Installation of an above ground water retention tank (13.1m x 8.1m x 2.85m high); underground water retention tank (8.3m x 3.70m x 5m deep) and balancing system, located at the south-east corner of the site including the diversion of surface water drains to the existing foul sewer system via the proposed tank and all site works associated with the proposed development.
New attic level dormer window to rear elevation; new ground floor living room bay window with pitched roof over to ground floor plus new window to gable at attic level.
Conversion of existing attic with dormer extension to rear, also two new velux roof windows, one on hipped side roof and one to rear roof. New garden walls to front and side of front garden.
Revision of previously approved planning SD09A/0313 including increase the number of children attending the playschool to 16 (maximum) in any one session; change opening hours to 9am - 12pm (morning session) and 12:30pm - 3:30pm (afternoon session), Monday to Friday; minor internal changes to the playschool; all associated site works.
To change condition No. 4 of Planning Application SD20A/0062 to increase the number of children attending any one session from 16 to 20
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Conversation of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs and flat roof dormer to the rear.
Single storey extension to the side with pitched roof over and 2 roof windows. single storey extension to the rear with lean to roof over and 4 roof windows; front porch extension with apex roof; solar panel array to the rear roof profile; relocation of front driver pier; demolition of existing rear extension.
Retention of erection of 457sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Conversion of existing attic space comprising of modifications of existing roof structure, side dormer and with A-style roof c/w window, new access stairs and 2 roof windows to the rear.
Office accommodation extension to the rear of the existing office building (455sq,m at ground floor, 33.2sq.m at first floor); covered bicycle parking area to the front of the existing building 25.2sq.m; all necessary associated ancillary ground and drainage works.
Change of use of 464sq.m of warehouse mezzanine storage, approved under planning reference SD18A/0031, to office use, as well as associated and ancillary internal works, elevational changes and external ground works to facilitate this new use.
The proposed development will consist of: 1. Automatic car wash with water recycling system & payment terminal and 2. Associated revisions to existing knee-high timber fence, landscaped area and all associated site development works including drainage infrastructure, landscaping and line marking.
The development will consist of Converting the attic space to non-habitable home use, to include a dormer in the rear roof, a new gable window and stair access from the existing upper floor landing area
A new unmanned service station development consisting of construction of new petrol filling station forecourt with 4 dispensers, 2 underground fuel storage tanks with canopy structure (covering c. 235sq.m and 6.2m in height) with associated signage; Widen existing site entrance to the north-east of the site and creation of new egress location onto the Fonthill Road along the northern boundary to allow one-way internal road network incorporating new pedestrian crossing over existing footpath at site egress location; Automatic brush car wash and adjoining jet car wash with water recycling system; Single storey services building structure comprising of a car wash plant room and comms room area (gross floor area 16.3sq.m.); 4 electric charging bays, each comprising of a parking space and electric vehicle charging unit and associated signage; 3-room ESB substation to cater for EV charging infrastructure (gross floor area 38.3sq.m.); Air/Water services area with 2 car parking spaces; 2 internally illuminated double-sided totem signs, 1 at site entrance (4m high x 1.91m wide) with advertising area 15.3sq.m and 1 adjacent the new site egress location (5.8m high x 1.91m wide) with advertising area 22.16sq.m; All other associated underground and overground infrastructure, drainage, lighting, CCTV unmanned systems, landscaping and site development works.
Wastewater pumping station comprising of (a) below ground 24-hour emergency storage tank; (b) below ground inlet, wet well, flow meter and valve chambers; (c) control and welfare building with green roof and 2 odour control units; (d) boundary wall, fencing, entrance gate and landscaping; (e) site drainage system including a swale; (f) all associated ancillary and enabling works including hardstanding and access, located within the Clonburris Strategic Development Zone.
Single storey extension and new canopy to front/side of units 1 to 10. The proposal involves works within the curtilage of a protected structure. (Ballyowen Castle RPS Ref. No. 105).
Attic conversion incorporating dormer extension to rear; all associated site works.
