(i) Retention Permission is sought for the single-storey, three-bedroom dwelling known as ‘Yellow House’ (A41 FW20). Condition No. 2 of Reg. Ref. F05A/0221 required that the structure, Yellow House, be demolished following the construction of The Cottage. (ii) Retention permission is also sought for minor alterations to ‘The Cottage’ comprising: (a) the relocation of 2 no. chimneys, provision of solar panels, provision of 2 no. dormer windows, and the omission of 3 no. windows at roof level; (b) omission of the rear entrance door on the northern elevation and 4 no. windows on the southern elevation; (c) addition of 1 no. window on the eastern elevation and the relocation and alterations to the side entrance door on the eastern elevation; (d) provision of associated minor internal reconfigurations; (e) provision of a wastewater treatment system and polishing filter serving The Cottage located in the rear private amenity space. Planning permission is sought for the decommissioning of the septic tank and percolation area serving ‘Yellow House’ and the installation of a wastewater treatment system, polishing filter and soakaway all to serve Yellow House; and all ancillary works, landscaping and drainage necessary to facilitate the development. AI Rcvd 11/12/2024
Permission for a new 145.7sq.m boiler shed ancillary to existing Agri-Food facility and all associated site works. Add Info received 2nd November 2020.
Permission to construct horse training
Permission consequent on a grant of outline permission
Permission Consequent on a Grant of Outline Permission,
Outline permission for (i) construction of 1 no. two storey four bedroom dwelling; (ii) new vehicular access from existing lane of L1155 Balrothery Road; and (iii) all associated ancillary works necessary to facilitate the development including wastewater treatment system and percolation area, SUDS surface water drainage, site works, boundary treatments and landscaping. AI received 01/06/22
Permission Consequent on the grant of Outline Permission (Register Reference No.: F21A/0591) is sought by Shaun Flynn, at Courtlough, Balbriggan, Co. Dublin. The development will consist of: (i) construction of 1 no. two storey four bedroom dwelling; (ii) new vehicular access from existing lane off L1155 Balrothery Road; and, (iii) all associated ancillary works necessary to facilitate the development including wastewater treatment system and percolation area, SUDS surface water drainage, site works, boundary treatments and landscaping.
A horse training facility comprising of a 20 horse stables barn with associated use including waste water treatment system and percolation area, gallops, barn for storage of fodder and machinery, horse walker, lunge ring, dungstead & soiled water tank, proposed entrance onto public road linking internal access laneway and all associated site works. Additional Information Received 25/04/2025 Clarification of Additional Information Received 07/10/2025
Planning permission is requested for extension to front of existing garage and change of use to a Montessori-pre-school use, along with all associated siteworks (proposed operating hours from 09.15am - 12.30 pm). AI received 13/10/2022 AI deemed significant ** Revised public notices received 1/11/2022 CAI received 23/12/22
Retention permission for a single storey conservatory to side of dwelling, 2 no. detached single storey garages to front and waste water treatment system.
Two storey house and waste water treatment system
The construction of 1 no. part single storey, part two storey split level detached 4-bedroom dwelling, including a roof terrace at upper ground floor level, new vehicular entrance and driveway from adjoining public road (R108), associated car parking, on-site wastewater treatment system and soakaway, landscaping, boundary treatment along with all associated ancillary site development and engineering works necessary to facilitate the development.
Planning Permission is sought for the renovation of the existing derelict cottage; works to include a replacement roof, the construction of single-storey extensions to the sides of the existing cottage by utilising the existing attached derelict structures, proposals to include an integral domestic garage, the construction of a new single-storey extension to the rear, an on-site wastewater treatment unit and percolation area and all associated siteworks. Additional Information received 17/12/25
Renovation of existing derelict cottage including forming new window opes, replacement roof, new roof, 4 No. roof windows & the construction of a single storey extension to the rear of existing cottage, detached domestic garage, on-site wastewater treatment unit and percolation area & all associated siteworks.
