For alterations and extension to existing dwelling. Works include alterations to plans and elevations, upgrading of treatment system and percolation area, alterations to site layout, site boundaries and all ancillary works. Planning PERMISSION is also sought for domestic garage
To construct a new part two-storey dwelling & part single story dwelling house with detached domestic garage, form new vehicular site entrance onto existing laneway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works
To construct fully serviced detached dwelling, incorporate wastewater treatment system/percolation area, entrance walls and piers and carry out associated site works
For development which will provide for the the upgrade of the Ballyhaise Wastewater Treatment Plant and will generally comprise of the following: the construction of a new storm water holding tank complete with internal cleaning system, internal storm return pumps, access ladder and platform; construction of new sludge drying reed beds complete with sludge feed and filtrate return pipework and also a filtrate return pumping station; construction of new storm water forward feed and final effluent wash water pumping stations; installation of a kiosk to house electrical switchgear and all ancillary site works
To erect single storey extension to the side of existing dwelling, attic conversions to living accommodation, connection to existing services, alterations to floor plans and elevations, demolition of existing domestic store and all ancillary works
To erect a fully serviced storage extension to side of existing waste handling unit (waste permit WFP-CN-21-0003-01 relates to this facility) and all ancillary site works
To retain alterations to existing front elevation to existing bungalow, alterations to previous approved site boundaries and all associated alterations
Of development from previously granted planning reference no.s 17/467 & 15/142 to consist of: (1) retention of alterations to office extension (2) retention of ESB substation and associated plant (3) retention of Rainwater harvesting tanks and associated infrastructure (4) retention of alterations to parking areas, landscaping and all associated and ancillary works
For the erection of a single storey extension to side of existing dwelling, associated alterations to plans and elevations and all associated and ancillary works
To alter location of previously approved attenuation tank (Pl. Ref. 11/326) and all associated works
For pitched roof to existing porch of bungalow
For (a) Part demolition of existing single storey 1974 Post Primary School building (b) construction of a mixture of 2 and 3 storey extension to the front and side of the existing school building which will be connected to the existing school by new link bridge at first floor level. The proposed development will include PV panel installation on the roof of the 2-storey element together with some alterations and refurbishment within the existing school building. (c) Associated Site works to include a new ramp and steps access to proposed new entrance, new 38 no. car parking spaces, 30 no bicycle parking spaces, new paved courtyard social space and all associated soft and hard landscaping
To construct detached dwelling, detached domestic garage, incorporate wastewater treatment system/percolation area, entrance walls and piers and carry out associated site works
For: 1) Alterations to the Waste Processing Building, including: 1.1) Repositioning of the southernmost loading door at the front of the building by one bay to the left/southwest. 1.2) Construction of a below floor level outgoing loading ramp for the southernmost loading door measuring 17m (L) x 4.5m (B) x 2.15m (D). 1.3) Construction of a below floor level skip intake pit within the eastern corner of the building measuring 12.8m (L) x 12.5m (B) x 3.8m (D). 2) Extension of the Front Yard southeast by 15m. 3) Repositioning of the Site Entrance 5m south. 4) Repositioning of the Weighbridges and Weighbridge Kiosk east-northeast by up to 43m. Reconfiguration of the Weighbridge Kiosk. 5) Construction of an Entrance Ramp measuring 44.4m (L) x 14.1m (B) x 2.4m (H) from the Site Entrance to the Weighbridges. 6) Construction of a Retaining Wall measuring 44.4m (L) x 0.35m (B) x 2.7m (H) between the Front Yard and Entrance Ramp. 7) Repositioning and reconfiguration of the Administration and Welfare Facility and car parking areas. 8) Construction of a Storage Building measuring 3.0m (L) x 2.9m (B) x 2.5m (H). 9) Repositioning of the Lorry Parking Area from south boundary to the east boundary and increase in parking spaces from 9 No. to 10 No. 10) Repositioning of the Odour Control Unit 25m northeast and reconfiguration of the unit. 11) Installation of a Baler and construction of Shed Over measuring 36.2m (L) x 8.5m (B) x 13.5m (H). 12) Recontouring of an embankment area to the north of Rear Storage Yard to be level with the Rear Storage Yard covering an area of 730m². 13) Construction of a Firewater Storage Tank measuring 3m (radius) x 8.0m (H) and Pump Building measuring 12.2m (L) x 2.4m (B) x 3m (H) located within the recontoured area. 14) Repositioning of approximately 40m of northwest boundary fence by 8m inwards towards the centre of the site. 15) Repositioning of the Substation from within Waste Processing Building to 13m west outside of the building. The Substation measures 11.2m (L) x 4.4m (B) x 3.0m (H). 16) Installation of 2 No. Generators. 17) Repositioning of 2 No. diesel tanks from northeastern boundary of the Waste Processing Building to 10m west of the building. 18) Additional area of landscaping along the western boundary of the site measuring 600m². This application is accompanied by an EIA Screening Report, AA Screening Report, Planning and Environmental Report and Drawings
