A) the relocation of and minor alterations to the rear extension previously granted permission under planning no. 066119, b) the construction of a detached domestic garage to the rear of the existing dwelling and c) all associated works
Erect a two-storey dwelling with garage and connect to existing mains services along with all associated site development works
To construct an 18m² greenhouse conservatory to the side of the existing dwelling along with all associated site development works
Proposed first floor extension to the side of dwelling and associated works
Demolition of a single storey house and the erection of a terrace of four two-storey houses and a terrace of three two-storey houses (both terraces to have first floor balconies), associated siteworks (including alterations to entrance of adjoining property to the north) and new vehicular entrance onto public road
The demolition of a single storey house and the erection of a terrace of four two-storey houses and a terrace of three two-storey houses (both terraces to have first floor balconies), associated site works and new vehicular entrance onto public road
Prefabricated structure, 31.2sqm in area and comprising a service station shop and office, for a temporary period of 3 years
Single storey cottage type dwelling, wastewater treatment unit and raised percolation area to current EPA specifications, plus bored well and site entrance, together with all associated site works
Erect a two-storey dwelling with detached garage and connect to existing mains services along with all associated site development works
Modifications to the permission granted under application register reference 21/1193, which approved the redevelopment of the service station. The modifications proposed to the approved scheme comprise: 1. The inclusion of solar PV panels and associated fixtures and fittings on the roof of permitted station building. 2. An extension of 8.44m to the width of the permitted forecourt canopy. 3. The inclusion of an additional fuel dispenser island, to bring the total number to three 4. associated revisions to the permitted site layout, including the removal of 4 no. previously permitted car parking spaces and relocation of air and water services 5. All associated site development works
(i) demolition of existing roadside fuel forecourt and associated canopy (ii) demolition of southern part of existing premises, (iii) construction of a new 3 island fuel forecourt associated illuminated canopy, underground and overground fuel infrastructure, (iv) internal and external alterations and Change of Use of existing premises to provide a new forecourt amenity building with retail area (100 sq.m max), ancillary restaurant/café area with hot and cold meals and refreshments for sale for consumption on and off the premises, associated Customer seating, ancillary Off-Licence, Customer WCs, Back of House with ancillary office, staff welfare facilities, storage and plant areas, (v) Operator Signage, (vi) associated revisions to site layout including revised entrance and exit arrangements, new footpath and boundary treatment to R772 Dublin Road, car and bicycle parking, site lighting and refuse compound, and (vii) all associated site and development works
(1) retention permission for a pedestrian access gateway to the side boundary wall of our property onto the Pines Estate public road and (2) permission for the creation of a new vehicular entrance onto the Pines Estate public road along with all associated site development works
Retention planning permission for 4 no. roof lights to east elevation along with 1 no. roof light to west elevation and all associated works
The proposed development will consist of: I.Installation of new 1,350lt Aboveground Self Bunded AdBlue Tank with Integrated Dispenser, II.All associated site development works
(i) the demolition of existing buildings, roadside fuel forecourt and associated canopy. (ii) The construction of a new forecourt amenity building with net retail area (100sqm max), ancillary restaurant/café area with hot and cold meals and refreshments for sale for consumption on and off the premises, associated customer seating, ancillary off licence (7.8sqm), customer WCs and ancillary office, staff facilities, storage and plant areas. (iii) The construction of a new 2-island fuel forecourt, associated illuminated canopy and underground and over-ground fuel infrastructure. (iv) The construction of a car wash with associated underground water storage tanks, drainage and plant room. (v) Associated revisions to the site layout including revised entrance and exit arrangements, new footpath and boundary treatment to R772 Dublin Road, car and bicycle parking, site lighting and refuse compound and (vi) all associated signage and site development works
Pedestrian access gateway to the side boundary wall of our property onto the Pines Estate public road
Erect a two-storey dwelling and connect to existing mains services along with all associated site development works
(1) Retention permission for increased wall height to front and side boundary walls and (2) permission to erect a first floor extension over the single storey section to the front and side of the existing dwelling with minor alterations and revisions to the elevations and internal layout along with all associated site development works
Extension of appropriate period of PRR 21/87 erect a two-storey dwelling and connect to existing mains services along with all associated site development works
Alterations & additions to an existing single storey detached dwelling. The proposed development comprises the construction of a new single storey extension to the rear with new kitchen/dining, utility and bedroom accommodation together with new windows/alterations to existing window openings to the front, side and rear elevations of the original dwelling, including new velux roof lights to front & rear and all ancillary site works including connections to existing services
A flat roofed ground floor extension of floor area 9.9 sq.m to the side of the existing dwelling and conversion of the existing attic space to a storage space of floor area 34.3 sq.m. replacing the existing side hip with a gable wall and increasing the height of th rear eaves. The ridge level remains unchanged. The proposals effect the front, side and rear elevations and includes all necessary associated siteworks. The development for retention permission consists of extension to original garden shed of floor area 15.4 sq.m
Installation of a wastewater treatment system together with associated ancillary site works, RETENTION of a part first floor attic conversion including 8 no velux rooflight installations on both the north and north west facing roof slopes of the existing dwelling, and 1 no bedroom with dressing room and ensuite
The construction of a new single-storey detached garden shed / store with a floor area of 25.8sqm located to the front (northside) of the existing detached single-storey dwelling and including all associated site works
The decommissioning and demolition of the existing Avoca Wastewater Treatment Plant, and the construction of a new Wastewater Treatment Plant to include: a new foul pump station, inlet works, storm tank, aeration tank, 2 no. final settlement tanks, sludge drying reed beds, 2 no. RAS/WAS Pump Stations, new administration building, final effluent outfall headwall, emergency flow headwall, surface water drainage settlement pond and outfall, and all ancillary works including pipework, pumps, sumps, chambers, air blowers and tanks;new access off the Tower Avenue: and all associated site development, site excavation and landscaping works, including fencing/boundary treatments, above and below ground
A proposed new 39.37 sq.m single storey flat roof extension to the rear and side of the existing Coastguard station. The works also include for the reconstruction of the failing existing stone boundary wall to the left hand side of the station to include a new pedestrian access from the front of the station via a new entrance gate. The extension allows for an Ambulant Disabled WC and shower, a changing room, additional storage and canteen facilities that can double as a meeting room. The proposal includes for the repair and maintenance works to the existing station including repair and repointing of brickwork, the removal of a concrete drip edge detail above the doorway, moving the existing antenna to the rear of the building and all associated site works and ancillaries
Replacement (and repositioning) of 1 No. 6.4m x 3.35m advertising display with 1 No. digital 6.28m x 3.4m advertising display adjacent to the Dublin Road, Arklow (West side of R772 road adjacent to Circle K Service Station and opposite junction with Briggs Lane) and reposition display 3.9m towards the road with an increase in overall height from 4.9m to 5.8m, and all associated site works and services
Subdivision of existing site, erection of a new fully serviced two-storey dwelling house having a ridge height of 9.1 meters, new connection to public mains sewer, and all associated site works
Modifications to the development permitted under P.R.R.: 24/8 to include (1) increase the lower ground floor extension footprint from 28m2 to 35m2 and erect a 28m2 first floor extension over, all to the side of the existing 120m2 dwelling with minor alterations and revisions to the existing and approved elevations and internal layout and (2) erect a 11m2 carport to the side of the approved 43m2 detached single storey gym/games room/store to the garden along with all associated site development works
(1) erect a 28m² single storey extension to the side with minor alterations and revisions to the elevations and internal layout of the existing dwelling and (2) erect a 43m² detached single storey gym/games room/store to the garden along with all associated site development works
