Of the construction of a detached garage, with all associated site works
For the following development 1) Construction of a new detached dwelling house and 2) Installation of new proprietary Effluent Treatment system
A solar farm on a site of 70 hectares consisting of the following: 309,008 sq. m. of solar photovoltaic panels on ground mounted steel frames; a 38 kV electrical substation with electrical control building and associated compound with palisade fence; the installation of 21 electrical skids within 7 no. electrical compounds (with acoustic barrier fencing); underground power and communication cables and ducts, including underground cabling along the L3056 public road; new and upgraded internal access tracks (including stream crossings as required); 3 no. upgraded site entrances to the public road (one entrance to L-3054 (Lackyle Heights), and 2 no. entrances to L-30541); boundary fencing (including 607m of acoustic barrier fencing on the eastern boundary); landscaping and biodiversity enhancement measures; and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application.
To apply for a 10-year planning permission for development at land to the west/north west of Ardnacrusha within the townlands of Castlebank, Glenlon North, Glenlon South, Drummin and Ballykeelaun, for the development of a solar farm on a site of approximately 70 hectares consisting of the following; up to 309,008 sq.m of solar photovoltaic panels on ground mounted steel frames; a 38 kV electrical substation with electrical control building and associated compound with palisade fence; the installation of up to 21 no. inverter/transformer stations on 7 no. hardstanding locations; underground power and communication cables and ducts, including underground cabling along the L3056 public road; new and upgraded internal access tracks (including stream crossings as required); 3 no. upgraded site entrances to the public road (one entrance to L-3054 (Lackyle Heights), and 2 no. entrances to L-30541); boundary fencing; landscaping and biodiversity enhancement measures; and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
Of as constructed double entrance gates on front boundary and all associated site works
Of a) garage conversion and roof alterations b) sheds and playhouse together with all ancillary site development works and services
To construct a single storey extension to the front and side existing dwelling, including the provision of entrance gates to the existing front boundary wall and associated site works
Of a garage and storage shed, and all associated site works
The construction of an extension to existing dwelling house with alterations to the existing elevations, new attached garage & gym, alterations to existing vehicular splayed entrance and piers, new boundary wall, and all associated site works
To construct dwelling house, garage, waste water tratment system, percolation area, entrance and all associated site works
For detached two storey dwelling, detached domestic garage, onsite wastewater treatment system and percolation area connection to necessary services, new entrance together with all associated ancillary and incidental site works
For alterations to existing dwelling to include an attic conversion with dormer windows, velux rooflights and solar panels, new open entrance porch and stairwell, garage/store, a new boundary wall with splayed vehicular entrance, gates and piers, connection to existing mains water sewer and all associated site works
To construct 60 no. dwelling houses comprising 4 no. detached houses, 20 no. semi-detached houses and 36 no. duplex units and all associated site works and services including a playground and road re-alignment. A Natura Impact Statement (NIS) has been included in the application
To RETAIN dog kennels, cattery, covered run, fencing and associated site works, all as constructed
For the construction of a detached dwelling house, detached shed, new vehicular entrance and piers in existing splayed wall, connection to existing waste water treatment system and all ancillary site works
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
To RETAIN changes to original house plans submitted for grant of planning permission P8/10268, and for detached shed and all associated site development works
To construct dwelling house, garage, entrance and all associated site works
For a two-storey detached house, a detached garage, a new site entrance, a waste water treatment system and all associated works
For the construction of a dwelling house, detached garage, new vehicular splayed entrance and piers, new wastewater treatment and percolation system, and all associated site works
To construct a dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For development which will consist of the construction of a detached domestic single storey garage and home gymnasium for use ancillary to the enjoyment of the existing dwelling house on the site and all associated site works
To RETAIN changes to original house plans submitted for grant of planning permission P8/18299 and planning PERMISSION to raise the front boundary wall and entrance to 2 metres with finish to match existing wall finish and associated site development works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development consisting of the change of roof material on the dwelling house from Thatch to Slate
Of an accessible bedroom, stables, outhouse and associated site works
For the construction of a new fully serviced two storey detached dwelling house, new single storey detached garage, new vehicular entrance landscaping and boundary treatments, new connection to existing Roo West group water scheme and installation of a new wastewater treatment system and percolation area together with all ancillary and associated site works
For the construction of a private dwelling house, detached garage, wastewater treatment system with percolation area, recessed site entrance and all ancillary site works
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
For detached single storey dwelling house and detached domestic garage, onsite wastewater treatment system and percolation area, bored well, connection to necessary services, new entrance detail together with all associated ancillary and incidental site works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
To construct a new entrance, dwelling house, garage/shed, wastewater treatment system and all associated works
For the construction of a detached single storey dwelling, detached domestic garage, new entrance, onsite wastewater treatment system, together with all associated ancillary and incidental site works
For the construction of a dwelling house, garage, wastewater treatment system, new entrance and all associated works
For the construction of a single story extension to the side and rear of an existing dwelling, new wastewater treatment system and polishing filter and all ancillary works
For a 10 year planning permission for a solar array at Ballyglass, Coolderry, Dromintobin North, Reanabrone, and Oakfield (townlands) Ardnacrusha, Co Clare. The development will consist of c265,000 m2 of solar panels on ground mounted frames, 8 no. single storey control cabins with associated electrical transformer units and hardstand areas, 2 no. ring main units, underground cabling within the solar array site and within the L70382 public road to connect solar array field parcels, security fencing, CCTV, access tracks (upgrade of existing and new), upgrades to four existing agricultural field entrances on the R463, l3046 and L70382 and creation of new entrance on L70382, temporary construction compound, landscaping and all associated ancillary apparatus and development works. The solar array will connect to the national grid and will have an operational lifespan of 35 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
For the construction of a single storey detached house, a waste water treatment and disposal system, a bored well, a new site entrance and all associated works
Of the detached garage on site, the altered fenestration to the dwelling house, the existing entrance as built and all associated and ancillary site works
For the construction of a two storey detached house, a single storey detached garage, a new site entrance, connections to existing services and all associated works
Of an existing detached garage and all ancillary site works
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
On the grant of outline permission (Ref. No. P21/899) to build a dwelling house, private garage, vehicular entrance, wastewater treatment system and ancillary site works
For a dwelling house, detached garage, vehicular entrance, wastewater treatment system, connection to services, and ancillary site works
To construct changing rooms, toilet facilities, referee's room, machinery room, connection to public sewer and water mains and all associated site works
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
For the demolition of an existing domestic shed, construction of a new domestic garage and alterations to the front elevation of the existing dwelling
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
To construct street lighting over the entire length of its gravel walkway and all associated site works
For alterations to the existing ground and first floor layouts to incorporate a café on the ground floor, gym and cardio studio on the ground and first floors, new meeting room on the first floor, minor internal alterations, modifications to the existing elevations to incorporate new windows, together with all associated ancillary and incidental works.
To RETAIN the following: a) as constructed dwelling house. b) as constructed detached garage c) as constructed entrance wall d) as constructed garden wall and all associated site works