Construction of a new two storey dwelling, septic tank, and proprietary effluent treatment system, amendments to existing vehicular entrance, and all associated site works. AI received 11/10/2022
The development consists of the retention of a partially constructed domestic garage/ home gym with storage and Full Planning permission to complete the domestic garage/home gym with storage, and all ancillary site development works.
Permission is sought to demolish existing rear extension & replace with new larger extension to the rear, convert existing integrated double garage to habitable space, construct upper storey extension and new entrance porch realign windows and doors. AI received 12/10/21
A storey and a half dwelling, waste water treatment system, private well, vehicular entrance to public and all associated site works.
The development will consist of a storey and a half dwelling, waste water treatment system, private well, vehicular entrance to public and all associated site works.
The construction of 1 no. detached, two-storey, 4-bedroom dwelling, a single storey detached garage. new vehicular entrance and driveway from public road (L5175) and on-site waste water treatment system, landscaping, boundary treatment along with all associated ancillary site development and engineering works necessary to facilitate the development.
The development will consist of two adjoining agricultural sheds, vehicular entrance onto laneway and all associated site works.
Dwyer Nolan Developments ltd. seeks permission to modify a permitted Strategic Housing Development (SHD) (Ref. ABP-313144-22) by way of a planning application for a Large-Scale Residential Development (LRD), within the permitted "Regles" development, currently under construction, located at Minister's Road, Lusk, Co. Dublin. The proposed modifications are comprised of: (i) alterations to the permitted site layout plan, (ii) replacement of 28 no. permitted houses with 34 no. alternative houses. The proposed 34 no. dwellings are comprised of 32 no. 2 & 3 storey, 3 & 4 bed terraced houses, in 6 no. terraced blocks, and 2 no. 2 storey 4 bed detached houses. The proposed development also provides for all associated site development works, open spaces, hard & soft landscaping, boundary treatments, car & bicycle parking etc., on a site area of c.1.16 Ha, within the overall site area of the permitted "Regles" residential development, which is c.8.3Ha. Access to the proposed development will be via the permitted "Regles" development, off Minister's Road. Additional Information Received 22nd August 2025
Construct domestic entrance, domestic garage, split level 2 storey dwelling house incorporating secondary waste water treatment system, percolation area, and all associated site works
The development will consist of the conversion of existing single storey dwelling to storey & a half style with first floor living space. Single storey extension to rear of existing dwelling. Demolition of existing sunroom. Demolition of existing single storey rear extension. Demolition of existing attached garage with replacement detached garage. Upgrade of wastewater treatment system and all associated site works.
Permission for a storey and a half detached dwelling with on-site waste water treatment unit and percolation area and use of approved extended existing farm driveway and vehicle entrance onto public road to site to rear of family home and adjacent to new house under plan ref F16A/0037. Add Info received 1st April 2020.
Planning Permission is sought for demolition of detached dwelling (340m2), demolition of ancillary garages and sheds (342m2), construction of replacement (part single and part two-story) detached dwelling (485m2), change of use of agricultural building to home gym and studio (140m2), replace existing septic tank with new wastewater treatment system, SuDS compliant surface water drainage, and all associated site works.