Permission for Retention of rear single storey extension consisting of bedroom, kitchen, Dining room accommodation & associated site works at No 6 St Edmunds Park, Ballydowd, Lucan, Co. Dublin, K78 ED89.
Single storey extension to front/side of units 2 to 10 and change of use from Retail/Pharmacy to Doctors/Medical use to proposed extended Unit 10. The proposal involves works within the curtilage of a protected structure. (Ballyowen Castle RPS Ref. No. 105). Previous Granted Planning Ref. No. SD17A/0405
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear. Construction of front porch with A style roof and associated site works.
(i) Change of use from taxi office (permitted under Reg. Ref SD17A/0404) to a food and beverage/cafe use (c. 46.78sq.m); (ii) associated internal and external alterations (to include relocation of entrance door from western to northern elevation and reconfiguration of internal layout); (iii) signage zone (c 2.225sq.m) and (iv) all associated site works
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
(i) Construction of a sheltered canopy (c.55sq.m) in the existing car park for the purpose of providing 2 dedicated 'Click and Collect' spaces for the existing Tesco store and (ii) ancillary signage and all associated site development works.
A new single storey extension to side and rear, together with new first floor extension to side, comprising Ground floor: new window to front playroom, and new kitchen; dining, loung3, island unit additional steel beams to enable remove pillar. First floor: comprising new bedroom4, New end-suite and walk in closet, together with new hipped roof as per existing.
The proposed primary school will extend to c3,355sq.m will be 2 storeys in height and will comprise 16 no. classrooms with an additional 2 classroom Special Educational Needs Unit; a General Purpose Hall and all ancillary teacher and pupil amenities and facilities. The proposed development also provides for hard and soft play areas, including 2 no. outdoor ball courts, bicycle parking, staff car parking, vehicle drop off and set down areas. Photovoltaic Panels (PV) are proposed on roofs in addition to EV Charging Points and a packaged Biomass heating plant. The proposed development also provides for all landscaping and boundary treatments and all associated site development works. Access to the site will be via a new junction and access road off Thomas Omer Way. The new access road will run south off Thomas Omer Way and then west into the site. The proposed access road Is in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme and incorporates public lighting, footpaths and cycle tracks. A further pedestrian / cycle only connection to Thomas Omer Way ls also proposed along the western green corridor, west of the proposed school building.
New signage (2.225sq.m) to the side elevation (north east facing), all associated site and ancillary works in accordance with the plans as submitted.
Two-storey extension to side, consisting of a sitting room and a utility room at ground floor and a bedroom and a study room at first floor.
(1) To remove Hippedroof over existing sigle storey extension (2) Move out the wall to the side of the extension by one meter (3) Increase the size of the existing utility room and bedroom with en-suite on the ground floor (4) Erect first floor extension and extend main hipped roof at the side of the house brdering Liffey Cresent
Proposed 38m2 flat roof ancillary garden studio located to infill irregular space at rear (western side) of existing garden along with associated siteworks
Amendments to previous grant of permission SD14A/0157. Change of use of part first floor plan to create 2 addtional bedrooms, alterations and refurbishment of existing nursing home and all associated site works.
Development will consist of a proposed new Dutch hip gable wall to the side of the existing house. A new flat roof dormer to the rear of the existing house roof converting the attic space into new bedroom. 1no new Velux to the front of the existing house roof & 2 No to the rear of the existing house roof. A new window at attic level in new side gable wall and all ancillary works
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Detached gym and utility room in rear garden with connection to existing services and all associated site works.
Construction of a fully serviced single storey, dormer-style detached house in the existing front garden; new boundary walls and separate vehicle entrance.; connection to County Council foul and surface water and all ancillary site works.
The development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme. Permission is also sought for the relocation of bicycle parking areas within the site; revisions to the permitted boundary treatment along a section of the eastern site boundary; the installation of 3 no. flagpoles in the south-eastern part of the site; and revisions to the site compound including repositioning of bin store area and replacement of previously permitted bio-mass heating with new heat pump and gas storage tank.
