For a development comprising 20 no. residential units, (6 no. detached houses, 10 no. semi-detached houses, 4 no. Duplex units), ancillary surface car parking, vehicular & pedestrian access to the proposed development via the existing residential development to the north of the site which is under construction (planning ref; 19/939), connection to public water supply; foul water drainage services including the provision of surface water attenuation and all associated site development and landscape works on lands at Bunratty West, Bunratty, Co. Clare. Works to Include alterations to the previously approved planning ref; 19/939, alterations include revised parking, road, footpath and open space where both residential schemes ajoin. The planning application is accompanied by a Natura Impact Statement (NIS)
For a motor vehicle valet centre to include tunnel and jet car wash, valet bays, customer waiting facilities, alteration to existing entrance, signage and all associated site development works
To remove the headframe on the existing 12m high telecommunications lattice structure (overall height 14.4m) and extend the structure to an overall height of 20m together with the addition of telecommunications antenna, dishes and associated equipment
To retain air handling unit located to rear of building and 2 no. chiller units with shed located to side of building; and planning PERMISSION for generator located to rear of building, 5 no. chiller units with new shed to side of building, high level louvre panels to existing building and all ancillary site works
For an external plant compound enclosed with a security fence to include Air Conditioning Units with condensers and dedicated outdoor air system on existing roof plant area, Chillers, Thermal Storage Tanks, Pump house, Generators, Transformers, and all ancillary site works
For works which shall consist of; an extension to the eastern elevation measuring 870m2 to contain new clean room and dispatch facilities, a two-storey extension to the northern elevation measuring 580m2 ground floor an 395m2 first floor to contain new staff welfare facilities, a single storey extension to the northern elevation measuring 640m2 to contain additional warehousing space, a new staff car park with 320 spaces shall be constructed to the north (rear) of the site and accessed by means of a new entrance. A separate new goods entrance shall be constructed to the front of the site to the east of the existing staff entrance. All site ancillary works including temporary relocated car park spaces and access to same
For development - the development consists of the construction of a slatted unit extension onto existing slatted unit and associated site works
To alter the previously approved planning permission for two restaurant units (ref no. P18/486) by subdividing / reducing the area of the area of the originally approved restaurant (unit 1) and constructing a small extension to the rear to provide an additional take away unit. Together with associated elevational changes and site works at the former ESB Premises
Of a portal frame type shed and all associated development works
Of a specialist grout rig testing structure comprising a steel frame surface-bolted to a concrete foundation slab, with rendered block work to the lower section, profiled metal cladding to the upper elevations, an openable single-skin roof, roller shutter and personnel access doors, external signage, and all associated site development works
Of dwellinghouse, garage, septic tank, site boundaries and public road access, as constructed
Of the erecting of 1,764.23 m2 or 370.83 kWp of photovoltaic panels on the existing two roofs of our buildings located east and south of our factory land, with all associates site works
For the change of use from vacant office accommodation and ancillary facilities to student accommodation. The proposed scheme consists of the provision of 95 no. bedspaces for student accommodation purposes and ancillary common rooms, laundry facilities, toilet facilities, waste storage etc. 96 no. bike parking spaces are also proposed. Permission is sought for the development outlined herein as well as minor internal demolition and all associated site development works.
To extend the existing 30 metre high, free standing lattice communication structure by an additional 3 metres in height to allow for additional antennae, dishes and all ancillary equipment at ESB Telecoms Ltd Telecommunications Compound at ESB Drumline 110kV Substation
For the proposed installation of solar panels on a steel frame structure to be erected over the roof of an existing telecommunication cabin (covering an area of approximately 48 sq.m to a maximum height of 4.8 metres above ground level). To include all ancillary development works and landscaping to the southwest of the telecommunications compound
For development, the development will consist of an amendment to the permitted amalgamated retail unit as granted under Reg. Ref. No. 23/634 and will comprise the provision of an ancillary off - licence sales area of c. 95.1sq.m and all ancillary site services and site development works
For the amalgamation of units no. 40a (Dealz) and Units 37-40 (Formerly Iceland) to form one single retail unit in the Shannon Town Centre Shopping Centre. PERMISSION is being sought for the outlined as well as signage, internal demolition, and all associated site development works
For development consisting of: the amalgamation of unit A28, unit 51 and units 52-54, to form one large retail unit, and the construction of a new fire escape corridor through unit A28 out to the square.