The development of an Anaerobic Digestion (AD) Facility to produce a renewable biomethane gas for direct injection into the national gas grid on a site of circa 7.28 hectares at the townland of Collinstown, Lusk, Co Dublin. The development comprises of AD tanks and processing equipment, feedstock storage facilities and equipment, silage storage clamps, digestate management and storage facilities. Carbon dioxide from the production of this biomethane will be captured for reuse in the Irish food industry. The proposed supporting infrastructure to be developed includes inter alia, 1 no. 45m diameter combined primary and secondary digestion tank (8.5m high, 7947m³ & 3981m³ respectively) & attached pumping unit, 1 no reception tank (5m high, 250 m³) & attached pumping unit, 1 no. 32m diameter power digest tank & attached gas sphere (12m high, 4.825m³ & 3130 m³ respectively) & attached pumping unit, 1 no. digestate separator building (119.5 m2), 1 no. pasteurization unit & hygenization buffer tank, 1 no. gas upgrading unit, 1 no. gas pre-treatment unit, 1 no. gas valve chamber, 1 no. gas flare (9m high), 1 no. GNI gas injection unit (25.1 m2) with an underground gas pipeline to the gas grid connection adjacent the site to the west, 1 no. combined heat and power unit, 2 no. boiler containers, 1 no. oxygen compound, 1 no. heat distribution container, 1 no. switchboard container, 1 no. carbon dioxide liquefaction unit, 2 no. weighbridges & integrated lever arms & access control & attached bio security units, 1 no. single-storey office and administration building (123 m2), 1 no. ESB sub-station (66 m2), 1 no. enclosed feedstock reception building (1527 m2), 1 no. odour abatement machinery (with 14m high chimney), Silage clamps (8m high), 1 no. machinery shed (309.4 m2), 1 no. services building (288.6 m2), 1 no. solid digestate storage building (484.1 m2), 2 no. covered digestate lagoons, attached pumping building (30 m2) and attached digestate loading-unloading areas, roof mounted solar arrays / photovoltaic panels, all associated car and bicycle parking, internal road layouts, earthen berms, site retaining walls, palisade fencing and boundary treatments, hard surface and bunded areas for housing supporting plant, processing and storage facilities and all associated site works. All accessed by the existing Country Crest internal road network which uses as public roadway access point to the L1155 Man o War Road. The facility requires an Industrial Emissions Licence from the EPA and is accompanied by a Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR).
Permission for demolition of 2 of the existing chimney stacks, internal alterations to the ground floor and associated fenestration and door reconfigurations, the construction of a single storey extension to the side of existing garage building, and the construction of a new rooflight structure, all along with associated landscaping, ancillary and site works.
Planning Permission for a new detached two storey house and single storey garage, new wastewater treatment system and percolation area, soakaway, new vehicular access, and all associated site works. AI Rcvd 17/6/24 SAI received 28/06/24
All in or in the vicinity of the townlands of Mainscourt, Roscall, Richardstown, Gracediew, Brownstown, Magillstown, Skidoo, Dollards, Balheary, Newtown, broadmeadow, Balheary Demesne, Seatown West, Swords Demesne, Mantua, Greenfields, Seatown East and Mountgorry, Co. Dublin. The development of grid connection infrastructure to connect the approved solar photovoltaic ('PV') energy development on lands at Mainscourt, Ballyboghill, Co. Dublin under Register Reference F17A/0340, PL06F.249174 to the ESB Mountgorry 38kV Substation, Swords Business Park, Swords, Co. Dublin, comprising the laying of. 9,470 metres of 38kV underground electricity cables in ducts and associated infrastructure substantially under public roads and beneath the Ward River Bridge, Gracedieu Bridge and the Broadmeadow river by means of horizontal directional drilling. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application.
Development consising of (i) a two storey extension (288m2)
The development will comprise: (i) Construction of a new attic level dormer window to the rear; (ii) new rooflights to front and sides at attic level and all ancillary works necessary to facilitate development.
The decommissioning of an existing wastewater treatment plant (888 sq.m) located at the northern end of the M1 Business Park and replacing it with a proposed foul pumping station (317 sq.m), construction of an access road and footpath, berm embankment and landscaping with all ancillary works necessary to facilitate the site development. The proposed development also includes for the pumping of wastewater for a distance of 2.8 km approx, via a proposed 125mm diameter DN ductile iron rising main with all ancillary works along the R132 as far as the northern end of Balrothery village.
AI received 16th March, 2021 The scheme will provide floodlighting on the two playing pitches and a training area between the two pitches. It will consist of 16 no. 20m high columns supporting a total of 86 led type luminaires.
