighting, and all associated site works at the existing sports groundsDecision record indexed
Former St. Joseph's Secondary School, Lisgaugh, Doon Co. Limerick
Material change of use of ground floor section in the North West corner of former St. Joseph's Secondary School to medical centre use, minor internal alterations, reroofing of lean-to roof section on North elevation with new velux type roof lights and all ancillary site works. Former St. Joseph's Secondary School is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No. 21809006. The Convent building complex and curtilage is a candidate Protected Structure. Original Planning Ref. No. 21/349Grounds not yet categorised
Former St. Joseph's Secondary School, Lisgaugh, Doon Co. Limerick
Material change of use of ground floor section in the North West corner of former St. Joseph's Secondary School to medical centre use, minor internal alterations, reroofing of lean-to roof section on North elevation with new velux type roof lights and all ancillary site works. Former St. Joseph's Secondary School is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No. 21809006. The Convent building complex and curtilage is a candidate Protected StructureDecision record indexed
4 serviced sites together with planning permission for the construction of an entrance, internal roadway, footpaths and connection to mains services together will all associated site worksDecision record indexed
The construction of an extension to the side and rear of our dwelling house, to include a privacy/screen wall attached to the front of the dwelling house and all ancillary site worksDecision record indexed
Sisters of Mercy Convent, Main Street, Doon Co. Limerick
Amendments to planning reference 19/149 consisting of (1)amendments to layouts and elevations of apartments no.s 7 & 16, 8 & 17, 9 & 18, 10 & 19, and additional apartment no.21, (2)provision of guest bedroom suite in ground floor central convent building, (3)provision of a commercial kitchen in the new build east block, (4)provision of restaurant seating in the ground floor east convent building, (5)new door to restaurant terrace in existing window ope on the south elevation of the central convent building, (6)provision of solar PV panels on the south facing roof of the central three storey convent block, (7)and additional parking. Sisters of Mercy Convent Doon is on the NIAH (National Inventory of Architectural Heritage) Schedule, Ref No. 21809006 and the Convent buildings complex and curtilage is a Canditate Protected StructureDecision record indexed
Conversion / change of use of three storey convent building to accommodate 23 No: independent community living use apartments. The proposed works consist of the following: 1. The provision of a new entrance roadway to the east side onto main street (R505). 2. Removal of sections of boundary walls to main street. 3. Construction of a new car park. 4. Removal of later 20th century extensions. 5. Addition of two three storey end block extensions. 6. Provision of a commercial kitchen on the ground floor of the proposed east block extension. 7. Provision of seating in the east ground floor wing of the convent. 8. Provision of new door ope to southern courtyard to restaurant terrace. 9. Provision of PV panels on the south facing roof slope of the central convent block. 10. Alterations to the internal layouts. 11. Repairs to the historical fabric of the building. 12. All associated site works. Sisters of Mercy Convent Doon is on the NIAH (National Inventory of Architectural Heritage) Schedule, Ref No: 21809006. The Convent building complex and curtilage is a candidate Protected Structure.Decision record indexed
Former Sisters of Mercy Convent Doon, Lisgaugh, Doon
Amendments to previously approved planning permissions(19/149 & 20/539). (a) Amendments to the North Main Street Elevation (R505), (b) Demolition of existing ground floor corridor sections running parallel with Main Street (R505) and replacement with recessed landscaped courtyard spaces, (c) Addition of two extra ground floor one-bedroom apartments within the original building footprint, bringing the total number of apartments to 23 No., (d) Change of Use from previously approved assisted-living use apartments, to independent community-living use apartments, (e) All ancillary site works. The Sisters of Mercy Convent Doon is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No. 21809006. The Convent building complex and curtilage is a candidate Protected StructureDecision record indexed
Change of house type under previously permitting governing permission Planning Reference Number 22/421 together with all associated site worksDecision record indexed
Historical plaque erected on property known as 'Patrick Ryan'. Protected Structure Ref. No. 1150 and Architectural Heritage Ref. No. 21809008Decision record indexed
The construction of an entrance, dwelling house, garage, domestic wastewater treatment system with polishing filter together with all associated site worksDecision record indexed
The construction of a new vehicular entrance off existing private laneway, single storey dwelling house, domestic waste water treatment system & polishing filter together with all associated site worksDecision record indexed
Construction of a single storey prefab unit to accommodate a gym for Doon GAA Club members only, located to the North of the existing Club HouseDecision record indexed
Construction of dwelling, domestic garage, site entrance, install effluent treatment system including all associated site development worksDecision record indexed
All About Kids Creche, Coonagh Court Coonagh, Doon South Co. Limerick
Enclosed fire escape stairs at side of existing building as well as an additional fire exit at front of building and all associated site development worksDecision record indexed
The change of use of a public house to a domestic dwelling unit and for retention permission for a first floor dwelling extension to an existing dwelling and all associated site worksDecision record indexed
The construction of a single storey extension to existing dwelling house, installation of a new upgraded domestic wastewater treatment system with polishing filter, erection of recessed wing walls to improve existing vehicular entrance, together with all associated site worksDecision record indexed
(i) extension to existing cubicle shed with loose straw area (ii) milking parlour with drafting yard/collection yard, flow channel, dairy, storage, plant room, meal bin and underground effluent tank and all associated site worksDecision record indexed
The demolition of a single storey extension to the rear and side of a house, the renovation of the remainder of the house, the construction of a new single storey extension to the side and rear of the house and the installation of a new wastewater treatment system with polishing filter together with all associated site worksDecision record indexed
The construction of an independent agricultural access serving farm yard at existing farm adjacent to existing house together with all associated site worksDecision record indexed
The (a.) Change of use of former public house to overall dwelling use, including alterations, extension and elevation changes, (b.) alterations and extension to an adjacent terraced dwelling including elevation changes and provision of a new common access way from Toher Road for rear plot access, (c.) Permission is sought for the alteration of, and extension to an existing rear plot out-building and change of use to a dwelling including the provision of new plot divisional boundaries, connection to public services including all associated site development worksDecision record indexed
The construction of an extension to first floor bedroom and new pitched roof over existing single storey flat roof with all ancillary site worksDecision record indexed
Development at this site consisting of further continued use of two erected permanent 65m lattice meteoroloical masts previously granted under Planning Permission Ref 12/77 and extended under Planning Permission Ref. 15600530 and Planning Permission Ref 18600988 for the purposes of monitoring wind and climate conditions at Garracummer windfarm, granted permission under Planning Ref 04/1259 and ABP PL.23.215597 at lands atDecision record indexed
To erect a bungalow, domestic garage, effluent treatment tank and percolation system, entrance and all associated ancillary worksDecision record indexed
The construction of a vehicular entrance, single storey dwelling house, domestic waste water treatment system with polishing filter together with all associated site worksDecision record indexed
A 10 year planning permission for a solar development on a 39 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; Upgrading of existing laneway to permit access to a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); Security fencing around the proposed substation site; Solar panels on ground-mounted galvanised steel frames, 81 no. string inverters attached to selected ground-mounted galvanized steel frames, 6 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; A temporary construction compound; and All associated ancillary development works. The operational lifespan of the solar PV development will be 35 years. A Natura Impact Statement will accompany the planning applicationDecision record indexed