The construction of a dwelling house, detached garage, recessed entrance, wastewater treatment plant and all ancillary site worksDecision record indexed
A two storey pitched roof extension with 4 No Velux roof windows to the rear of the property and 3 No Velux roof windows to the front to of the property and Planning Permission for replacement of existing sewage treatment system with new sewage treatment system and new percolation area together with ancillary worksDecision record indexed
The construction of a dwelling house, domestic garage, installation of a waste water treatment plant and tertiary treatment system and to upgrade and use the existing agricultural entrance to the site and all ancillary site worksDecision record indexed
The demolition of a porch to the front of house and a flat roofed extension to the rear, also to construct a two storey extension to the side of the house and a single storey extension to the rear of house including a new effluent treatment systemDecision record indexed
Raised pitched roofs [2no.] of existing cottage to form first floor area comprising of 2no. bedrooms, bathroom, landing & attic store. New pitched roofs to include 2no. dormer windows, & 2no. Velux roof lights to front eleva-tion. New raised section of external walls & gables [timber framed] to be finished with smooth sand/ cement render. New windows to replace existing at ground floor level including new window to replace existing front entrance door [re-located]. New two storey gable [south east] & rear extension to include new front entrance, stairwell, utility & WC. Ino. Velux roof light to front roof slope & 3no. Velux roof lights to rear roof slope extension]. Internal modifications to existing ground floor [cot-tage]. Installation of new waste water system incl. percolation area. New timber post & rail fence to front boundary including new vehicular entrance and associated site worksDecision record indexed
The renovation of dwelling to include raising floor and roof levels by 0.6m, reconstruction of side element and gable walls, construction of an extension to the rear and Retention permission for mobile home and utility/porch area for duration of build and all associated site worksDecision record indexed
The construction of a new detached garage, retention permission for the foundation slab as constructed and all associated site worksDecision record indexed
Completion of the construction of existing dwellinghouse, currently at blockwork complete stage and associated site works including wastewater treatment system and entranceGrounds not yet categorised
Dwellinghouse as partially constructed and for permission to complete the construction of aforementioned dwellinghouse and associated site works including wastewater treatment system and entranceDecision record indexed
An extension to existing childcare facilities, with the construction of a two storey training staff accommodation annex (Area=175m2) to include for 6 No. En-suite bedrooms with kitchen/living accommodation with new on-site wastewater treatment system for the entire facility, with amendments to carparking arrangement, associated access and boundaries with ancillary site worksGrounds not yet categorised
The dwelling house as constructed(which is located circa 20m further back in the site from where it was originally approved); the domestic garage as constructed(which is located circa 20m further back in the site from where it was originally approved); the on -site wastewater treatment & disposal system as constructed(which is located circa 40m further forward in the site from where it was originally approved); site entrance as constructed; front/roadside boundary treatment as erected & landscaped; side/northern boundary treatment as erected & landscaped(which omits the 6ft. high screen wall, referred to in the previous planning permission) and all associated ancillary worksDecision record indexed
The conversion of attic of existing house containing 2 bedrooms, bathroom & storage to be used as part of existing house together with the addition of 2 dormer windows & velux to front of houseDecision record indexed
The construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site worksGrounds not yet categorised
The construction of a single storey extension to the rear and side of existing dwelling house, dormer extension to the rear and all ancillary site worksDecision record indexed
The construction of a single storey extension to the side of existing dwelling house, dormer extension to the rear, waste-water treatment system, percolation area, and all ancillary site worksDecision record indexed
The construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter; together with all associated site worksDecision record indexed
A new split level single storey dwelling house and domestic garage, new site entrance, wastewater treatment system, including all ancillary site works above and below ground. Permission is also being sought for the demolition of existing cottage and outbuildingsDecision record indexed
Alterations to Permitted governing planning permission reference number 24/60691 to retain alterations to site boundaries, retain as built subfloor and ground floor blockwork of house and garage as constructed. Permission is also being sought to alter the location of the permitted wastewater treatment system and polishing filter and complete the construction of house and garage together with all associated site worksDecision record indexed
The construction of a vehicular entrance, dwelling house, domestic garage, proprietary waste water treatment system with polishing filter together with all associated site worksDecision record indexed
For the change of house type under previously permitted governing planning permission reference number 21-1456 together with all associated site worksDecision record indexed
The construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site worksDecision record indexed
The construction of an entrance, dwelling house, domestic garage, septic tank & percolation area together with all associated site worksDecision record indexed
Construction of a new dwelling house, installation of a wastewater treatment system, bored well, upgrading existing agricultural entrance to the site, together with all associated site development worksDecision record indexed
Altering the design of the private dwelling, change of site layout and revisions to the garage design from that previously granted under planning application reference 23/60232 and to replace it with a a new single-story dwelling, a detached domestic garage, wastewater treatment system, percolation area, site entrance, and all associated site worksDecision record indexed
The construction of a two storey dwelling house, detached domestic garage, wastewater treatment system, percolation area. entrance and all ancillary site worksDecision record indexed
The construction of a new dwelling, garage, wastewater treatment system & polishing filter, entrance and all associated site worksDecision record indexed
Demolition of existing single storey lean-to extension to rear(south), alterations to fenestration to front(north) elevation, stone cladding to existing porch, new part two storey part single storey extension to side(east) and rear(south) with car port, new on site waste water treatment system and all ancillary site worksDecision record indexed
The construction of a vehicular entrance, dwelling house, domestic garage, domestic wastewater treatment system with polishing filter together with all associated site worksDecision record indexed
The following: a domestic garage, a wastewater treatment system and percolation area as constructed, permission was granted under planning application reference 96/1509 and all associated site worksDecision record indexed
Construction of a new single storey dwelling house, detached domestic garage, new entrance, onsite wastewater treatment system, connection to necessary services and all associated incidental worksDecision record indexed