CONSTRUCTION OF A NEW DWELLING HOUSE, INSTALLATION OF SEWERAGE TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITE WORKSGrounds not yet categorised
CONSTRUCTION OF A NEW DWELLING HOUSE WITH PROPRIETARY SEWERAGE TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITE WORKSGrounds not yet categorised
ATTIC DEVELOPMENT AND ALTERATIONS TO THE FACADES TO THE EXISTING DWELLING HOUSE GRANTED UNDER REF. 95/477 AND PERMISSION FOR UPGRADING OF EXISTING TREATMENT SYSTEM & PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) CONSTRUCTION OF AN EXTENSION TO THE EXISTING FITNESS CENTRE (2) DEVELOPMENT OF NEW ASTRO TURF PITCH WITH THE ERECTION OF FENCING AND ALL ASSOCIATED SITE WORKSDecision record indexed
(1) EXTENSION TO THE SIDE OF THE EXISTING HOUSE AND (2) ATTIC DEVELOPMENT AND PERMISSION FOR CONSTRUCTION OF EXTENSION TO THE REAR OF THE EXISTING HOUSE AND ASSOCIATED SITE WORKSDecision record indexed
DOMESTIC GARAGE AND PERMISSION FOR (1) DEMOLITION OF DEFECTIVE CONCRETE BLOCK AFFECTED DWELLING, (2) CONSTRUCTION OF A REPLACEMENT DWELLING WITH CONNECTION TO EXISTING SERVICES AND (3) ERECTION OF A MODULAR GARDEN ROOM/HOME OFFICE TO BE USED AS TEMPORARY ACCOMMODATION DURING THE REBUILD OF THE DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
REFURBISHMENT, CONSTRUCTION OF EXTENSION AND ALTERATIONS TO EXISTING DERELICT DWELLING WITH INSTALLATION OF PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
(1) 3 NO. CABIN TYPE GLAMPING UNITS WITH TIMBER DECKING (2) 1 NO. OPEN HOT TUB AREA (3) 1 NO. RELAXATION HUT INCLUDING ALL ASSOCIATED SITE WORKS AND PERMISSION FOR DECOMMISSIONING OF EXISTING COMMUNAL SEPTIC TANK SERVING THE EXISTING DWELLING AND THE GLAMPING UNITS AND REPLACING WITH SUITABLE PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
(1) 2 NO. EXISTING CABIN BUILDINGS ON SITE WITH DEMOLITION / REMOVAL OF SAME ON GRANT OF PERMISSION AND PERMISSION FOR (1) CHANGE OF USE OF EXISTING TIMBER / MACHINERY STORE TO A NEW FILM STUDIO BUILDING INCORPORATING TWO SEPARATE STUDIO AREAS WITH A VP WALL, RECEPTION / OFFICE AREAS AND PROP STORAGE TOGETHER WITH AN EXTENSION TO THE SIDE OF THE BUILDING AND ELEVATIONAL AMENDMENTS TO THE EXISTING SHED BUILDING, (2) DEVELOPMENT OF NEW CAR AND BUS PARKING AREAS WITH ASSOCIATED FOOTPATHS AND STREET LIGHTING, (3) ERECTION OF SIGNAGE LOCATED ON SITE WITH DIRECTIONAL BOARDING AND (4) INSTALLATION OF A SEWAGE TREATMENT SYSTEM TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY WASTE WATER TREATMENT SYSTEM & PERCOLATION AREA AND ASSOCIATED SITE WORKSDecision record indexed
