Construct dwelling house and separate garage as shown on plans together with effluent treatment system and soil polishing filter, together with all ancillary site development worksDecision record indexed
Planning Permission to: 1. Retain the existing extension and the current first-floor layout to the dwelling house 2. Install Two new fire-escape windows at first-floor level of dwelling house 3. Retain the existing extension to the domestic garage all as per drawing documents submitted, together with all ancillary site works and servicesDecision record indexed
Retain extension to domestic garage from that granted under planning application P19/238, together with all ancillary site works and servicesDecision record indexed
THE DEVELOPMENT CONSISTS OF THE RETENTION OF SHEDS (32.5m2) AND GARDEN ROOM BUILDINGS (39.7m2) AT THE REAR OF THE EXISTING DWELLING HOUSE.Decision record indexed
THE DEVELOPMENT CONSISTS OF THE RETENTION OF REVISED SITE BOUNDARIES FOR THE EXISTING HOUSE AND BASEMENT AS GRANTED UNDER P04/3227Decision record indexed
Renovation and extension of existing dwelling house to include (1) proposed extension of 89sqm to the northeast elevation, (2) minor alterations to southeast and northwest elevations and all associated site worksDecision record indexed
RETENTION PERMISSION FOR AN EXISTING DOMESTIC GARAGE AND THE CONVERSION OF THE ORIGINAL ATTACHED GARAGE TO LIVING SPACE AND ALSO FOR THE LOCATION OF THE EXISTING ENTRANCE GATE, MINOR REVISIONS TO THE SITE BOUNDARIES, AND THE EXTERNAL FINISHES TO THE EXISTING DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS AND CONNECTION INTO EXISTING SERVICESDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE WITH GARAGE AND AN EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Demolition of part of the existing woodwork/construction studies building and prefabricated classroom building to rear of existing school. Construction of a single-storey standalone extension on lands to the north-east, consisting of 2 mainstream classrooms, 3 SET rooms, 2 construction studies/woodwork rooms, storage areas and toilet facilities along with hard and soft landscaped areas, upgrading of foul connections and surface water system, connections to all services, construction of a temporary traffic meeting point setback on L55513 and a temporary site access road off L55513 on the north eastern boundary of site and all other associated site worksDecision record indexed
Construction of a new detached dwelling house and garage, together with effluent treatment system, percolation area and all associated site worksDecision record indexed
Planning Permission to construct dwelling house, garage and foul effluent treatment system all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Construction of a new residential dwelling house and effluent treatment system together with all ancillary site works and servicesGrounds not yet categorised
CONSTRUCTION OF A NEW RESIDENTIAL DWELLING HOUSE AND EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESGrounds not yet categorised
Demolish existing stone ruin of dwelling house and construct new dwelling house, garage and connect to public sewer all as per drawing documentation submitted together with all ancillary site works and services. The site entrance will be via the existing entrance on siteDecision record indexed
DEMOLISH GARAGE, EXTEND DWELLING AND ALTER ELEVATIONS AND CONSTRUCT ATTACHED GARAGE TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Construct an extension to existing agricultural building which incorporates a feeding area and a slatted tank, all as per drawing documents submitted, together with all ancillary site works and servicesDecision record indexed
RETAIN DWELLING HOUSE AND UPGRADE EXISTING EFFLUENT TREATMENT SYSTEM ALL AS PER DRAWING DOCUMENTATION SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Construct dwelling house, domestic garage, packaged wastewater treatment system, and soil polishing filter together with all ancillary site works and servicesGrounds not yet categorised
CONSTRUCT 2 NO. BUNGALOWS/INDEPENDENT LIVING UNITS AND 2 NO. GARAGES. THE EXISTING ENTRANCE TO EXISTING HOUSE SHALL BE USED FOR THE BENEFIT OF THE DEVELOPMENT TOGETHER WITH CONNECTION TO EXISTING SERVICES AND ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
The development will consist of the partial demolition, extension and attic conversion of an existing single storey bungalow and all associated site works. Amendments will be made to the elevations of the existing building including increased ridge height, reconfiguration of the existing openings and the addition of new openings. The extension of the bungalow will result in an increased ground floor area of 82sqm.Decision record indexed
Construct a dwelling house, garage and septic tank with percolation area all as per drawing documentation submitted together with all ancillary site worksDecision record indexed
Planning Permission to construct a dwelling house, garage and septic tank with percolation area all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Demolition of existing derelict house, the construction of a dwelling house, domestic garage, proprietary treatment unit and percolation area and all ancillary worksDecision record indexed
CONSTRUCT A DWELLING HOUSE, GARAGE AND SEPTIC TANK/FOUL EFFLUENT TREATMENT SYSTEM ALL AS PER DRAWING DOCUMENTATION SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Planning Permission to 1.) construct extension to existing dwelling house, 2.) to demolish rear extension of existing dwelling and domestic shed, 3.) construct a new wastewater treatment system and percolation area, all as per drawing / documents submitted, together with all ancillary site works and servicesDecision record indexed
CONSTRUCT A PRIVATE DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICESDecision record indexed
The habitat restoration works along approx. 800 meters of river will involve the construction of low level deflectors, the creation of pools and the addition of random boulders and spawning gravel. Livestock access to the river will be closed by the erection of fencing, and alternative water supply provided.Decision record indexed
OLD PARK HOUSE, CASTLEMAGARRETPARK OLD CLAREMORRIS, CO. MAYO
To retain as constructed dwelling house which differs to that granted under PD/88/0666 at Old Park House, Castlemagarretpark Old, Claremorris, Co. Mayo, F12CR60.Decision record indexed
Construct a private dwelling house, proprietary effluent treatment unit, percolation area and domestic garage along with all associated servicesDecision record indexed
Construct dwelling house, garage and septic tank/proprietary effluent treatment system together with all ancillary site works and services.Decision record indexed
Planning Permission to upgrade existing effluent treatment system all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Extend and renovate existing dwelling house including an upgrade and relocation of septic tank/proprietary effluent treatment system together with all ancillary site works and servicesDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE WITH DETACHED GARAGE AND PROVISION OF PACKAGED WASTEWATER TREATMENT SYSTEM, POLISHING FILTER AND ALL ANCILLARY SITE WORKSDecision record indexed
DEMOLISH EXISTING DWELLING HOUSE AND CONSTRUCT REPLACEMENT DWELLING HOUSE WITH FOUL EFFLUENT TREATMENT SYSTEM ALL AS PER DRAWING DOCUMENTATION SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Planning Permission to construct a dwelling house, garage and septic tank with percolation area all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Upgrades to the existing Claremorris Wastewater Treatment Plant comprising: Installation of a new inlet works including an inlet flume, duty/assist screens, bypass screen and a grit removal infrastructure; Installation of a new selector tank; Upgrades to the existing aeration system; Installation of a new final settlement tank; Upgrades to the existing RAS/WAS pumping station; Installation of a new picket fence thickener; Installation of a new sludge dewatering unit within the control building; Installation of a new final effluent pumping station; Upgrades to the existing outfall pipeline; New surface water outfall and petrol interceptor; Ancillary mechanical and electrical upgrades; and Associated ancillary site worksDecision record indexed
Construct dwelling house with waste water treatment system and garage on site together with all ancillary site works and servicesDecision record indexed
The development will consist of the renovation and extension of an existing dwelling at Farmhill, Claremorris, Co. Mayo, including demolition of an existing rear extension and detached sheds, internal alterations, the construction of single-storey rear and side extensions, a detached garage, and all associated site development works, and all associated site development works.Decision record indexed
Planning Permission to construct extensions to dwelling house, upgrade foul treatment system and demolish shed all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed