For development which will consist of a 60M x 30M Astro Turf playing surface, 2 no. changing rooms and toillets, 2 no. storage facilities, kerbing with open graded permeable stone surface for 30 existing car park spaces and all associated site works. A Natura Impact Statement accompanies this application
For development which will consist of the construction of a detached domestic single storey garage and home gymnasium for use ancillary to the enjoyment of the existing dwelling house on the site and all associated site works
To demolish existing lean-to shed, construct extension comprising bedroom, bathroom, utility and all associated site works
For development at the existing Ballycannon Wastewater Treatment Plant. The development will consist of: construction of a foul pump station; construction of emergency holding tank complete with cleaning system; control kiosk; demolition of existing wastewater package treatment tank; site fencing; 660m foul rising main; and all ancillary site development works including hard and soft landscaping. A Natura Impact Statement (NIS) has been prepared and is submitted as part of the planning application
To RETAIN changes to original house plans submitted for grant of planning permission P8/18299 and planning PERMISSION to raise the front boundary wall and entrance to 2 metres with finish to match existing wall finish and associated site development works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To Extend the Appropriate Period of Planning Permission P15/86 to erect new farmhouse, office, stables, septic tank/foul sewer treatment plant, percolation area and new entrance to site
For development, the development consists of the construction of a slatted unit and associated site works
To develop a grass playing pitch with goalposts and ball stop netting on an existing grass area currently used for team training within the club grounds, with all associated site works. The planning application will be accompanied by a Natura Impact Statement (NIS)
Of vehicular entrance/side access and all associated site works to existing dwelling
To construct dwelling house, garage, waste water tratment system, percolation area, entrance and all associated site works
For development consisting of the change of roof material on the dwelling house from Thatch to Slate
Of an accessible bedroom, stables, outhouse and associated site works
For the construction of a new fully serviced two storey detached dwelling house, new single storey detached garage, new vehicular entrance landscaping and boundary treatments, new connection to existing Roo West group water scheme and installation of a new wastewater treatment system and percolation area together with all ancillary and associated site works
Of the construction of a detached garage, with all associated site works
To construct 1) Club House incorporating changing rooms and meeting room with Klargester biodisc sewage treatment plant and Ash Environmental Technologies with Wastewater Drip Distribution System in playing area; 2) Playing pitch with associated drainage works, alterations to the site levels; 3) A 30m x 45m Astroturf training pitch; 4) Car Parking to support playing pitches, site boundary fencing, provision of 2 no. vehicle entrances and all associated site works
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
Of a garage and storage shed, and all associated site works
For the following development 1) Construction of a new detached dwelling house and 2) Installation of new proprietary Effluent Treatment system
For detached single storey dwelling house and detached domestic garage, onsite wastewater treatment system and percolation area, bored well, connection to necessary services, new entrance detail together with all associated ancillary and incidental site works
To construct a new entrance, dwelling house, garage/shed, wastewater treatment system and all associated works
Of a) garage conversion and roof alterations b) sheds and playhouse together with all ancillary site development works and services
For the construction of a detached single storey dwelling, detached domestic garage, new entrance, onsite wastewater treatment system, together with all associated ancillary and incidental site works
To RETAIN dog kennels, cattery, covered run, fencing and associated site works, all as constructed
To retain as constructed shed and PERMISSION for machinery storage shed and all associated site works
For the construction of a single storey detached house, a waste water treatment and disposal system, a bored well, a new site entrance and all associated works
Of as constructed double entrance gates on front boundary and all associated site works
To construct a single storey extension to the front and side existing dwelling, including the provision of entrance gates to the existing front boundary wall and associated site works
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
Of an existing detached garage and all ancillary site works
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
Of the detached garage on site, the altered fenestration to the dwelling house, the existing entrance as built and all associated and ancillary site works
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
For the demolition of existing house and the construction of a replacement dwelling house, new recessed site entrance, connection to existing wastewater treatment system and all ancillary site works
For alterations to existing dwelling to include an attic conversion with dormer windows, velux rooflights and solar panels, new open entrance porch and stairwell, garage/store, a new boundary wall with splayed vehicular entrance, gates and piers, connection to existing mains water sewer and all associated site works
For a 10 year planning permission for a solar array at Ballyglass, Coolderry, Dromintobin North, Reanabrone, and Oakfield (townlands) Ardnacrusha, Co Clare. The development will consist of c265,000 m2 of solar panels on ground mounted frames, 8 no. single storey control cabins with associated electrical transformer units and hardstand areas, 2 no. ring main units, underground cabling within the solar array site and within the L70382 public road to connect solar array field parcels, security fencing, CCTV, access tracks (upgrade of existing and new), upgrades to four existing agricultural field entrances on the R463, l3046 and L70382 and creation of new entrance on L70382, temporary construction compound, landscaping and all associated ancillary apparatus and development works. The solar array will connect to the national grid and will have an operational lifespan of 35 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
To construct dwelling house, garage, bored well, waste water treatment system, percolation and sheared entrance and all associated site works
To construct dwelling house, garage, entrance and all associated site works
For the construction of a dwelling house, garage, wastewater treatment system, new entrance and all associated works
For change of house design, from that permitted under planning Ref No P21-844
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, shared entrance and all associated site works
To construct 60 no. dwelling houses comprising 4 no. detached houses, 20 no. semi-detached houses and 36 no. duplex units and all associated site works and services including a playground and road re-alignment. A Natura Impact Statement (NIS) has been included in the application
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
To contract a slatted slurry tank and all ancillary concrete works
To construct an Agricultural shed and associated site works
To construct garage and all associated site works
For the construction of a private dwelling house, detached garage, wastewater treatment system with percolation area, recessed site entrance and all ancillary site works
To demolish existing substandard dwelling and construct new replacement dwelling house, garage, bored well, wastewater treatment system, percolation area, new front boundary wall, entrance, demolish and rebuild part of neighbouring boundary wall to achieve sight distance and all associated site works
Of attic conversion and as constructed shed and PERMISSION for a one bed American style mobile unit for short term letting and all associated site works
Of the following as part variation of previously granted permission P08/1258: to retain A) revised entrance location, B) revised percolation area location, C) change of use of domestic garage to home office, D) domestic garage, E) first floor accommodation area to existing dwelling, F)increased ridge height and minor elevational changes to existing dwelling plus all ancillary site works