A scaffold
To demolish an existing substandard 32m2 rear extension & erect a 64m2 single storey extension to the rear with new dormer structures to provide stairs and a habitable 24m2 attic area along with minor alterations and revisions to the elevations and internal layout of the existing 132m2 dwelling with all associated site development works
Proposed extension to dwelling
Demolition of existing derelict buildings (1292 sqm); construction of 99 residential units comprising 59 no. apartments with four blocks, ranging in height from 4 to 7 storeys (7 no. 1 bed units, 42 no. 2 bed units and 10 no. 3 bed units) and 40 no. 3 storey houses (20 no. 4 bed units); construction of a 350 sqm mixed use building of four storeys containing 350 sqm of retail space at ground floor and residential units above; refurbishment, extension and change of use from a derelict two storey house to a 146.3 sqm creche; refurbishment of the former Ormonde Cinema (Record of Protected Structure Ref. A39) for commercial use comprising 322.5 sqm office at first floor and 32 sqm office, 181 sqm lounge/café and 59 sqm café uses at ground floor; relocation of a Victorian letterbox (Record of Protected Structure Ref. A40) within the scheme; provision of public open space including a new amphitheatre, a new plaza, communal and private open space; provision of internal access roads with vehicular, pedestrian and cyclist access and new vehicular access onto Upper Main Street; 169 no. car parking spaces and 196 no. bicycle parking spaces provided at basement and surface level; realignment of Coomie Lane to create a new pedestrian links between Vale Road, Upper Main Street and the River Avoca walkway; all associated and ancillary site development works above and below ground, including signage, 2 no. ESB substations, alteration to existing landscape features, play area, sculpture, retaining walls, clearance works, landscaping, excavation, bin stores, boundary treatments and services provision
A 38KV grid connection cable and associated infrastructure to connect the approved Johnstown North solar farm (consented under planning ref. 171497) to the existing Arklow 220kV Substation comprising the laying of a 3,190m Underground Cabling (UGC) and associated infrastructure, located at Dublin Road, Arklow, Co. Wicklow
• the omission of the previously permitted 4 storey Block 1, which comprised 19 no. apartment units (3 no. 1 bed and 16 no. 3 bed) • the reconfiguration of Block 2, increasing the number of units from 16 no. (13 no. 2 bed and 3 no. 3 bed) units to 18 no. (1 no. studio, 3 no. 1 bed and 14 no. 2 bed) along with reduction in building height from 7 to 6 storeys and associated elevation changes to balconies and window openings and provision of private open space and communal open space. • the omission of the previously permitted Block 3, which comprised 10 no. apartment units (9 no. 2 bed and 1 no. 3 bed), to be replaced with 3-storey 3 no. 4 bed dwelling units. • the replacement of 20 no. permitted 4 bed housing units along the riverwalk with 3-storey 32 no. duplex units (16 no. 2 bed and 16 no. 3 bed units) and associated services. • the relocation of surface car parking at the site to accommodate the provision of 3-storey 12 no. duplex units (6 no. 2 bed and 6 no. 3 bed units) and associated services. • reconfiguration of the permitted 146.3 sqm childcare facility, including alteration of associated private open space. • an increase from the permitted 810 sqm to 818.9 sqm of communal open space on foot of the amendments to the typology and mix proposed. • an increase from the permitted 4188 sqm to 4354.98 sqm of public open space on foot of the amended site layout. • a reduction from the permitted 169 car parking spaces to 162 car parking spaces and increase from the permitted 177 bicycle spaces to 203 bicycle spaces. • revised internal road layout to facilitate development associated with this amendment. • amendments to the drainage layout to reflect the proposed amendments. • all associated site development works, boundary treatments, landscaping, retaining walls, bin stores, bike parking and site services necessary to facilitate the proposed amendments
Retain attic conversion to habitable rooms including velux roof lights to front and rear of property and associated site works
15m2 replacement extension in lieu of the 15m2 sub-standard extension to the side with a 40m2 single storey extension to the rear along with minor alterations & revisions to the existing renovated 63m2 dwelling and a new on-site effluent disposal system to current EPA standards along with all associated site development works
Retain velux roof windows to attic storage space, front and rear of property and associated site works
Change of use from commercial use to residential use
