(1) Permission for retention of an existing ESB sub-station building (14.4sqm) and existing plant room building (10.3 sqm) and (2) Permission to construct a customer switch room building (10.6 sqm) attached to the western side of the existing ESB sub-station building.Decision record indexed
Permission for a new dwelling house, entrance from existing private laneway, wastewater treatment unit and polishing filter and all associated site works.Decision record indexed
Shoulders Lane (to rear of no 6 Fair Street East) Mallow Co.Cork
Retention permission for the partial demolition of existing derelict shed and Permission for the following: A) demolition of the remains of the existing derelict shed, and all associated site worksDecision record indexed
Shoulders Lane (to rear of No.6 Fair Street East) Mallow Co. Cork
Retention permission for the partial demolition of existing derelict shed and permission for the following: a) demolition of the remains of an existing derelict shed, b) construction of a 2 storey building comprising of 1no. 1 bed apartment at ground floor and 1no. 1 bed apartment at first floor level, each with own private open area terrace/balcony and associated screening, 2 no. roof lights to rear, rear boundary wall and all associated site works.Grounds not yet categorised
Alterations to existing front garden surface. Demolition of half of the front garden wall and gate pier to accommodate car parking area. Dishing footpath and entrance and all associate work.Decision record indexed
The development will consist of the indefinite retention permission of external works regarding the removal of the ATM, night safe and general blue Ulster Bank signage. Planning permission required for the following: 1) Permission to carry out works for the removal of the Ulster Bank projecting sign, raised letter signs (temporarily covered up) and blue shopfront signs. 2) Permission to carry out the removal of the panelling within the ATM window, and replace with glazing and framing to match existing. 3) Permission to carry out internal works for the removal of the ATM, Loose furniture, Ulster Bank signage and merchandise on all floors.Decision record indexed
The construction of a single-storey extension onto rear of dwelling house and the alteration of elevations to rear and south side of dwelling house.Decision record indexed
2nd Floor, Unit 1 Market Square, William O'Brien Street Mallow Co.Cork
Permission on the 2nd floor of existing mixed use building for change of use of office space to residential to include 2 no. apartments and for permission on the 2nd floor for material alteration to existing internal stairway enclosure to accommodate same and all associated site worksDecision record indexed
Permission for retention of the change of use of the existing ground floor access hallway, access stairwell, 3 number first floor apartments and external common areas, 3 number second floor apartments and external common areas and 3 number third floor apartments and common areas (9 number apartments in total) from residential apartments to its current use as emergency accommodation for displaced person or persons seeking international protection along with all associated works.Grounds not yet categorised
To demolish the existing domestic store building and to construct an extension to the rear of the existing dwelling, a new separate dwelling house unit to the side of the existing dwelling house and a new vehicular entrance with alterations to the front, side and rear elevation of the existing dwelling house, with all associated site and ancillary works.Decision record indexed
To alter and extend their existing butcher shop and to convert 1st. and 2nd floors into living accommodation. The development will consist of (1) the change of use of existing ground floor public house/late bar at 67 Thomas Davis Street to a retail butcher, commercial kitchen, delicatessen with associated staff facilities and storage, (2) the merging of ground floors at 66 and 67 Thomas Davis Street, (3) the installation of cold rooms and raw meat preparation areas, (4) alterations to elevations of 66 and 67 Thomas Davis Street to form a new shop front, (5) conversion and change of use of existing 1st and 2nd floor office and toilet spaces into 2no. 2 bedroom apartments with access to Thomas Davis Street, (6) removal of existing public house/late bar smoking room to rear of unit 67 Thomas Davis Street to include space in commercial kitchen and (7) all associated site works.Decision record indexed
Permission for change of use from office space to residential use, to include a total of three apartments, consisting of one 3 bedroom apartment on the ground floor of number 1 Landscape Terrace, one 2 bedroom apartment on the first floor, which spans across numbers 1 & 2 Landscape Terrace and one 2 bedroom apartment on the second floor, which spans across Numbers 1 & 2 Landscape Terrace and to carry out associated alterations to elevations of both buildings, as well as alterations to a section of the ground floor of number 2 Landscape Terrace to allow for revised stairs design.Decision record indexed
The Grass Verge Adjacent To Russell Place Ballydahin Mallow Co.Cork
Permission for the installation of a free standing 1.62m x 0.87m x 0.5m (H x W x D) gas pressure reduction unit, with all ancillary services and associated site worksDecision record indexed
The corner of William O'Brien Street and Muddy Hil Mallow Co. Cork
The development is located within the ACA (ACA-1) area and consists of the retention of works to include: 1) The change of use of the ground floor public bar, lounge and toilets into a retail unit and 2 No. apartments. 2) The change of use of the first-floor kitchen and lounge area into 3 No. apartments. 3) The change of use of second floor toilets and store into 1 No. apartment. The development also consists retention to the alteration to front/west elevation including an additional door serving the retail unit, alteration to decorative timber facade and signage and the replacement of ground floor windows and doors to aluminium.Grounds not yet categorised
