For the demolition of the existing substandard commercial unit and permission for the construction of a replacement commercial unit to comprise of packing area, storage area, offices, toilets with connection to existing septic tank, permission for the upgrading of existing entrance and car parking area and permission to RETAIN existing signage including ancillary site works
To construct an extension to the existing dwelling house along with ancillary site works
Of a shed to the side of the dwelling house
Of the following: 1 modifications to existing house. 2. construction of external shed to rear of property. 3. position of site entrance and associated works
To A) RETAIN modifications to dwelling house, B) RETAIN site boundaries/site layout as constructed along with all associated site works and services. Original Planning Ref No. P90/309
Of the construction of a two storey extension to rear of existing dwelling to comprise of kitchen/dining/livingroom, playroom, utility, master bedroom with ensuite and walk-in-wardrobe and bathroom including the refurbishment of the existing dwelling and PERMISSION to construct new entrance including ancillary site works
Of garage as constructed and conversion of same to independent living unit to comprise of kitchen/dining/ living, bathroom and 1 bedroom, utility and storage room with connection to existing wastewater treatment system including ancillary site works
To RETAIN the following: (a) to RETAIN separate Garage to rear of Dwelling House; (b) to RETAIN Sunroom to rear of Dwelling Housed) (c) to RETAIN Link between main House and converted Garage; (d) to RETAIN window which has replaced garage door to front
To (A) alter, extend and renovate existing dwelling house. (B) demolish existing rear sunroom annex. (C) RETAIN existing domestic garden shed including all associated site works & services
To demolish rear shed/garage. Construct rear / side extensions. modifications to front façade, new front porch with extensive internal renovations and all associated site works to existing dwelling house
To construct single and two storey side extensions. Modifications to existing front facade and extensive internal renovations. New wastewater treatment system and all associated site works to existing dwelling house
To install an Ancillary Living Unit, connections to services and all ancillary site works
To construct an extension to the side of the existing dwelling house
Of the converted garage for domestic use, the connecting porch area, the altered fenestration, internal layout and all associated and ancillary site works
For the following development: (a) construction of a first floor extension to the rear of the existing dwelling. (b) construction of covered patio area to the rear of the existing dwelling. (c) changes to the internal layout of the dwelling. (d) alterations to the elevations of the existing dwelling and garage. (e) all associated site works and services
For development, the development consists of the construction of a milking parlour, slatted cubicle unit and associated site works
For the construction of a storey & half extension to existing dwelling to include 3 no. bedrooms, 2 bathrooms, utility, study, store & link corridor. Permission is also sought for the demolition of rear extension & side extensions & for permission for alterations and renovation of existing dwelling house & for the installation of treatment plant & percolation area including all ancillary site works
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
For the demolition of existing Hay store and construct replacement Hay store and calf rearing shed. We also intend to apply for permission for the construction of Sand Arena and Stables with associated Tack room, Haylage store and Dungstead including ancillary site works
To demolish existing outhouse, construct an extension to both sides of existing dwelling house to include associated renovation works and site works
To construct a new dwelling house, domestic garage, and a wastewater treatment system with percolation area and soil polishing filter, along with a new vehicular entrance/exit to serve the proposed dwelling. The application will also include modifications to the existing entrance serving the existing cottage, connection to the public water supply, and all associated site development works and services necessary to facilitate the proposed development
To construct a single storey dwelling house, wastewater treatment system /soil polishing filter and all associated site works.
For the construction of a dwellinghouse, new vehicular entrance & proprietary waste water treatment plant including all ancillary site works
On the grant of outline permission (Ref no P23-60235) the development will consist of a dwelling house with proprietary wastewater treatment system and percolation area together with ancillary site works
To (a) Construct and extension to existing warehouse facility which will consist of offices, warehousing / distribution space along with sanitary and welfare facilities, (b) Construct increased parking and turning areas (c) Install new wastewater treatment system and soil polishing filter together with all associated site development works and services
For the development this site at the townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare. Planning Permission is sought for a duration of 10 years, with an operational life of 35 years from the date of commissioning. The proposed development comprises the construction and operation of a solar photovoltaic (PV) farm on a site of approximately 95 hectares. The project includes: (i) Ground-mounted solar arrays supported by steel frames, with an internal network cable facilitating connection to the Drumline 110kV substation. An internal network cable will be installed to enable an under-the-fence connection from the onsite transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18-metre-high lightning monopole mast. (ii) Underground electrical cabling and ducting, security fencing, CCTV stands. (iii) New internal access tracks and site entrance. (iv) Site drainage. (v) All ancillary site development works and apparatus. A Natura Impact Statement will also be submitted to the Planning Authority with this application
For development which will consist of the construction of a slatted cubicle unit, silage slab and associated site works
To construct a house, garage and associated site works
For the construction of detached two storey dwelling house, onsite wastewater treatment system and percolation area, new entrance, connection to necessary services, together with all associated ancillary and incidental site works
The development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application.
To Extend the Appropriate Period of Planning permission for P20/562 the development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
For the construction a dwellinghouse and associated site works including vehicular entrance and waste water treatment system.
For the construction of a dwelling house and garage, proprietary waste water treatment system, new entrance and all ancillary works
The development consists of the construction of a slatted unit and associated site works
To change house type & garage as previously granted under Planning Permission Reference Number P23/60551, together with all associated site works
To construct a new dwelling house, domestic garage, vehicular entrance, wastewater treatment system including all associated site works and services
To construct a dwelling house, domestic garage, vehicular entrance, effluent treatment system including all associated site works and services
For development which will consist of the construction of a single storey dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a dwelling house, domestic garage, vehicular entrance, effluent treatment system including all associated site works and services
To construct ancillary living accommodation (ALA) and associated siteworks & services
To erect a 30 metre high lattice telecommunications support structure, including a headframe together with antennas, dishes and associated telecommunications equipment and works, all enclosed in security fencing and to construct a new access track and revised site entrance. A Natura Impact Statement has been submitted as part of this application
For the construction of a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
For development which will consist of a dwelling house, domestic garage, vehicular entrance, wastewater treatment system including all associated site works and services
For development, the development consists of the construction of a slatted unit and associated site works
Of extension and modifications to existing house and ancillary works
To construct a single dwelling house, advanced water treatment system and ancillary site works.
For development which will consist of the change of use of an existing domestic garage to an ancillary living accommodation unit including modifications to existing elevations and ancillary site works
For development which will consist of a 10-year permission for a Synchronous Condenser and Battery Energy Storage System (BESS) across a site of approximately 2.97 hectares, co-located with an existing solar farm. The development will have an operational capacity of c. 50 MW and will consist of the construction of battery energy storage system units, power conversion units, a synchronous condenser, control modules and rooms, transformers and bunds, cooling equipment, a generator circuit breaker, an emergency diesel generator with associated fuel tank, water tank, underground cabling, fencing with access gates, CCTV and lighting posts, a temporary construction compound, new and upgraded access tracks, and associated landscaping, and ancillary works. The development would be in operation for up to 30 years. A Natura Impact Statement (NIS) has been submitted with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
To construct a 2 storey side and rear extension to the existing property
The development consists of the construction of a slatted unit and associated site works