CONSTRUCT A DWELLING HOUSE, GARAGE AND SEPTIC TANK/PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES ON THIS SITEDecision record indexed
DEVELOPMENT WILL CONSIST OF A SOLAR PHOTOVOLTAIC (PV) PANEL ARRAY CONSISTING OF UP TO 34,352SQM PV PANELS ON GROUND MOUNTED STEEL FRAMES, 5 NO. ELECTRICITY CONTROL CABINS CONTAINING 5 NO. INVERTER UNITS, CABLE DUCTS, HARDSTANDING AREA, BOUNDARY SECURITY FENCE SITE ENTRANCE, ACCESS TRACK, LANDSCAPING, CCTV, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
WORKS TO REFURBISH THE EXISTING CASTLEBAR-CLOON 110kV OVERHEAD LINE WHICH IS APPROXIMATELY 57KM LONG, AND COMPRISES 252 NO. WOODEN POLESETS AND 40 NO. STEEL ANGLE MASTS BETWEEN THE EXISTING CASTLEBAR 110kV SUBSTATION IN THE TOWNLAND OF AGHALUSKY, AND THE EXISTING CLOON 110kV SUBSTATION IN THE TOWNLAND OF CLOONASCRAGH, CO. GALWAY. APPROXIMATELY 20KM OF THE EXISTING CIRCUIT IS LOCATED WITHIN THE FUNCTIONAL AREA OF GALWAY COUNTY COUNCIL AND APPROXIMATELY 37KM IN THE FUNCTIONAL AREA OF MAYO COUNTY COUNCILDecision record indexed
Planning Permission to retain dwelling house and garage on revised location and permission to complete as previously granted under P23/105 all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Construction of a proposed new detached dwelling house, separate garage, new entrance, new boundary treatments, new waste water treatment system, connection to site services, and all associated site works and landscapingDecision record indexed
Construct dwelling house, domestic garage, packaged wastewater treatment system, and soil polishing filter together with all ancillary site works and servicesGrounds not yet categorised
REFURBISHMENT OF AN EXISTING HOUSE, DEMOLITION OF EXISTING REAR EXTENSIONS AND OLD SHED, CONSTRUCTION OF A PROPOSED NEW EXTENSION TO THE REAR AND SIDE OF THE EXISTING PROPERTY, SEPARATE GARAGE, UPGRADE TO EXISTING ENTRANCE, NEW WASTE WATER TREATMENT SYSTEM, CONNECTIONS TO SITE SERVICES, AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
Single storey dwelling, domestic garage, waste water treatment system and percolation area and associated site development works and servicesDecision record indexed
Construct a private dwelling house, proprietary effluent treatment unit, percolation area and domestic garage along with all associated servicesDecision record indexed
CONSTRUCT DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICES.Decision record indexed
Claremorris Soccer Club, Claremont Claremorris, Co. Mayo
Construction of a side and rear extension to the existing clubhouse building, alterations to the existing building and all ancillary worksDecision record indexed
Construct a dwelling house, garage and septic tank with percolation area all as per drawing documentation submitted together with all ancillary site worksDecision record indexed
The construction of a community centre, incorporating indoor changing rooms, recreation rooms, multi-function playing court, function room and parking facilities,Decision record indexed
Construct a dwelling house, garage and septic tank/proprietary effluent treatment system together with all ancillary site works and servicesDecision record indexed
The development will consist of: The installation of a new wastewater treatment system and 6EH Ecoflow Premier Tech Tertiary filter filter and all site works associated with the development.Decision record indexed
Erecting 8 no. pole top 18 meter high lantern columns with phillips LED 350 Lux floodlights as per specification together with all ancillary site works and servicesDecision record indexed
Construction of a new residential dwelling house, shed and effluent treatment system together with all ancillary site works and servicesDecision record indexed
175kW OF ROOF MOUNTED SOLAR PV PANELS OVER THREE STRUCTURES PLUS 100kW OF GROUND MOUNTED SOLAR PV PANELS AND ALL ASSOCIATED WORKSDecision record indexed