To retain works and alterations to previously approved permission (02/370). Alterations include revised dimensions and location of the single-storey domestic garage. Additional entrance door on east façade, 1 additional window on the south façade and 1 additional window on the west façade. Relocation of the sewage treatment system, associated modifications to the originally approved drainage layout and associated driveway modifications at the above address
For development consisting of the replacement of an existing 10m high support pole carrying associated antennae for a 24 metre high free standing communications structure with its associated antennae, communication dish, ground equipment and all associated site development works. The development will continue to form part of existing 3G and 4G Broadband Network. Significant further information and revised plans have been submitted.
Retain single storey fully serviced extension which partially integrates the rear domestic garage & all associated works
For development consisting of a new dormer dwelling house, waste water treatment system and percolation area, vehicular entrance, entrance walls and piers together with all ancillary site development works
To decommission existing septic tank and install new sewerage treatment unit and percolation area and all ancillary works at Cullies, Drumalee, Co. Cavan
To erect new dwelling house, domestic garage, entrance, boundary walls, piers with sewerage treatment system & percolation area. Significant further information has been received
For: i) Works to facilitate infill and re-contouring of the subject lands to facilitate use for agricultural purposes. ii) will require a waste facility permit and / or article 27 approval from EPA. iii) All associated works and services. The application is accompnanied by a Natura Impact Statement (NIS)
To retain development consisting of single storey front extension to facilitate a hairdressing salon and single storey front extension to facilitate an office and associated work
For the erection of a part two story/part single storey farm dwelling with attached carport, site entrance, wastewater treatment system, percolation area and all ancillary site works
Construct a four bay shed which will consist of slatted area with slurry holding tank underneath, cubicles and all associated site works
The development will consist of the provision of a total of 134no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 109no. residential dwellings which will consist of 6no. 1bed units, 39no. 2 bed units, 59no. 3 bed units and 5no. 4 bed units. The residential dwellings range in height from one to two storeys. (c) The provision of a total of 25no. duplex apartment units consisting of 15no.1 bed units and 10no. 2bed units. The duplex apartment units range in height from two to three storeys. (d) Provision of a single storey creche with associated parking, bicycle and bin storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (h)The provision of an internal culvert along with decommissioning of existing drainage channel within the site. Culvert works to include for provision of a headwall at the outfall to the watercourse. (i) Creation of a new access point from the public road with associated works to include for a connections to the existing public footpath along with a pedestrian crossing point. (j) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required. (k) Provision of residential communal open space and public open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (l) Internal site works and attenuation systems which will include for provision of a hydrocarbon and silt interceptor prior to discharge. (m) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul via a rising main and provision of a foul pumping station, water connections and ESB network connection to include for provision of a substation. A Natura Impact Statement (NIS) has been prepared
To erect detached domestic garage, alterations to site boundaries and all ancillary works
To demolish existing rear outhouses, alter & extend existing single storey dwelling, improve existing road entrance access, connect new works to existing site services & all ancillary site works
For 1 No agricultural entrances onto existing public road including new boundary fence and all associated works
For the redevelopment of existing single storey dwelling house to include elevational changes with the construction of a single storey extension to the rear and storey and a half extension to the side together with all ancillary site development works
