To demolish an existing dwelling house and outbuildings and to construct a replacement dwelling, with all associated works
To RETAIN the under-construction extension to the rear of the existing dwelling house and planning PERMISSION to complete the construction of same extension and to upgrade the existing wastewater treatment system along with all associated site works
Of the existing entrance to the east of their property, and for PERMISSION to: Alter/improve the existing entrance, to include a new field entrance adjacent to it and to build up the existing entrance to the west of their property and all associated site and ancillary works
To construct a dwelling house, entrance, driveway, wastewater treatment system and all associated site works
To construct a private garage along with all associated works
To construct a slatted house incorporating a calving area and loose housing along with all associated works
To construct a new dwelling house, outbuildings and garage, new entrance, access road, and install a new wastewater treatment system along with all associated works
To build a new dwelling, garage, bore a well, install a wastewater treatment system & all other associated site and ancillary works
To demolish part of existing dwelling, to extend existing dwelling and connect to proposed foul sewerage plant and percolation area
For development which will consist of a dwelling house, a private garage and a sewage treatment plant c/w ancillary site works
For the conversion of a barn to a granny flat along with all associated works
To construct a Livestock Slatted Unit with associated ancillary siteworks
For development which will consist of a potato grading shed and ancillary site works
For development which will consist of a 10 year planning permission for the construction and operation of battery arrays (240 number units, each 1.87m2 by c. 2.32m tall), a control building with gross floor area 140m2 by 6.40m tall, 3 number 12MVA transformers (c. 3.5m tall), 1 number 2.5MVA transformer (c. 2.5m tall) and inverters (24 number units, each 1.85m2 by c. 2.22m tall. The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The development will have a 35 year operational lifetime. The overall development site is ca. 1.42 hectares (ha)
For development of a dwelling house, proprietary wastewater treatment plant with polishing filters, a private garage entrance and associated ancillary site works.
For development consisting of the construction of a prefabricated unit for 1 No. classroom, to the front of the existing school and all ancillary site works
Consists of the construction of a two storey extension to the front and side of the existing school, to include 1 No. main-stream classroom, 2 No. additional needs classrooms and associated ancillary spaces, 6 No. additional car parking spaces and all ancillary site works
To construct a new dwelling house for partial use as a private residence and partial use as a bed and breakfast, new site entrance, private on-site wastewater treatment system, private garage and all other associated site works and ancillary services
To construct a new dwelling house for partial use as a private residence and partial use as a bed and breakfast, new site entrance, private on-site wastewater treatment system, private garage and all other associated site works and ancillary services
For the upgrade of floodlighting, mounted on 8 No. columns, to LED lighting, and associated works
To construct a new dwelling house, new entrance and access road, private garage and install a new wastewater treatment system along with all associated works
To Retain enabling works carried out to date and Permission to construct a new stand alone classroom and shed along with all necessary associated works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a new dwelling house, access road, entrance, private garage, install a new wastewater treatment system along with all associated works and install a serviced mobile home for the duration of the construction works
To construct a single storey extension to derelict dwelling, to alter existing ground floor plan & elevations, all associated necessary ground works, install new foul sewerage system/percolation area and new site entrance
For the development of a windfarm in the townlands of Cahermurphy, Knocknahila More South, Carrownagry South, Caheraghacullin and Drummin, together with the development of an underground grid connection cable to the National Grid in the townlands of Cahermurphy, Drummin, Doolough, Glenmore, and Booltiagh. The development will consist of 1. Construction of up to 10 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hard strand areas. 2. 1 no. permanent meteorological mast with a maximum height of up to 100 metres. 3. 1 no. 38kV permanent electrical substation which will be constructed at one of two possible locations on site: either Option A in Carrownagry South townland or Option B in Cahermurphy townland. The electrical substation will have 1 no. control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works. 4. All associated under-ground electrical and communications cabling connecting the turbines to the proposed on-site substation. 5. All works associated with the connection of the proposed wind farm to the national electricity grid via an underground cable to the existing Booltiagh 110kV substation. 6. Upgrade of existing tracks, roads and provision of new site access roads and hardstand areas. 7. Junction access road works. 8. 2 no. borrow pits. 9. 1 no. temporary construction compound. 10. Site Drainage. 11. Forestry Felling to facilitate construction and operation of the proposed development; and 12. All associated and ancillary site development works. The application is seeking a ten year planning permission and 30 year operational life from the date of commissioning of the wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed developemnt
Of the following: A: to RETAIN gable, rear and first floor extensions to existing dwelling house and associated elevational changes. B: RETAIN existing upgraded waste water treatment system and for PERMISSION to construct gable ''Granny Flat' accommodation block with link to existing dwelling plus all ancillary site works
To RETAIN minor alterations to the existing dwelling house and planning PERMISSION to install a new wastewater treatment unit & percolation area, and revised site boundaries along with all associated works
For the proposed development comprises the following: a) Demolition of existing rear flat roof section of dwelling. b) Addition of roof lights to existing dwelling c) Construction of a rear single storey extension to existing dwelling house including all ancillary works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
Is sought for the continued operation of the existing Booltiagh Wind Farm as permitted by An Bord Pleanala Ref: 03.120616 (Clare County Council Pl. Ref: 00/567) for a further period of 10 years from the date of the expiry of the current planning permission (30th September 2025) per Condition no. 2 of the consent issued and for the decommissioning of the wind farm at the end of that further period. The proposed development development does not comprise any modifications to the existing operational wind farm. The proposed development comprises: a) 12 no. existing GE Energy 1.5 Megawatt (MW) wind turbines with a maximum overall blade tip height of 90 metres (m) including hardstands; b) Existing site access tracks and car parking spaces; c) all existing associated underground electrical and communications cabling connecting the turbines to onsite substation (onsite substation consented under ABP 03.120616, amended and made permanent under Pl. Ref: 11/34, and amended under ABP 03.245273; d) Existing gated site entrance from Creegh - Kilmaley local road; e) Existing site drainage; f) All existing ancillary infrastructure, associated site fencing and signage; and g) Implementation of a decommissioning plan. All elements of the wind farm are pre-existing and it is not proposed to make any alterations to the current site layout, wind turbines or associated infrastructure as part of this application. an Environmental Impact Assessment Report (EIAR) accompanies the planning application
To (a) RETAIN kitchen extension as constructed, (b) RETAIN sunroom extension as constructed, (c) RETAIN garage as constructed, (d) RETAIN shed as constructed
Of 1. The porch and sunroom extensions onto the existing dwelling, 2. The renovation of the original cottage on site into a self contained one bedroomed unit, for the ancillary enjoyment of the occupants of the main dwelling & all other associated site and ancillary works
To Extend the Appropriate Period of Planning Permission for P15 /229 for development which will consist of A. Construct new two storey extension, including entrance to first floor, lift and stairs, B) RETAIN change of use from restaurant ( Previous Ref 04-1332) to beauticians, c) Change of use of existing first floor storage area to commercial units including relevant external signage, D)Connect to existing waste water treatment system and services and carry out ancillary site works
For the change of use of offices granted under P15-229 to a GP Surgery, and planning permission for an extension to th eexisting retail unit to incorporate a pharmacy unit, relocation of existing toilet block and RETENTION permission for extension granted under P15-229 along with associated works
To Extend the Appropriate Period of Planning P20/120 to 1. Construct a cubicle house for cows with ancillary scrapers. 2. Extend existing shed by one bay. 3. Construct 2 underground slurry tanks. 4. Construct a new milking complex with adjoining drafting system and calf facility. 5. Demolish old store and section of existing parlour to facilitate construction of new milking complex
To 1. Construct a cubicle house for cows with ancillary scrapers. 2. Extend existing shed by one bay. 3. Construct 2 underground slurry tanks. 4. Construct a new milking complex with adjoining drafting system and calf facility. 5. Demolish old store and section of existing parlour to facilitate construction of new milking complex
To demolish the existing rear flat roof extension and construct new pitched roof rear extension, carry out alterations to the existing main roof and carry out elevational changes along with all associated works
For development of a livestock strawbedded loose shed and a hay barn store withassociated ancillary siteworks
To construct a dwelling house and garage, with effluent treatment system, new entrance from the public road, and all associated site works
To erect dwelling house, garage, foul sewer treatment plant, percolation area and new site entrance
To construct dwelling house, garage, treatment system, create new entrance to public road and carry out ancillary site works
To construct a slatted unit with an underground slurry storage tank for housing livestock
To demolish section of existing farmhouse (39.5m2) and construct new extension to side of same and to decommission existing septic tank and upgrade to proprietary wastewater treatment plant with percolation area and associated site works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To construct cubicle shed with slatted tank, loose area with crush and all associated site works. Demolition of part of existing cubicle shed & silage slab also required
For development of a livestock slatted unit with associated ancillary site works
For construction of an easy feed slatted house comprising underground slatted slurry tanks, feed area for cattle, agitation point, calf penning area, central passage, walled in manure pit, and cattle crush on site of old cubicle house to be demolished and all ancillary site works
To construct a dwelling house, garage, wastewater treatment system and soil polishing filter together with all associated site development works
To construct a new dwelling house complete with a new entrance, access road, sewage treatment system and ancillary works