(1) DEMOLITION OF A MICA AFFECTED HABITABLE DWELLING (2) PROVISION OF FIRST FLOOR LIVING ACCOMMODATION AND STORAGE WITHIN AN EXISTING DETACHED SHED INCLUDING CONNECTION TO THE EXISTING WASTEWATER TREATMENT SYSTEM (3) RECONSTRUCTION OF THE ABOVE DWELLING WITH CONNECTION TO EXISTING WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) CHANGE OF USE OF EXISTING TIMBER/MACHINERY STORE TO A NEW DISTILLERY BUILDING WITH (A) VISITOR EXPERIENCE, (B) RECEPTION AREA, (C) SHOP DISPLAY, (D) CANTEEN, (E) DISTILLERY VIEWING AREA, (F) BONDED WAREHOUSE AND OFFICE ACCOMMODATION, (2) CONSTRUCTION OF A FRONT AND REAR EXTENSION WITH ELEVATIONAL AMENDMENTS, (3) INSTALLATION OF SILO UNITS TO THE REAR OF BUILDING, (4) DEMOLITION OF PART OF EXISTING SHED BUILDING, (5) RAISING OF THE ROOF OF EXISTING STORAGE SHED TO DEVELOP FIRST FLOOR OFFICE ACCOMMODATION, (6) ERECTION OF SIGNAGE LOCATED ON SITE WITH DIRECTIONAL BOARDING, (7) CONSTRUCTION OF 2 NO. BORE LINED WELLS WITH FENCING TO PERIMETER OF DISTILLERY BUILDING, (8) CONSTRUCTION OF A HOLDING POND, (9) DEVELOPMENT OF A NEW CAR AND BUS PARKING AREA WITH ASSOCIATED PATHS AND STREET LIGHTING, (10) ERECTION OF 4 NO. GLAMPING PODS ON SITE WITH ASSOCIATED PATHWAYS AND ACCESS ROUTES, (11) INSTALLATION OF A NEW COMBINED SEWAGE TREATMENT SYSTEM WITH DECOMMISSIONING OF THE EXISTING SEPTIC TANK ON SITE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A TWO STOREY DWELLING HOUSE & DETACHED PRIVATE GARAGE, SEWERAGE TREATMENT UNIT, PERCOLATION AREA, VEHICULAR ENTRANCE ONTO THE ADJOINING PUBLIC ROAD, ACCESS LANE TO THE HOUSE, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF THE EXISTING REAR EXTENSION (2) DECOMMISIONING OF THE EXISTING SEPTIC TANK (3) ERECTION OF NEW FRONT PORCH & ATTACHED DOMESTIC GARAGE / CAR PORT TO THE GABLE END WITH MINOR ALTERATIONS TO ALL FACADES (4) DEVELOPMENT OF EXISTING ATTIC TO PROVIDE FOR LIVING ACCOMMODATION INCORPORATING DORMER WINDOWS TO THE FRONT & REAR ELEVATIONS (5) INSTALLATION OF NEW SEWERAGE TREATMENT SYSTEM (6) ERECTION OF A NEW DETACHED DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF PART OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF EXTENSION WITH ALTERATIONS TO ALL FACADES, CONNECTION TO ALL EXISTING SITE SERVICES, AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF AN OUTBUILDING FOR USE AS A HOME OFFICE AND DOMESTIC GARAGE ADJACENT TO EXISTING DWELLING INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKSGrounds not yet categorised
ERECTION OF AN EXTENSION TO THE SIDE AND REAR OF THE EXISTING DWELLING HOUSE, NEW DETACHED DOMESTIC GARAGE TO THE SIDE OF THE DWELLING HOUSE AND ASSOCIATED SITE WORKSDecision record indexed
(1) DEMOLITION AND CONSTRUCTION WORKS CARRIED OUT TO ORIGINAL COTTAGE INCLUSIVE OF NEW BLOCK WORK WALLS AND NEW SUBFLOORS AND 2 NO. EXTENSIONS TO EXISTING STUDIO BUILDING AND PERMISSION FOR (1) REINSTATEMENT OF ORIGINAL COTTAGE USING TRADITIONAL TECHNIQUES TO INCLUDE A NEW REPLACEMENT TRADITIONAL THATCHED ROOF, (2) MINOR ELEVATIONAL CHANGES TO THE COTTAGE TO INCLUDE A SMALL TRADITIONAL VESTIGIAL PORCH TO FRONT DOOR AND A PICTURE WINDOW TO WEST SIDE GABLE, (3) DEMOLITION OF PARTIALLY CONSTRUCTED TOILET AND BOILER ROOM TO REAR (NORTH) OF COTTAGE AND DEMOLITION OF PARTIALLY CONSTRUCTED PORCH TO FRONT OF COTTAGE, (4) CONSTRUCTION OF A NEW EXTENSION TO THE REAR (NORTH) SIDE OF THE COTTAGE AND (5) CONNECTIONS TO ALL SERVICES APPROVED UNDER PL. REG. REF. NO. 19/50344 AND ALL ASSOCIATED SITE WORKSDecision record indexed
