To retain extension to side and rear of existing dwelling and associated site works
Retain alterations to existing dwelling comprising lounge extension to front, kitchen / dining and bathroom extension to rear, boiler house extension to side, detached garage / carport, alterations to elevations and associated works
Of change of use from attached domestic garage to bedroom en-suite & games room and bay window extension, to existing dwelling including alterations & elevations
For (a) New 2 story Club Rooms including 4 no. dressing rooms, meeting rooms, office space, gym space and ancillary accommodation; (b) upgrading and widening of existing access road with a short retaining gabion stone wall section, entrance & public footpaths & lighting; (c) flood lit synthetic grass training pitch and hurling wall; (d) turnstiles and access gates; (e) provision of all associated surface water and foul drainage services and connections and all ancillary site works
To erect detached domestic garage and all ancillary works
Alterations to existing two storey dwelling comprising (1) demolition of existing rear two storey extension, (2) alterations to fenestration, external finishes & roof to all elevations, (3) alterations to existing floor plans, (4) two storey extension to front of dwelling, (5) two storey extension to rear of dwelling, (6) erection of detached domestic garage, (7) alterations to existing entrance, (8) construct new entrance to rear of dwelling, and (9) all ancillary site works
To construct a new replacement detached domestic garage/store to existing dwelling house, together with demolition of existing detached garage building and removal of temporary timber storage shed
For the demolition of existing extensions and the construction of a part single storey, part two storey extension to their existing dwelling and all associated site works
For alterations and extension to existing dwelling. Works include alterations to plans and elevations, upgrading of treatment system and percolation area, alterations to site layout, site boundaries and all ancillary works. Planning PERMISSION is also sought for domestic garage
To erect dormer extension and convert attic space to rear of existing dwelling and all associated works
To retain store, boiler house, boundary wall and pedestrian gate, location of vehicular entrance, elevational changes to as constructed storey and a half dwelling with attached carport and domestic garage for use as a B & B, as amendments to previously approved application no. 01/1759, and all associated site works
FOR CONSTRUCTION OF FULLY SERVICED TWO-STOREY DETACHED DWELLING, ENTRANCE, CONNECTION TO EXISTING SERVICES AND ALL ANCILLARY WORKS
Refurbishment and modification of the existing dwelling house of 206m2(including garage (15m2) and first floor storage space (46m2)) to 216m2 and includes; The conversion of the attic from storage to bedroom accommodation (56m2); The removal of 2no. existing dormers and 1 No. rooflight and replacement with 3No. dormers and 2no. roof lights; The removal of 2no. chimneys; The conversion of the garage to a home office(15m2); and all associated energy upgrade, site development, hard/soft landscaping, and excavation works above and below ground
To retain alterations to existing front elevation to existing bungalow, alterations to previous approved site boundaries and all associated alterations
For the erection of a single storey extension to side of existing dwelling, associated alterations to plans and elevations and all associated and ancillary works
To construct extension to existing domestic garage to comprise carport, ancillary store and associated site works
For the construction of a 3 storey student accommodation block comprising 24 en-suite bedrooms, living and kitchen facilities, ground floor communal spaces and ancillary accommodation together with associated site works and services
For development which will provide for the the upgrade of the Ballyhaise Wastewater Treatment Plant and will generally comprise of the following: the construction of a new storm water holding tank complete with internal cleaning system, internal storm return pumps, access ladder and platform; construction of new sludge drying reed beds complete with sludge feed and filtrate return pipework and also a filtrate return pumping station; construction of new storm water forward feed and final effluent wash water pumping stations; installation of a kiosk to house electrical switchgear and all ancillary site works
To erect single storey extension to the side of existing dwelling, attic conversions to living accommodation, connection to existing services, alterations to floor plans and elevations, demolition of existing domestic store and all ancillary works
For development consisting of: (1) erect two storey extension, part of which replaces existing dormer height first floor area, to rear of existing dormer dwelling, (2) alterations to existing plans & elevations and (3) all ancillary site works
To erect detached domestic store and all ancillary works
Retain single storey fully serviced extension which partially integrates the rear domestic garage & all associated works
To erect new dwelling house, domestic garage, entrance, boundary walls, piers with sewerage treatment system & percolation area. Significant further information has been received
For development consisting of a new dormer dwelling house, waste water treatment system and percolation area, vehicular entrance, entrance walls and piers together with all ancillary site development works
To construct a new part two-storey dwelling & part single story dwelling house with detached domestic garage, form new vehicular site entrance onto existing laneway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works
For (a) Part demolition of existing single storey 1974 Post Primary School building (b) construction of a mixture of 2 and 3 storey extension to the front and side of the existing school building which will be connected to the existing school by new link bridge at first floor level. The proposed development will include PV panel installation on the roof of the 2-storey element together with some alterations and refurbishment within the existing school building. (c) Associated Site works to include a new ramp and steps access to proposed new entrance, new 38 no. car parking spaces, 30 no bicycle parking spaces, new paved courtyard social space and all associated soft and hard landscaping
To construct fully serviced detached dwelling, incorporate wastewater treatment system/percolation area, entrance walls and piers and carry out associated site works
To erect detached domestic garage, alterations to site boundaries and all ancillary works
To erect fully serviced 2 storey dwelling, attached domestic garage, entrance walls and piers, install sewerage treatment facilities and all ancillary site works
To erect a fully serviced storage extension to side of existing waste handling unit (waste permit WFP-CN-21-0003-01 relates to this facility) and all ancillary site works
Of development from previously granted planning reference no.s 17/467 & 15/142 to consist of: (1) retention of alterations to office extension (2) retention of ESB substation and associated plant (3) retention of Rainwater harvesting tanks and associated infrastructure (4) retention of alterations to parking areas, landscaping and all associated and ancillary works
To alter location of previously approved attenuation tank (Pl. Ref. 11/326) and all associated works
To retain development consisting of single storey front extension to facilitate a hairdressing salon and single storey front extension to facilitate an office and associated work
For a new detached domestic car garage to the rear of the property along with a temporary access gate, also RETENTION sought for 2 no. permanent extensions for domestic purposes to the rear each attached to the existing dwelling together with all associated site services
To retain alteration from flat roof to pitched roof together with minor extensions and alterations to services/site layout at existing dwelling
To consist of alterations to plans and elevations reducing bedroom accommodation from 160 No. to 112 No. and all associated works to Nursing Home Building previously permitted under planning reference 19/236
To decommission existing septic tank and install new sewerage treatment unit and percolation area and all ancillary works at Cullies, Drumalee, Co. Cavan
For holidaying and recreational use of the lands as allows for camping and caravanning on a site area of circa. 2.55 Hectares. The proposed development comprises the occasional and periodic use of the lands for camping, caravanning, holidaying and recreational breaks and to place no more than two caravans and two no. tents at any one time during a calendar year and to allow for periodic and intermittent stays for recreational purposes and to be utilised no more than 120 no. days per calendar year. The principal use of the lands being maintained and continued for agricultural purposes for the growing of fruit and vegetables for consumption and use by the landowner and family members
For a fully serviced 2 Storey 112 No. Bed Nursing Home, parking provision, landscaping, access via existing service road (granted under Pl. Ref: 19/236), connection to existing services and all ancillary site works. SIGNIFICANT FURTHER INFORMATION INCLUDING AND NIS HAS BEEN SUBMITTED
To construct detached dwelling, detached domestic garage, incorporate wastewater treatment system/percolation area, entrance walls and piers and carry out associated site works
For permission for the proposed development of 4 no. holiday chalets and change of use for tourism accommodation on a 1.01 hectare site at Drumard, Lough Carratraw, Co. Cavan. The development consists of the proposed erection of 4 no. holiday chalets, consisting of 2 no. 2 person occupancy chalets, 1 no. 4 person and 1 no. 6 person occupancy chalets serviced by an incorporated, established access point and route of a proposed improved permeable gravel surface as leads to a parking area for 6 no. cars, integrated covered cycle parking (14 no.) and refuse storage; a proposed wastewater treatment system (14 p.e. biocycle plant) and associated polishing filter percolation area with all associated above and below ground ancillary works and landscaping scheme. The planning application is accompanied with a Natura Impact Statement (NIS)
For the redevelopment of existing single storey dwelling house to include elevational changes with the construction of a single storey extension to the rear and storey and a half extension to the side together with all ancillary site development works
To (1) erect an extension to the rear and side of dwelling, (2) Alter the front elevation (3) change brick finish with smooth plaster render (4) take down chimney complete. (5) all services connected to all existing services together with all associated site works. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED.