Of opening an entrance and hanging a farm gate
To construct a storage yard at Smithstown, Shannon, Co Clare. The purpose of the yard is to provide for material such as gravel and also to provide a display area for Walling and Patio materials
To RETAIN a new entrance, construction of a stoned entrance and the alteration of land levels
For change of use from office to a halal deli and retail, signage to east elevation, extractor vent to west elevation and ancillary site works
Of (i) change of use from office to retail and (ii) signage and the replacement of window with a door on the east elevation and ancillary site works
For development which will consist of the installation of a compact modular substation and ancillary site development works; to facilitate 2 no. shared electric vehicle charging units and 4 no. charging bays and ancillary site works within a partially reconfigured parking area
For development at Ulster Bank, Unit A29, Skycourt Shopping Centre, Shannon Town Centre, Tullyvarraga, Shannon, Co Clare V14 T850. The development consists of shopfront alteration which comprise of: fitting of new branded signage (after removal of existing signage/ or over existing signage) onto existing shopfront, replacement of existing ATM with new ATM (location retained). 2 No. internally located digital marketing LED screens, to be viewed externally through the existing glazing. Minor internal alterations to existing front banking hall to consist of new internal SSBM / ATMs within a new room
Of alterations to the extension granted under planning ref 19/362. Changes include increased floor area and changes to elevations along with all associated site works
For development at this site located to the north of the Airport Road (R471) Tullyvarraga, Shannon, Co Clare. The development will consist of the construction of a single storey discount foodstore (to include off licence use) with a gross floor area 1,837 sq.m. (net retail area 1,336) and a 2 storey café /restaurant (c.350sq.m) with terrace fronting onto the Airport Road. The development includes the erection of 1 no. free standing double sided internally illuminated totem sign, 5 no. internally illuminated gable signs (all elevations), 1 no. internally illuminated, free standing entrance sign and 1 no. entrance glass sign. The proposed development will be served by 106 no. car parking spaces (including 5 disabled spaces and 2 electric vehicle spaces). Vehicular/pedestrian access to the site will be provided from a new distributor and internal road layout served by a new entrance from the R471. The proposed development includes the construction of a single storey ESB Substation, lighting, all landscaping (including boundary treatment), relocation of bus shelter (on Airport Road), and site development and drainage works on a site of c.1.04 hectares
For development comprising the regeneration of an existing brownfield site at the site of the former Shannon Shamrock Hotel at Bunratty, Co. Clare. A seven year planning permission is sought to demolish the existing hotel and ancillary outbuildings and to provide for the phased delivery of a mixed use development including provision of: (a) 67 no. residential units comprising 20 no. 2 bed houses and 47 no. 3 bed houses; (b) 1 no. convenience retail store of 470sqm (net) floor area; (c) 6 no. retail / office units including 4 no. units of 167sqm (net) floor area and 2 no. retail / office units of 231sqm (net) floor area intended to accommodate Class 1 & Class 2 Uses; (d) a bat house; and (e) all ancillary site development works including (i) car & bicycle parking; (ii) bin storage; (iii) signage; (iv) 2 no. ESB sub-stations; and (v) public lighting. The existing conference centre building shall be retained on site and shall form part of a future phase of development. The application is accompanied by a Natura Impact Statement
To construct an extension to existing dwelling to comprise of kitchen / dining / livingroom and utility including the refurbishment and modification of existing dwelling and permission to demolish existing extension to west of dwelling including all associated site development works
For development: this application is an amendment to previously approved CCC ref. P24/60422. The development will consist of the installation of a c. 2.4 m high composite fence around the existing compact modular substation, and ancillary site development works
For (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.
The development will consist of: (A) Works to the existing two storey, stone building, to the north-east of the site which is located within the curtilage of a protected structure. The renovation and general repair to the existing stone building; the provision of a new sanitary facility and entrance lobby, confined to a single storey, timber clad extension to the north façade of the existing structure, increasing the total floor area of the structure from 47sqm to 58sqm; the provision of an external stairs to the west of the stone building; the provision of 3 No. Car Parking Spaces (Includes 1 No. Disabled Car Parking Space); the provision of street lighting to the north of the existing structure; the change of use of the existing stone structure from its former use as an art gallery, to its proposed use as a bar. (B) The provision of a pergola structure, with an overall height of 3.43m, and with a footprint of 41m2, positioned adjacent to the existing entrance to the bar at Bunratty Castel Hotel on the south façade of the hotel. The pergola structure will consist of a powder-coated finish with a timber soffit, works include all associated site and development works above and below ground. (C) The provision of a 4no. street lamps, with an overall height of 5.5m to the rear entrance road on the North of Bunratty Castle hotel. Works to include all associated site and development works above and below ground.
For development and RETENTION permission for development at a 0.153 Ha site at Bunratty Castle Hotel, Bunratty, Co Clare V95 DW9N (a Protected Structure). The development will consist of: the construction of a single storey extension (150 sq m) to the front (south) of the existing function room to be used as a pre-function room; the provision of an external terrace principally to the south and east of the pre-function room; the provision of an extension to the existing raised terrace to the front (south) of the bar/bistro; elevational changes to the existing function room; plant; hard and soft landscaping; boundary treatments; signage; and all associated site and development works above and below ground. The development subject to RETENTION permission consists of: the removal of 5 No. car parking spaces; and the provision of a retaining wall which will form the boundary of the external terrace to the pre-function room
For permanent retention of prefabricated single storey flat roof extension to rear and side of the existing school house building previously granted temporary permission under planning permission Ref: P19/878 and for the provision of additional prefabricated single storey flat roof extension to side of existing school building and all ancillary site works at School House, Bunratty Castle & Folk Park, Bunratty, Co. Clare.