Amendments to the previously permitted development Reg Ref F18A/0581. The development will consist of a revised two storey clubhouse facility containing dressing rooms with ancillary spaces, relocation and re-orientation of the clubhouse facility. Additional parking with associated landscape and drainage works and the inclusion 0f 8 number football pitch lamp standards. AI received 04/08/21
Planning permission is requested for a) New single-storey extension to rear of existing dwellinghouse b) New wastewater treatment system and percolation area to replace existing septic tank c) New vehicular access to allow off-road car-parking within site curtilage along with associated siteworks.
Planning Permission for 3 no. new Velux roof windows to the front of the existing semi-detached, two storey dwelling for a proposed attic conversion.
The development consist
The development consists of a small scale
Planning Permission for a residential development of 9 number dwellings comprising the following: 2 number Type A two storey 2 bed semi-detached dwellings of 113.1 sqm, 4 number Type B1 two storey 3 bed terraced dwellings of 114.5 sqm, 2 number Type B 2 three storey 4 bed terraced dwellings of 168.2 sqm, 1 number Type C two storey 4 bed detached dwelling of 157.6 sqm on a site of circa 0.41 Ha. including new vehicular entrance off Ballough Road, all associated roads, pavements, boundary treatment, landscaping, drainage, under-grounding of overhead electric power cables and site services on lands at Ballough Road in Ballyboughal, Co. Dublin. An Appropriate Assessment screening report has been carried out and accompanies this application.'
Planning permission for a residential development of 15 number dwellings comprising the following: 6 number Type A two storey 3 bed terraced dwellings of 102.8 sqm, 4 number Type A.2 two storey 3 bed terraced dwellings of 102.8 sqm, 4 number Type B two storey 2 bed terraced dwellings of 85.7 sqm, 1 no. Type B.2 two storey two bed terraced dwellings of 85.7 sqm on a site of circa 0.41 Ha including new vehicular entrances off Ballough Road and boundary treatment of low level wall and railings. including all associated roads, pavements, boundary treatment, landscaping, drainage and services on lands at Ballough Road in Ballyboughal Co. Dublin. An Appropriate Assessment screening report has been carried out and accompanies this application. AI rcvd 07/06/2024 SAI received 21/06/2024
Planning Permission for the construction of a single storey extension to the side of the existing house which will incorporate a Family Flat to be used ancillary to the main dwelling.
The development will consist of: 1. Demolition of existing porch roof; 2. Construction of a single story lean-to roof consisting of a new porch area on the west elevation; 3. Construction of a single story flat roof consisting of a bathroom on the west elevation; 4. Construction of a single story pitched roof consisting of a kitchen/dining, bathroom and utility room on east elevation; 5. General remodel and upgrade of the existing dwelling to suit new proposed layouts. 6. All drainage, structural and associated site works to be implemented.
Retention of single storey shed at side of dwelling.
The development consists of the retention of change of use from Retail use, to use of the unit as a Physiotherapy Clinic and Health and Fitness Studio. AI Rcvd 01/05/24
The development will consist of permission for
The development will consist of the change of use to ground floor unit from retail to veterinary physiotherapy treatment facility with hydrotherapy pool with associated alterations to the internal layout.
Permission sought for 1) Construction of an overground slurry storage tank, (2) Construction of underground effluent storage tank, (3) Completion of all ancillary site works and associated site structures
Planning Permission is requested for 3 no. two-storey detached four-bedroom dwellinghouses along with all associated siteworks and utilising existing entrance onto Quickpenny Road.
The demolition & removal of existing glasshouses and ancillary buildings and equipment and other associated structures on the site and the construction of 41 two storey houses (2 no. 4 beds, 19 no. 3 beds and 20 no. 2 beds). Alterations to ground levels, landscaped open spaces, internal access roads and new vehicular entrance off Hand's Lane. The development includes for all associated gardens, boundary treatments, footpaths, and associated site works including rainwater attenuation systems and foul and storm water connections to existing services on Thomas Ashe Grove/Ministers Road and an ESB sub-station. The application is accompanied by a Natura Impact Statement. AI received 22/03/23 CAI received 15/08/23