To 1. demolish existing single storey toilet block and canteen. 2. demolish existing assembly shed 3. demolish existing steel cutting building and associated parts 4. construct extension to existing workshop building to accomodate - steel cutting and fabrication. 5. construct extension to existing workshop building to accomodate paint shed. 6. construct new ESB sub station and associated works 7. re-arrange existing yard area. 8. Provide screening and landscaping. 9. And carry out associated site works. 10. to RETAIN fabrication and assembly building
To carry out the following alterations & works to an existing dwelling house. (1) To demolish single storey section to side & rear of dwelling house; together with detached domestic garage to side of property, and disused outbuilding to the rear of the property. (2) To construct a new part single storey & part two-storey extension to side & rear of existing dwelling house building. (3) To make some minor alterations to the front elevation of the dwelling house, and (4) To upgrade existing septic tank system to a new approved proprietary wastewater treatment system & percolation area, together with all associated site development works
Is sought for the following (1) Permission to alter floor plans and elevation to house No's. 22, 23 and 24 on all associated works, (2) Permission to RETAIN alterations to floor plans and elevation to house No. 25 to include front porch, rear extension and rear attic window (previous approved planning reg 19/158 & 17/103 relates)
To carry out alterations to front elevation, extend and alter rear of dwelling and all associated works
To retain and complete alterations to floor plans & elevations to house no. 22 (previous approved planning reg: 19/158 & 17/103)
For the development of construction of fully serviced bungalow type dwelling on existing foundations of previously approved Planning. Ref. 04/1850 and 06/665 with connection to existing services and all ancillary works
To erect fully serviced 2 storey dwelling, attached domestic garage, entrance walls and piers, install sewerage treatment facilities and all ancillary site works
To consist of alterations to plans and elevations reducing bedroom accommodation from 160 No. to 112 No. and all associated works to Nursing Home Building previously permitted under planning reference 19/236
Carry out alterations to previously approved planning reg no 19/228 as follows: change house types to plots 13a and 13b (2 no. three bed single store semi-detached dwellings) to 2 no. three bed detached bungalows with optional habitable attic accommodation, connect to existing mains services, associated siteworks and all ancillary works
For a fully serviced 2 Storey 112 No. Bed Nursing Home, parking provision, landscaping, access via existing service road (granted under Pl. Ref: 19/236), connection to existing services and all ancillary site works. SIGNIFICANT FURTHER INFORMATION INCLUDING AND NIS HAS BEEN SUBMITTED
For conversion of existing attached domestic garage to habitable accommodation, modification of existing garage door opening to form new window on front elevation and all ancillary works
To retain alteration from flat roof to pitched roof together with minor extensions and alterations to services/site layout at existing dwelling
To retain the following, (A) Single storey lean to conservatory to front of existing dwelling and (B), Detached domestic storage shed & all ancillary works
To carry out renovations and extensions to existing two storey dwelling. Works to include erection of extensions to front and side of the existing dwelling, raising of roof level, associated alterations to elevations and all ancillary site works
To erect single storey extension to side of existing dwelling, alterations to associated elevations, upgrade of sewerage treatment facilities & all ancillary works
For 1.Erect detached machinery shed within existing concrete yard. 2. Retain existing domestic garage to the rear of the dwelling. 3. Complete surfacing of partially completed driveway to side of dwelling
To erect fully serviced single storey extension to existing building to form new dining area with associated alterations to elevations and ancillary works
Demolish existing uninhabitable dwelling and erect fully serviced storey and a half type building incorporating reception area, admin offices, café & wc facilities on the ground floor & training/classroom & ancillary areas on the first floor, connection to existing services and all ancillary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application
To 1. refurbish existing dwelling 2. construct extension to side and rear of existing dwelling 3. carry out associated site and enabling works
To erect fully serviced 3 storey Medical Centre, the extension of existing access road, associated parking, drop off areas, associated bicycle spaces, connection to public foul drainage system and watermain, landscaping and all ancillary site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application. Significant further information and revised plans including a Natura Impact Statement has been submitted.
Construction of a New Transfer to Laboratory Building, proprietary waste water treatment system, enclosed yard, new gates, access roadway, modification to existing farm entrance and associated siteworks