EXTENSION, RENOVATION AND REFURBISHMENTS AT THE LAKEHOUSE HOTEL, CURRENTLY NOT OPERATING DUE TO ONGOING BUT STALLED WORKS OF REFURBISHMENT AND CONSISTING OF THE FOLLOWING: (1) EXTENSIONS TO FOOTPRINT OF THE MAIN HOTEL ADDING A GUEST BEDROOM FOR ACCESSIBLE USE TO THE EXISTING DETACHED SINGLE STOREY BEDROOM AND STORAGE BUILDING, (2) SMALL EXTENSIONS TO THE FOOTPRINT OF THE MAIN HOTEL BUILDING ALONG THE EAST SIDE AT GROUND FLOOR LEVEL TO PROVIDE FOR ENLARGED PLANT, STORAGE AND UTILITY SPACE AS WELL AS A NEW REAR ENTRANCE TO THE HOTEL ADDING APPROXIMATELY 75 SQ.M TO THE EXISTING OVERALL FLOOR AREA OF CIRCA 1,035 SQ. M, (3) ROOFING WORKS ASSOCIATED WITH THE EXTENSIONS LISTED AT NO. 1 & NO. 2 AND REROOFING WORK ASSOCIATED WITH THE CHANGE TO THE OVERALL ROOF PROFILE AND SHAPE INCLUDING THE RAISED LEVEL OF PARTS OF THE EXISTING ROOF AND THE REMOVAL OF THE GABLE FACING WEST, DORMER WINDOWS FACING WEST AND EAST WITH THE CONTINUATION OF THE NEW PITCHED ROOF PROFILE OVER THE EXISTING CENTRAL FLAT ROOF SECTION, (4) AMENDMENTS TO THE FENESTRATION AND WALL FINISHES RESULTING IN AMENDED ELEVATIONS, (5) DETACHED SINGLE STOREY STORAGE BUILDING AND (6) SITE BOUNDARY WALLS, GENERAL SITE WORKS AND DRAINAGEDecision record indexed
EXISTING TIMBER FRAMED GLAMPING POD INCLUDING ALL ASSOCIATED SITE WORKS AND PERMISSION FOR INSTALLATION OF A PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSGrounds not yet categorised
EXISTING TIMBER FRAMED GLAMPING POD AND THE CHANGE OF USE TO A DOMESTIC DWELLING AND PERMISSION FOR (1) EXTENSION TO EXISTING BUILDING AND, (2) INSTALLATION OF A PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSGrounds not yet categorised
REFURBISHMENT, CONSTRUCTION OF EXTENSION AND ALTERATIONS TO EXISTING DWELLING WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
1 NO. CABIN TYPE GLAMPING UNIT AND PERMISSION FOR (1) CONSTRUCTION OF 2 NO. CABIN TYPE GLAMPING UNITS (2) INSTALLATION OF A PROPRIETARY WASTEWATER TREATMENT SYSTEM TO SERVE THE 3NO. GLAMPING UNITS AND ALL ASSOCIATED SITE WORKSDecision record indexed
CHANGE OF USE FROM RESOURCE CENTRE TO A DWELLING HOUSE WITH CONNECTION TO ALL EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING CONSERVATORY AND ERECTION OF AN EXTENSION TO THE GABLE END OF EXISTING DWELLING HOUSE WITH ADDITIONAL ALTERATIONS TO ALL FACADES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED AS PART OF THE APPLICATIONDecision record indexed
