Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.
Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
For the conversion of existing garage structure, new single storey front extension with porch, new single storey rear extension, new first floor extension over garage, new dormer attic structure, internal ground and first floor modifications and all associated works. Works also include gate to existing vehicular access and new vehicular access and associated dishing of kerbing
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways and temporary construction compound / set-down area provided by Roadstone Limited
Construct a single storey flat roofed kitchen extension to the rear of my property and a single storey pitched roofed side extension (granny flat side) and associated site works.
Change of use from 2 existing office units to 2 two bedroom student accommodation units located at first floor level including minor internal modification works and retaining the existing entrances off the main courtyard.
Change of use from existing cafe bar to 15 studios for short-term accommodation / student accommodation / emergency accommodation units on the ground floor to include internal modifications and external modifications with associated private open space and communal facilities; All with associated signage, drainage and site works.
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.
Construct a two bedroom single storey detached dwelling house, area 68.3sq.m with a new vehicular entrance area and associated site works.
1. Remove existing flat roof and tiled roof canopy to ground floor Accommodation and construct new first floor extension with pitched roof over to side of existing dwelling 2. Remove existing porch structure and tiled roof and construct new porch to replace existing. 3. All above with associated site works.
Extension to side and rear and internal alterations and upgrade of existing group residence with related care facilities for accessible bedrooms and bathrooms and all associated site works
Demolition of single storey side shed and construction of a single storey side and rear extension, dormer attic, stand-alone games room and pedestrian access gate to the rear associated site development works.
First floor extension at front and side of dwelling over an existing single storey kitchen and study at side; new velux window in existing rear roof plane; all associated site works.
Permission sought for the retention of existing store and glasshouse at rear
2 storey extension to side of dwelling and 2 storey extension to rear of dwelling. Single storey garage in rear garden. Internal alterations to be carried out.
Retention planning permission for alterations to previously approved plan reg SD22B/0482. Alterations to rear hipped roof structure to new extension reverting to a flat roof structure to accommodate a new dormer roof extension to attic level to provide for non-habitable accommodation and a new window to side gable wall to attic
Retention permission for a single-storey, flat roof structure in the private rear garden for use as a small dog grooming business, and all associated works necessary to facilitate the development.
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
Application for planning permission for a development at this site at Inis Thira, Oldman, Tallaght, Co. Dublin. The application is for a new 4-bedroom two-storey detached dwelling on an existing vacant site, along with all associated site development, facilitating works.
Single storey extension of 57sqm to side and rear of existing dwelling with flat roof.
A single storey ground floor Granny Flat Extension to the rear of existing dwelling with associated site works. Consisting of 1 bedroom, toilet and open plan kitchen, dining pace and living room with a total combined area of approximately 52msq
Change of use from existing office accommodation (53.67sq.m) to new Sushi Take-Away shop consisting of new service counter with hatch to customer area at front, new internal kitchen, cold store, dry goods store & staff w.c., together with new shopfront signage to front elevation and all associated site works.
Retention of a single-storey flat roof garden room to the rear of the dwelling, with ancillary use and existing connections to water & electricity, all for purposes incidental to the enjoyment of the main dwelling.
Detached steel storage shed located to the rear with access from rear private lane.
Retention of Large detached shed with pitched roof over having vehicular access onto a private laneway to the rear, screened behind a steel framed, timber clad gates attached to rendered block pillars.
Ground Floor Side Extension With Pitched Roof Over
Attic conversion with dormer roof window on rear slope of roof and window in gable wall at attic level.
Single storey extension comprising of a link corridor, storeroom and two GP consultation rooms to an existing GP surgery, alterations to the existing surgery front elevation, including new entrance door to existing porch, replacing current entrance door with a window. Works include internal layout changes to existing waiting area with proposed new reception and disabled access toilet.
Retention to retain single storey independent unit in rear garden, and all associated site works.
Change of use of 2 existing ground floor retail units to a Day Service Centre; new internal partitions to accommodate meeting rooms; open plan learning spaces and toilet and staff facilities; external works comprise replacement of the existing shopfront at ground floor level incorporating new windows, doors, fascia and signage.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Planning permission sought for a new two storey end of terraced dwelling to the side of the existing two storey dwelling with concrete roof tiled & external finishes to match existing; new driveway with new vehicular access with dished footpath & associate site works.