Demolition of the existing two-storey school building and single-storey extensions (c. 2570 sq.m) and removal of temporary classrooms on site (c. 120 sq.m); construction of a three-storey school building (c. 7535 sq.m) including general and specialist classrooms, a special education needs (SEN) unit, offices, general purpose hall, PE hall, fitness suite, staff room, library, social spaces, sanitary facilities and ancillary spaces with solar photovoltaic panels at roof level; upgrading of the existing vehicular entrance to the sports pitch and the creation of a new vehicular entrance on Coolgreaney Road to provide dedicated vehicular entrance and exit points as part of a new one-way traffic system through the site; removal of the existing main vehicular entrance and provision of a new pedestrian/cyclist entrance on Coolgreaney Road; provision of a car set-down area within the school grounds and construction of a 56m bus set-down area along Coolgreaney Road; provision of a new pedestrian/cyclist access from John Paul Avenue; removal of 32 no. existing car parking spaces and provision of 70 no. car parking spaces including 1 no electric vehicle parking space and 4 no. accessible parking spaces; provision of 100 no. sheltered bicycle parking spaces; provision of external play and amenity areas including a SEN play area and 3 no. multi-use game areas; provision of landscaping, boundary treatment, site lighting, provision of a covered work area, bin stores and storage shelters; provision of associated drainage, attenuation and other site services including an ESB substation and switch room (c. 25 sq.m); and all related site development works.
Demolition of existing storage shed, a new shed to serve as house ancillary storage and hobby shed to store vintage cars and associated site development works
A) erect 6No. dwelling houses, consisting of 6No. 3-bedroom dwellings (house type A1), B) provision of vehicular and pedestrian access, C) provision of off street parking facilities, D) Ancillary site works and connection to existing services
Demolition of existing single storey shed and garage to rear, construction of new part single storey part storey and a half extension containing 2 dormer windows to rear, removal of existing septic tank and new replacement proprietary effluent treatment system and all associated site works
Demolition of an existing single-story extension located at the rear (south-east) elevation and the proposed construction of a part two-story, part single story extension having a roof height 5.43m, internal amendments/renovations together with all associated site works
Retention of dormer bedroom extension floor area 19m2 and retention of garage to rear of dwelling of 19.5m2 floor area
1. Subdivision of existing dwelling No. 4 Glenview into 2No. two-bedroom apartments; 2. Extension to rear of existing dwelling; 3. Demolition of existing sheds to the rear of property; 4. Demolition of front boundary wall and relocation vehicular access location; 5. Site improvement works to provide car parking, new boundary walls to private gardens for No's 1 - 4 Glenview, public open space, connection to all services and all ancillary site works
Extension of appropriate period of 15/1101 (the construction of an 80-bed nursing home (c.4610sqm) together with 34 no. independent (supervised) living units (c.2523sqm), an effluent treatment system, new access road, changes in level and associated landscaping works (c.7133sqm gross floor area). The proposed nursing home is a 2 storey with pitched roof providing bedrooms & communal areas around an internal courtyard. The 34 no. independent (supervised) living units are provided in 4 no. main house types as follows: 12 no. semi-detached 2-bed general needs houses (Type A, 2-storey c.74.7sqm); 4 no. semi-detached 2-bed general needs house (Type B, 2 storey c75.6sqm): 6 no. 2 bed apartments (Type C/C1, 2 storey c.65sqm plus c.92sqm communal/circulation areas). Parking is provided for 67 cars and access from the L2180 Arklow Road is permitted under Reg. Ref. 09/1169 (extended under Reg. Ref. 15/151). The development will also comprise changes in level including cut & fill works, provision of retaining walls, on-site waste water treatment system, hard & soft landscaping works, and all other associated site excavation & site development works above & below ground)
Construction of a 24 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment, fencing and all associated site development works. the development will continue to form part of existing 3G and 4G Broadband network
Existing single storey extension with a floor area of 15.8sqm to the side and rear of the existing two storey dwelling compromising of a bedroom, shower room and a side entrance hall all connecting into the existing services
Construction of a bungalow with garage, a new entrance, a new treatment system and percolation area to current EPA standards and all ancillary site works