Of the following which are at variance from that granted under Planning Ref. P97/805. (A) Revised location and finished floor level of existing dwelling plus 3 no. enlarged windows on norther gable and wheelchair accessible ramp to front elevation. (B) Revised location, design and finished floor level of existing private garage. (C) Revised site boundary. (D) All associated ancillary siteworks
To renovate and extend existing residential property, with works to include part demolition of existing building and all necessary ancillary services
For development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
For demolition of outbuilding and existing extension, refurbishment and alterations of existing dwelling house and construction of a new extension, car port and outbuildings along with all associated works
To construct an open terrace viewing stand with all necessary ancillary services
Of existing extension and alterations to the existing retail premises
For development which will consist of (a) Before school breakfast club 8 -9 am (b) Playschool 9-12 noon (c) Preschool after care 12-1 pm (d) After school care 1-5.30pm
The development consist of 1) Retaining Playschool in meeting room number two; 2) Changing meeting room number one into a playschool c/w ancillary site works
Of the rear extension to the rear of the existing dwelling house, along with all associated site works
To erect 5 No dwellings & foul sewer treatment systems & percolation areas, to connect to ancillary services and to develop service road and new site entrance
The development will consist of a general purpose room plus ancillary site works
To construct a new dwelling house and private garage with connection to main sewer and water services with all necessary ancillary works
The development will consist of a slatted house c/w tanks and ancillary site works
To demolish existing out-offices and construct a private art/music studio with associated ancillary siteworks
Of existing private storage shed
For development of a dwelling house, proprietary wastewater treatment plant with polishing filters, a private garage entrance and associated ancillary site works.
To construct extension to gable / rear of existing dwelling house, plus all ancillary site works
To construct a granny flat to the side of an existing dwelling house along with all associated works
To upgrade and extend existing derelict house, to demolish shed and to install foul sewer system + percolation area
The development will consist of a slatted house c/w ancillary site works
To construct an extension and carry out alterations to an existing house along with all necessary associated works
Of the relocation of house, garage, entrance, site boundaries and septic tank along with all associated works
For development, the development is located in the townlands of Ballykett, Tullybrack East and Tullybrack, Kilrush, Co Clare. The Development will consist of the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m. The development will also consist of the construction of crane hardstand areas and turbine foundations, new site entrance onto the L6132, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of one no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of one no. permanent electrical substation, ancillary forestry felling to facilitate construction of the Development, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The Planning Application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Assessment (NIS)
Of the first floor extension and associated site works
To RETAIN the under-construction extension to the rear of the existing dwelling house and planning PERMISSION to complete the construction of same extension and to upgrade the existing wastewater treatment system along with all associated site works
To demolish an existing dwelling house and outbuildings and to construct a replacement dwelling, with all associated works
To RETAIN extension works to existing dwelling and site entrance also permission to complete works including all ancillary site works.
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To construct a granny flat to the side of an existing dwelling house along with all associated ancillary works
To construct a new dwelling house, access road, entrance, private garage, connection to existing public sewerage & water services along with all associated works
For the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m, the construction of crane hardstand areas and turbine foundations, the creation of a new site entrance onto the L6132, construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of 1 no. permanent 38kV electrical substation, 2 no. permanent spoil storage areas, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation, all ancillary forestry felling to facilitate construction including the development of one no. borrow pit, vertical realignment of an existing crest curve on the L6132. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Statement (NIS)
To construct a new dwelling house, access road, entrance, and install a new wastewater treatment system along with all associated works
Of (a) extension to existing dwelling house (b) private garage / store (c) new entrance to existing dwelling house
To demolish the existing rear extension and to construct a new extension at the rear of his dwelling house to include the decommissioning of the existing septic tank, to be replaced with a new sewage treatment system with all necessary ancillary services
To demolish part of the existing dwelling house and to construct an annex extension to the dwelling house to include minor elevational changes and the upgrade of the existing wastewater treatment system along with all other associated site works and services.
Of existing domestic garage/shed plus all ancillary site works
For the construction of a new dwelling house and garage, complete with a sewage treatment system and ancillary works
To RETAIN existing rear extension as constructed and PERMISSION to construct new extension also to rear of existing dwelling with a private garage, decommission existing septic tank system and upgrade to a proprietary wastewater treatment plant with percolation area and associated ancillary siteworks
To close up existing entrance, construct new vehicular entrance to existing dwelling house, and PERMISSION to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works
To construct dwelling house, garage, entrance, waste water treatment system and percolation area plus all ancillary site works
To RETAIN and complete extension. The development consists of retaining and completing extension to the rear of the existing dwelling and renovating the existing building
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
Of the following: front, rear and gable extensions to existing dwelling with minor elevational changes, 2 No. existing domestic sheds, front boundary/access treatment plus all ancillary site works
To extend existing dwelling house, install foul sewerage treatment plant and percolation area
Of the following development consisting of the construction of an entrance and front boundary wall to dwelling
For the construction of an extension to the rear of an existing derelict dwelling house along with alterations/renovations to the existing house and the construction of a new entrance, access road and a new wastewater treatment system along with ancillary works
To demolish an existing farm shed and planning PERMISSION to construct a slatted house along with all associated works
To build a new dwelling house, a private garage with new on-site sewage treatment system and all necessary ancillary services.
To construct a new dwelling house, site entrance and on-site wastewater treatment system along with all other associated site works and services
To install a new effluent treatment sytem to serve existing dwelling, with all associated site works