The proposed development will consist of the amalgamation of existing Unit 54 (c. 174 sq.m) and existing Unit 55 (c. 201 sq.m), both retail use, into a single retail unit of c. 381 sq.m through the removal of the existing partition wall between the two units. New internal centre façade for the amalgamated unit to include for 2 no. banner signs of 6.4m x 1.25m.
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window and 'Dutch' hip; new access stairs and 2 roof windows to the rear.
Attic conversion for storage, including two rooflights to the front roof slope, a dormer and one rooflight to the rear, and two new gable windows to the side.
The proposed development will consist of the replacement of 3no. existing illuminated signs with similar and the erection of 1no. new illuminated sign and all other associated site development works. Sign 1 (7.7m x 0.7m) is a high-level sign to replace the existing sign on the eastern elevation of the eastern block. Sign 2 is a new high-level (7.7m X 0.7m) on the western elevation of the eastern block. Sign 3 (5m x 0.9m) is low level wall mounted signage at the site entrance replacing existing sign. Sign No. 4 (8.5m x 0.8m) is a replacement for the existing high level sign over the main entrance to the hotel building.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Proposed loft conversion including dormer structure with window to rear roof profile and velux roof windows to front roof profile.
Construction of flat roof first floor extension over existing ground floor extension to the rear of existing dwelling comprising of bedroom, new gable window and revised internal layout.
Construction of flat roof first floor extension over existing ground floor extension to the rear of existing dwelling extending the existing rear bedrooms. Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 3 no. roof windows to the front and flat roof dormer to the rear.
The construction of a partially two storey over basement motor sales and service building, max. height of c. 11.6 metres with a total gross above ground level floor area of c. 2,198sq m. The development will include on-grade car and bicycle parking spaces, with vehicle display spaces on-grade and at basement level. The proposal also includes the reuse of the existing vehicular access to the north of the site, ramped access to basement level, all associated site enabling and excavation works, boundary treatments, hard and soft landscaping, together with building mounted signage, site signage and flagpoles.
The development will consist of conversion of existing attic with dormer extension to the rear, also one new Velux roof window to the rear.
Demolition of existing 7.15 sq/m ground floor rear extension, change of use of 10.8 sq/m garage to habitable space; construction of an 18 sq/m first floor side extension; construction of a 33.2 sq/m ground floor rear extension; construction of a 2.3 sq/m porch to the front of existing dwelling and conversion of attic space to storage room.
Retention to change from part use of the house to the entire use of the house for a child care centre.
Extension to the existing motor sales outlet with servicing area and associated development consisting of the construction of a single storey (double height) extension (c.568sq.m) to the existing motor sales outlet with servicing area which will comprise of a car body shop and valet area; single storey remote sales office (c.20sq.m); a covered bike shelter; ancillary petrol fill area; alterations to vehicle storage area; alterations and relocation of the exiting vehicle display provision (resulting in total of 79 defined display spaces (59 additional) together with indicative display areas with capacity for c.72 vehicles); a reduction in service spaces (resulting in total of 23 service spaces (3 less)) and relocation and additions to the existing staff car parking provision (resulting in total of 25 staff spaces (5 additional)); provision of a new pedestrian site entrance; signage (3 signs (4.45sq.m; 2.71sq.m; 0.58sq.m); alterations and additions to the soft and hard landscaping, including the removal of existing fence; new boundary treatment and internal vehicle access gate; pedestrian paths and access; paving; tarmac and planting; relocation of vehicle sliding gate; an additional vehicle display podium; additional electric charging bays; new lighting; elevational changes to the existing building to facilitate the extension; an additional attenuation tank; all piped infrastructure and ducting; plant; all associated site development and excavation works above and below ground.
Installation of a 1.4m x 0.51m x 1.8m (LxWxH) above ground enclosure, to house a new natural gas DRI (District Regulating Installation) and a 3m high 'lamp post' style relief vent stack with all ancillary services and associated site works.