Internal alterations to the existing office at first floor level and a change of use of the 2 existing ground floor retail units at the rear of the property into a single licensed restaurant premises; comprising of external alterations to the rear elevation including new restaurant and office signage and shop frontage, replacement of all opes, 3 restaurant entrances - 1 at Old Bawn Road and 2 at Courthouse Square; 1 office entry (existing) at Courthouse Square; use of external paved area onto Courthouse Square as restaurant seating, bicycle parking facilities; internal alterations include the removal of existing stairways; removal of existing retail unit dividing wall; removal of existing internal partitions to first floor provision of restaurant customer and staff sanitary facilities and services at first floor level; provision of office sanitary facilities and services at first floor level; following a recently approved planning application for alterations to the Old Bawn Road elevation including a new shopfront and provision of a single office premises at ground floor level, Reg. Ref. SD19A/0013.
Permission for an original historic mural on the gable wall of John O'Leary's Solicitors
An original historic mural on gable wall facing the Old Bawn Road. The mural has been funded by SDCC Arts Department in their 2022 Scheme.
The demolition of existing Side extension and the construction of a new two storey, Pitched-roof side extension with a new pitched roof porch. The construction of a new rear dormer and the construction of a 40m2 Rear Extension. Minor internal alterations to the existing dwelling.
First floor extension over the existing ground floor extension to the side with proposed use of the entire two storey extension to the side to be a family flat ancillary to the main dwelling with two roof lights in rear roof plane.
Demolition of the existing single-storey c. 2,605sq.m. Junior School building; demolition of the existing single-storey c. 211sq.m. Junior School ancillary structures; construction of a new part three/part two-storey c. 4,998sq.m - Junior School building, located to the west of the existing Senior School building. The new school will accommodate 27 classrooms, a 3-class base Special Education Needs facility and all ancillary accommodation (the Senior School does not form part of planning application); 2 single-storey temporary accommodation units, c. 400sq.m, located to the south of the site, to facilitate the construction of the new school building; renewable energy design measures, PV Panels and/or heat pumps located at roof level; new school signage comprising wall-mounted lettering on the front elevation of the new building; external hard play area and 2 Multi-Use Games Areas; all located to the south of the site; redevelopment of the existing staff car parking and set-down facilities within the school site comprising: provision of 40 Junior school staff car parking spaces and 6 car set-down spaces, resurfacing of 22 existing Senior school car parking spaces, 106 bicycle parking spaces, new access road, new footpaths, landscaping and all ancillary site works; boundary treatment comprising of repair works to the existing low-level blockwork wall and new metal railings to an overall height of 2.4m along Fortunestown Road; replacement of the existing palisade fencing with new 2.4m high railings along Kiltalown Park Rd to the south; replacement of the existing pedestrian and vehicular entrance gates; works in the public road outside the school site: including 5 set-down spaces along Fortunestown Road, and services connection required to facilitate the development.
Refurbishment and extension of the existing 3 storey building and a Change of Use of the existing building and site from a vacant addiction service facility to a National Ambulance facility. Demolition of a staircase and boiler room (40sq.m) and the removal of an external stair-core, entrance ramp and steps to the north of the building; and the provision of lateral and vertical extensions at ground, first and second floor levels principally comprising a single storey, two-bay ambulance garage, increasing the gross floor area of the building from 943sq.m to 1,420sq.m; the rationalisation of floor space in the existing building; the provision of an external canopy to shelter 14 No. emergency vehicles; the provision of a power washing station towards the south-western corner of the site; ancillary staff car-parking; cycle parking; revised elevational treatments; boundary treatments; hard and soft landscaping; and all associated works above and below ground.
For construction of new front porch, new first floor side extension, new dormer attic structure, demolition of existing chimney and all associated works. First floor works new bedroom and stairs and dormer attic works consist of bedroom with ensuite.
The works consist of the construction of an adjoining single-storey special education needs (SEN) unit (540sqm.) to the west of the existing school building and will include two SEN classrooms with safe base and storage facilities, a central activities space, office, multi-sensory room, cleaner's stores, storage rooms, toilets, shower areas, and associated ancillary spaces plus an additional 6no. car parking spaces to the north of the proposed extension. Other works include the relocation of the existing attenuation tank; the relocation of the junior play area and orchard, and the inclusion of a new sensory garden (100sqm.) and a secure soft play area (100sqm.) to the west, with all associated site works.
Retention for the existing single storey pre-school and afterschool childcare buildings with associated site works.
The development will consist of a single storey front and side extension plus internal alterations and all associated site works.
Installation of new railing to front of building including pedestrian gate; installation of new access control system to car park; 2 new standalone illuminated identity signs; revisions to landscaping and associated site development and facilitating works.
New pitched roof over the converted garage and rear utility room and canopy over the front porch.