For development which will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and alI associated siteworks
For PERMISSION for development and RETENTION permission for development at a 3.078 Ha site at Bunratty Castle Hotel, Bunratty, Co Clare V95 DW9N (a Protected Structure) The development consists of the RETENTION of works which were undertaken to rationalise, upgrade and repair (principally required as a result of fire damage) part of the existing hotel which has resulted in an increase in Ground Floor Area from c. 1,457 sq m to c1,681 sq m. The works subject to RETENTION permission principally include: the removal of selected internal and external walls, and external structures (c. 120 sq m); the reconfiguration of selected internal spaces; the construction of a single storey extension which links to a fire escape core to the rear of the hotel (totalling c. 150 sq m); the infilling of an internal courtyard to provide an internal extension (c. 56 sq m): the removal of 3 No. bedrooms, 2 No. offices and 2 No. stores at First Floor Level to provide a double height space below (c. 162 sq m); the removal of external fire escape stairs; the removal of proprietary metal steps on roof; the removal of plant including a water storage tank and enclosure and kitchen extract plant on roof; the removal of part of flat roof and associated roof lights and the provision of new flat roof; elevational changes; and landscaping. The development will also consist of: the provision of a new extended(c. 10.5 sq m) frontage to bar/bistro with full height doors/glazing panels and an entrance lobby with retractable awning on the southern elevation; the reconfiguration of selected internal spaces; the insertion of new windows in lieu of selected existing windows; the provision of part new flat roof; the provision of rooflights; the provision of plant including a new water storage tank and enclosure, and fire escape walkway on roof; the reconfiguration of the existing car parking resulting in an increase in the number of spaces from 140 No. to 152 No.; the provision of bicycle parking spaces; elevational changes; boundary treatments and landscaping; and all associated site and development works above and below ground
To construct logistics (warehouse and distribution) building with photo-voltaic arrays on the roof with supporting offices, signage, flag poles, HGV, car and cycle-parking, service yard, new vehicular entrance/exit, connection to existing estate sewers, ESB sub-station, landscaping, boundary treatment and all ancillary site works necessary to facilitate the proposed development
The construction of an extension consisting of new Reception / Visitors Centre, internal alterations, amendments to entrance hard landscaping & car-parking, signage to building, alterations to existing elevations and all associated site works
To erect signage to logistics (warehouse and distribution) building
For the construction of a single storey extension to side of existing dwelling to include hallway, bedroom, walk-in wardrobe, en-suite and playroom, including internal alterations and elevational changes to existing dwelling. Also PERMISSION is sought for the demolition of existing boiler house, playroom and sunroom to side of dwelling including ancillary site works
To extend existing covered process area with a 40m.sq. covered unit,
For development which will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and alI associated siteworks
For 1) Construction of a new 540 m2 fully bunded sodium hypochlorite building with a 60 m2 lower mezzanine floor and 10 m2 upper mezzanine floor, including 2No. external underground brine storage tanks; 2) Construction of a new 102 m2 mezzanine floor extension to an existing storage area within an existing warehouse; 3) Construction of a new 32 m2 extension to an existing ESB substation on site; 4) Demolition of an existing internal ramped accessway and removal of 2 No. existing temporary containers off site; 5) All ancillary site development works and services to facilitate the development including drainage, external plant, external pipework to adjacent storage tank and utility connections. The proposed development site is controlled by an Industrial Emissions Licence (Register No. P0076-02) authorised by the Environmental Protection Agency.
To carry out - A number of internal layout modifications within the existing building, - Construct a bar / restaurant area extension with associated external terrace areas, - Remove the various existing service yard structures to the north, - Construct a new service and keg room building, service yard wall, bin compound wall and universal access WC, - Refurbish and reuse the existing Keg Room building as a Tea / Coffee / Snack / Merchandise Outlet at ground and first floor level (public road level) and to construct a storage room extension at ground floor level and a new shopfront / entrance extension, balcony and stairs at first floor level (public road level) and a new pedestrian access and crossover from the public footpath on the old Limerick / Shannon Road (L3126). - Install new signage, new connections to existing site services and all associated site works
Of a food truck and associated seating area.
To RETAIN the development. The development consists of the constructed stand alone storage building and PERMISSION for development. The development consists of the construction of an extension to the main building for storage and associated site works
To construct a new dwelling house and private garage, new entrance and install a new wastewater treatment system along with all associated site works
Of a complete single-storey garage to the rear and a complete single-storey extension to the side of existing semi-detached bungalow
The development which will consist of the installation of a compact modular substation and ancillary site development works; to facilitate 4 no. shared electric vehicle charging units and 8 no. charging bays; and ancillary site works within a partially reconfigured area; and the installation of signage. This site is located within the curtilage of Bunratty Castle Hotel (Protected Structure, RPS No. 077).
Of existing canopy, food truck and coffee dock and signage for the same in front of the Jilly & Joe's Restaurant & Courtyard at the Meadows & Byrne Courtyard as well as external toilets in container at the back of Jilly & Joe's Restaurant & Courtyard near the chocolate shop at the Meadows & Byrne Courtyard