For: 1) Alterations to the Waste Processing Building, including: 1.1) Repositioning of the southernmost loading door at the front of the building by one bay to the left/southwest. 1.2) Construction of a below floor level outgoing loading ramp for the southernmost loading door measuring 17m (L) x 4.5m (B) x 2.15m (D). 1.3) Construction of a below floor level skip intake pit within the eastern corner of the building measuring 12.8m (L) x 12.5m (B) x 3.8m (D). 2) Extension of the Front Yard southeast by 15m. 3) Repositioning of the Site Entrance 5m south. 4) Repositioning of the Weighbridges and Weighbridge Kiosk east-northeast by up to 43m. Reconfiguration of the Weighbridge Kiosk. 5) Construction of an Entrance Ramp measuring 44.4m (L) x 14.1m (B) x 2.4m (H) from the Site Entrance to the Weighbridges. 6) Construction of a Retaining Wall measuring 44.4m (L) x 0.35m (B) x 2.7m (H) between the Front Yard and Entrance Ramp. 7) Repositioning and reconfiguration of the Administration and Welfare Facility and car parking areas. 8) Construction of a Storage Building measuring 3.0m (L) x 2.9m (B) x 2.5m (H). 9) Repositioning of the Lorry Parking Area from south boundary to the east boundary and increase in parking spaces from 9 No. to 10 No. 10) Repositioning of the Odour Control Unit 25m northeast and reconfiguration of the unit. 11) Installation of a Baler and construction of Shed Over measuring 36.2m (L) x 8.5m (B) x 13.5m (H). 12) Recontouring of an embankment area to the north of Rear Storage Yard to be level with the Rear Storage Yard covering an area of 730m². 13) Construction of a Firewater Storage Tank measuring 3m (radius) x 8.0m (H) and Pump Building measuring 12.2m (L) x 2.4m (B) x 3m (H) located within the recontoured area. 14) Repositioning of approximately 40m of northwest boundary fence by 8m inwards towards the centre of the site. 15) Repositioning of the Substation from within Waste Processing Building to 13m west outside of the building. The Substation measures 11.2m (L) x 4.4m (B) x 3.0m (H). 16) Installation of 2 No. Generators. 17) Repositioning of 2 No. diesel tanks from northeastern boundary of the Waste Processing Building to 10m west of the building. 18) Additional area of landscaping along the western boundary of the site measuring 600m². This application is accompanied by an EIA Screening Report, AA Screening Report, Planning and Environmental Report and Drawings
To retain works and alterations to previously approved permission (02/370). Alterations include revised dimensions and location of the single-storey domestic garage. Additional entrance door on east façade, 1 additional window on the south façade and 1 additional window on the west façade. Relocation of the sewage treatment system, associated modifications to the originally approved drainage layout and associated driveway modifications at the above address
To erect a fully serviced part single storey/part two storey dwelling, detached domestic garage, new site entrance, wastewater treatment system, percolation area and all ancillary site works
For alterations to previously approved dwelling (Pl. Ref. No. 22/478), alterations to site layout plan and all ancillary site works
For the construction of a new single storey extension to the rear of the existing single storey dwelling, alterations to the existing dwelling and site layout plan, decommissioning of the existing septic tank, new wastewater disposal system, and all associated site works
To erect fully serviced 3 storey Medical Centre, the extension of existing access road, associated parking, drop off areas, associated bicycle spaces, connection to public foul drainage system and watermain, landscaping and all ancillary site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application. Significant further information and revised plans including a Natura Impact Statement has been submitted.
The development will consist of the provision of a total of 134no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 109no. residential dwellings which will consist of 6no. 1bed units, 39no. 2 bed units, 59no. 3 bed units and 5no. 4 bed units. The residential dwellings range in height from one to two storeys. (c) The provision of a total of 25no. duplex apartment units consisting of 15no.1 bed units and 10no. 2bed units. The duplex apartment units range in height from two to three storeys. (d) Provision of a single storey creche with associated parking, bicycle and bin storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (h)The provision of an internal culvert along with decommissioning of existing drainage channel within the site. Culvert works to include for provision of a headwall at the outfall to the watercourse. (i) Creation of a new access point from the public road with associated works to include for a connections to the existing public footpath along with a pedestrian crossing point. (j) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required. (k) Provision of residential communal open space and public open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (l) Internal site works and attenuation systems which will include for provision of a hydrocarbon and silt interceptor prior to discharge. (m) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul via a rising main and provision of a foul pumping station, water connections and ESB network connection to include for provision of a substation. A Natura Impact Statement (NIS) has been prepared