CONSTRUCTION OF A NEW RESIDENTIAL DWELLING HOUSE, SHED AND EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCT DETACHED DWELLING HOUSE, SEPARATE GARAGE, NEW ENTRANCE, NEW WASTE WATER TREATMENT SYSTEM, CONNECTIONS TO SITE SERVICES AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
Planning Permission to construct a dwelling house, garage and septic tank with percolation area all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Construct dwelling house with waste water treatment system and garage on site together with all ancillary site works and servicesDecision record indexed
CONSTRUCT DETACHED DWELLING HOUSE, DETACHED DOMESTIC GARAGE, BOUNDARY TREATMENTS, SITE ACCESS, A SEPTIC TANK AND PERCOLATION AREA AND ALL ASSICIATED SITE WORKS AND LANDSCAPING.Decision record indexed
Demolition of part of the existing woodwork/construction studies building and prefabricated classroom building to rear of existing school. Construction of a single-storey standalone extension on lands to the north-east, consisting of 2 mainstream classrooms, 3 SET rooms, 2 construction studies/woodwork rooms, storage areas and toilet facilities along with hard and soft landscaped areas, upgrading of foul connections and surface water system, connections to all services, construction of a temporary traffic meeting point setback on L55513 and a temporary site access road off L55513 on the north eastern boundary of site and all other associated site worksDecision record indexed
RETENTION PERMISSION OF A SINGLE STOREY BUILDING COMPRISING 121M2 FLOOR AREA FOR MANUFACTURING, OVERHEAD SERVICE LINK TO EXISTING BUILDING, SURROUNDING CONCRETE HARD STANDINGS OF 602M2, EXTERNAL TOILETS, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED SITE WORKS AT REAR OF EXISTING FACTORY; RETENTION PERMISSION OF 2 NO. ROLLER ACCESS DOORS TO REAR OF EXISTING BUILDING; PERMISSION FOR REVISED SITE LAYOUT PROVIDING ADDITIONAL STAFF PARKING, SEPARATED TRUCK ACCESS TO REAR OF MAIN BUILDING, 1.8M HIGH SECURITY FENCE AND GATES TO PROTECT REAR AREA OF MAIN BUILDING; PERMISSION TO INSTALL 30000L OVER GROUND LIQUID STORAGE TANK COMPLETE WITH BUNDED AREA AND HARDSTANDING OF 100M2 FOR TRUCK UNLOADING TO OVER GROUND LIQUID TANK, REVISED STORM DRAINAGE INCLUDING DOWNSTREAM DEFENDER; PERMISSION TO CONSTRUCT NEW DOCK LEVELER TO REAR OF EXISTING BUILDING AND ASSOCIATED RAMPS, PROTECTION WALLS AND ALL ASSOCIATED WORKSDecision record indexed
The development consists of the construction of a new dwellinghouse, garage and septic tank system together with all associated ancillary site works.Decision record indexed
CONSTRUCT A TWO STOREY DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK ADN PERCOLATION AREA AND ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Construction of a single new dwelling house with a domestic garage, installation of new tertiary wastewater treatment system with polishing filter and all ancillary worksDecision record indexed
Planning Permission to retain attic conversion all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
CONSTRUCT MILKING PARLOUR BUILDING WITH COLLECTING/DRAFTING AREAS, SLATTED TANK, MEAL BIN, OFFICE, STORAGE AREA, PLANT ROOMS, DAIRY AND FLOW CHANNEL, CUBICLE HOUSE EXTENSION WITH NEW SLATTED TANK AND FLOW CHANNELS AND ALL ASSOCIATED SITE WORKSDecision record indexed
Demolition of existing derelict house, the construction of a dwelling house, domestic garage, proprietary treatment unit and percolation area and all ancillary worksDecision record indexed
The development will consist of the partial demolition, extension and attic conversion of an existing single storey bungalow and all associated site works. Amendments will be made to the elevations of the existing building including increased ridge height, reconfiguration of the existing openings and the addition of new openings. The extension of the bungalow will result in an increased ground floor area of 82sqm.Decision record indexed
Construction of a new detached dwelling house and garage, together with effluent treatment system, percolation area and all associated site worksDecision record indexed