Change of use from Bistro (Vacant Unit) and Retail (Vacant Unit), as previously approved under planning reference 55046/04 & 55020/09, to 1no. unit to be used as offices, where services will be provided to visiting members of the general public, being the ground floor of an existing 3-storey over basement mixed use building.Decision record indexed
Permission for retention of alterations to existing dwelling previously permitted under planning reference number 05/2979 consisting of the following: (1) increase in over all height of dwelling, (2) front entrance steps, (3) alterations made to elevations consisting of changes made to window and door opes, and bay window roofs, (4) enlarged balcony area to the rear and for permission to erect a screen to the eastern side of balcony being retained to the rear.Decision record indexed
Retention of alterations to existing dwelling previously permitted under planning reference number 05/2979 consisting of the following: (1) Increased floor area of basement with the addition of 2 No. windows to the front and 1 No. window to the side. (2) Increased floor area of first floor attic space with the addition of 3 No. dormer window to the rear and 2 No. windows to the front and 1 No. window to the side. (3) The addition of a patio door to the side of the ground floor plan with associated balcony and steps and all associated elevational treatment and all associated site works.Decision record indexed
Permission for the re-construction and alterations of an existing mid terraced derelict building; with the works comprising of a ground floor retail unit and 2 no residential units ( 1 no. 1 bedroom apartment to the rear ground floor along with 1 no. 3 bedroom duplex apartment set out over the 1st and 2nd floors), Partial demolition of rear side section to allow for new 1st floor rear balcony and provision of bin store along with associated site worksDecision record indexed
Ballydaheen Road/ Mill Street Ballydahin Mallow Co. Cork
The construction of 52 no. residential units comprising of 12 no. 3 bed units, 18 no. 2 bed units and 22 no. 1 bed units [a mix of 3 bed townhouses, 1 & 2 bed maisonettes and 1, 2 & 3 bed own-door apartments]. The units range in height from 2 to 3 storeys. Permission is also sought for the construction of 3 no. commercial units [Beauty Salon/Coffee Shop/Café and Newsagents] as well as a multi-purpose/ community space at ground floor level. The development also includes landscaping, drainage, boundary treatments, 96 no. bicycle parking spaces, 57 no. car parking spaces, bin storage, play area, planting/screening and all associated site development works at Ballydaheen Road/ Mill Street, Ballydahin, Mallow, Co. Cork. A Natura impact statement will be submitted to the planning authority with this application. The Natura impact statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority.Decision record indexed
Permission for a change of use of existing ground floor retail unit for use as an extension to existing dental surgery practice and all associated site works and services.Decision record indexed
Aldi Discount Foodstore Old Cork Road Ballydahin Ballydaheen Mallow Co Cork
Construction of a single storey deposit return scheme unit c. 35 sq.m, which comprises a publicly accessible entrance area with the remainder of the unit accommodating an internal recycling receptacle, resulting in a reduction of 4 no. car parking spaces [total of 98 car parking spaces at the site] and all associated site development works.Decision record indexed
Unit No. 13 Market Square New Road Mallow, Co. Cork
Change of use of the ground floor unit from the existing commercial/ retail use to office use. The proposed development consists of internal modifications to the ground floor unit and its incorporation into the existing principal office use of the building, signage and all ancillary site development works.Decision record indexed
Unit No. 17, Market Square Mallow Town Mallow Co. Cork
Development comprising of change of use of the ground floor unit of No. 17 Market Square from the existing commercial/retail use to use as active community day service/meeting hub. The proposed development will also consist of internal modifications to the ground floor unit, new signage and all associated site worksDecision record indexed
Permission to construct a single storey extension to rear of existing retail shop to accommodate the relocation of the existing deli counter and food prep area, new cold storage, toilet and staff facilities, minor alterations to existing northern elevations, new signage on northern and eastern elevation and all ancillary site development worksDecision record indexed
Alteration to rear elevation and extensions to same, alterations and extensions to 2 existing apartments at 1st & 2nd floor, No.5 Spa Square. Provision of 4 new apartments, 1 at first floor at No.3 and 1 at first floor and second floors of No. 4 Spa Square, 1 at 3rd floor No. 4 & 5 Spa Square, relocation of extract ducts from commercial units at ground floor along with associated site works.Decision record indexed
Carry Out Off License Old Cork Road Ballydahin, Mallow Co. Cork
Construct an attached single storey storage building to serve existing off license premises. Removal of 4 no. temporary storage containers. The development will also include for access to a deliveries set down area within the site, goods inwards yard and all associated site development works.Decision record indexed
Permission for an 18m monopole structure with headframe carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets and associated site worksDecision record indexed
Permission to construct a single storey extension to the rear of the existing dwelling house including alterations with all associated site and ancillary worksDecision record indexed
Number 7 BallydaheenEast (Ballydahin Td) Mallow Co. Cork, P51XW65
Permission for change of use / conversion of existing two storey dwelling to 2 no. apartments, consisting of a 2 bedroom apartment on the ground floor and a 2 bedroom apartment on the first floor, as well as carrying out associated changes to the building elevations.Decision record indexed
Permission for retention for a two-storey extension to rear of existing dwelling, partial stone finish to front façade and all associated site worksDecision record indexed
Permission for retention of ground floor rear extension to existing two-storey store and office building. Also, permission for change of use of entire building from store and office to retail, including 1no. off-license retail and 1no. general retail on part of ground floor, and 1no. 3-bedroom apartment on part of ground and entire first floor. The proposed development also includes new first floor extension to proposed apartment, and elevational changes on all elevations including new access door to proposed apartment on side elevation and associated site works.Decision record indexed
Permission for retention of the existing Gold Rush gaming arcade previously permitted by Cork County Council planning references 06/55089 [ABP ref: PL 70.222449] and 13/55005Decision record indexed
Ground Floor Unit 1, The Belfry, Bridewell Lane, Mallow, Co. Cork, P51 DN2V
Permission for change of use of the existing ground floor unit 1, from the original permitted retail use to an apartment, including alterations to the front elevation.Decision record indexed
O'Mahony's Centra Spa Glen, Spaglen Td. Mallow Co.Cork
Permission for retention of (1) an existing refuse shed (25.3 sqm), (2) Electric vehicle charge point cabinet, (3) above ground 1600 litre LPG tank with associated works. Permission is also sought for (1) an AD BLUE fuel pump cabinet and ancillary 5000 litre above ground AD BLUE tank, (2) the construction of 2.5m high hit and miss fencing to screen existing 2 no. sheds and refuse shed and (3) the removal of condition no.3 attached to planning ref no. 20/4178, which called for the removal of the two sheds, (29 sqm) containing plant associated with the car wash operations on the expiration of the period of 3 no. years beginning on date of the grant of this permission, to allow for the 2 no. sheds to remain on site.Decision record indexed
Permission to (1) install rooftop photovoltaic solar panel arrays consisting of approximately 364 Sqm of solar panels and associated fall arrest system fixed to the Western and Eastern roof slopes of existing main building and (2) carry out elevational changes to the front (Southern) façade of the existing main building. All of these works are proposed at O'Mahonys CentraDecision record indexed
(1) Retention of 1 no. fuel pump including ancillary signage, (2) retention of 1 no. electric vehicle charge point including ancillary signage and (3) permission to relocate said 1 no. electric vehicle charge point including ancillary signage.Decision record indexed
(1) Extend the existing hard standing area, (2) construct 1 no. rollover car wash and 1 no. jet car wash, (3) install 2 no. sheds (29 Sqm) containing plant associated with the car wash operations, (4) provide 3 no. additional car parking spaces, (5) provide new boundary treatments to northern and eastern site boundaries, (6) install new light pole and (7) carry out all associated site works.Decision record indexed
Saint Mary's Secondary School Fair Street Mallow Co.Cork
Permission for retention of as built prefabricated building consisting of 5 no. classrooms, 2 no offices, toilets and circulation space, footpaths and wheelchair ramps and existing temporary car park for a period of five years (permission previously granted for this development under planning reference number 18/5473)Decision record indexed
The construction of new prefabricated school building incorporating 4 general classrooms, office and toilet facilities, connection of foul and surface water sewer systems, relocation of existing car parking to existing tennis court along with all ancillary site works.Decision record indexed
Scoil Íosagáin Infant School Spa Glen Mallow Co.Cork
Permission for construction of a two storey extension for the delivery of Special Needs Education on grounds of the existing Scoil Iosagain Infant school, construction of a single storey extension for circulation link to connect the new accommodation to the existing school, permission for new external play area, sensory garden and all associated site works.Decision record indexed
Permission to demolish existing 2 storey rear extension to existing dwelling and to construct a new 2 storey extension to the rear of same dwelling and all associated site worksDecision record indexed
St. Mary's Daycare Centre Carhookeal Td Mallow Co. Cork
Alterations and extension to the existing St Mary’s Daycare Centre, Mallow consisting of the following: (1) For internal alterations to the layout and external alterations to the existing elevations, (2) To construct a new single storey extension to the rear of existing building to accommodate a new staff area comprising of 2 no. offices, canteen, and toilet, (3) To construct a new front entrance porch to the side of existing building (4) For new external works consisting of a new sit out garden area with retractable awning overhead, new car parking area, bin storage area, signage and all associated site works and services in accordance with plans and documents submitted.Decision record indexed
No 20 Meadow Grove Summerhill Carhookeal Mallow, Co. Cork
The construction of a single-storey extension to the rear of dwelling house, the alteration of rear elevation and the change of roof covering of the existing dwelling house from tiles to slate.Decision record indexed