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE, (2) AN ACCESSWAY THROUGH THE BERMS, ON LAND FORMERLY PART OF THE CAR PARK, (3) WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE. THE WATER TANK WILL BE SUPPLIED PRIMARILY FROM THE EXISTING WATER MAIN WITHIN THE COURSE AND FROM A FUTURE RAINWATER HARVESTING SYSTEM SUPPLIED FROM THE GUTTERS ON THE ROOF OF THE ADJOINING MAINTENANCE SHED. THIS SUPPLY WILL BE IN SUBSITUTION TO THE PRESENT SUPPLY FROM THE EXTRACTION SOURCE APPROVED IN 2004, AND (4) BOUNDARY FENCING ALONG DUNES TO THE NORTH-WESTERN TIP OF THE COURSE, IN AN AREA DESIGNATED IN THE COUNTY DONEGAL DEVELOPMENT PLAN 2018-2024 AS ESPECIALLY HIGH SCENIC AMENITYGrounds not yet categorised
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDMENTS TO THE GOLF COURSE EQUIPMENT SHED APPROVED UNDER PLANNING REFERENCE 18/50855 INCLUDING THE PROVISION OF ADDITIONAL FLOOR AREA OF 159 SQ.M AND FENESTRATION MODIFICATIONS (5) BOUNDARY FENCING ALONG DUNES TO THE NORTH-WESTERN TIP OF THE COURSE, IN AN AREA DESIGNATED IN THE COUNTY DONEGAL DEVELOPMENT PLAN 2018-2024 AS ESPECIALLY HIGH SCENIC AMENITYDecision record indexed
EXTENSION AND RENOVATIONS TO EXISTING DWELLING CONSISTING OF (1) INCREASING THE EXISTING RIDGELINE TO PROVIDE FIRST FLOOR ACCOMMODATION, (2) ALTERATIONS TO ALL FACADES, (3) UPGRADING OF EXISTING SEPTIC TANK SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
REFURBISHMENT AND CONSTRUCTION OF EXTENSION TO EXISTING COTTAGE, INCLUDING INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM, AND ALL ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF A SHED FOR THE PURPOSE OF A THATCHING SCHOOL WITH CONNECTION TO ALL EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A CAMPER VAN PARK CONSISTING OF THE FOLLOWING: (1) 10 NO. CAMPER VAN PARKING BAYS WITH ASSOCIATED SERVICES, (2) INTERNAL PATHWAYS, LANEWAYS AND ADDITIONAL PARKING AREAS, (3) PLAY AREA AND PICNIC BENCHES WITHIN GREEN AREAS, (4) SERVICE BUILDING CONTAINING SHOWERS / TOILETS / RECEPTION AREA ETC., (5) INSTALLATION OF NEW ON-SITE SEWAGE TREATMENT SYSTEM AND PERCOLATION AREA AND (6) PROPOSED NEW SIGNAGE BOARD AT ENTRANCE TO SITE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSGrounds not yet categorised
AUXILIARY SITE WORKS AND PERMISSION FOR ERECTION OF A DOMESTIC EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
RENOVATION WORKS TO EXISTING DWELLING HOUSE, WORKS WILL INCLUDE ALTERATIONS TO ALL FACADES, REMOVAL OF EXISTING DORMER WINDOW AND BAY WINDOW AND TO RE-ROOF PART OF THE EXISTING ROOF AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
AUXILIARY SITE CLEARANCE WORKS AND PERMISSION FOR (1) DEMOLITION OF THE REAR TWO STOREY EXTENSION (2) CONSTRUCTION OF (A) FRONT PORCH EXTENSION (B) TWO STOREY AND SINGLE STOREY EXTENSIONS TO THE REAR OF THE EXISTING DWELLING HOUSE (C) DOMESTIC GARAGE WITH COVERED OUTDOOR AREA (3) CONNECTION TO EXISTING SEPTIC TANK AND UPGRADING OF PERCOLATION AREA TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING DWELLING HOUSE AND ERECTION OF A NEW REPLACEMENT DWELLING HOUSE WITH CONNECTION TO ALL EXISTING SITE SERVICES AS PREVIOUSLY GRANTED UNDER PLANNING REFERENCE 21/50337 TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed