Construction of a 26.6 sq/m ground floor extension to the rear of existing dwelling.
Single storey extension to front, side & rear, consisting of demolition and replacement of garage with bed-living room, shower and utility, and enlargement of front porch, totalling 33sq.m.
Retention permission and continuation of use of a former double height warehouse within their building as 426.6sq.m of office use, over two floors as well as all associated and ancillary elevation changes.
Partial Demolition of Garage Area. Conversion of remaining portion with new ground floor extension to front, 2no of dormer type windows to front elevation, 1 no of dormer type window to rear elevation with internal modifications and associated site works
Erect 415sq.m. of photovoltaic panels on the roof of existing unit with all associated site works.
Gabor Construction Limited are applying for Permission for partial change of use as constructed under Reg. Ref. S99A/0146, from Warehouse to Office use (29sqm) to include for internal alterations and extension of current office floor areas on ground and first floor level.
Change of use of portion of the ground floor (29.48 sq m) from office to residential accommodation and retention permission for the incorporation of the internal courtyard (7.16 Sq m) as part of the residential accommodation.
The development will consist of 1) a side garage conversion and second storey side extension, 2) a single storey lean to extension to the rear, 3) the widening of the vehicular front entrance, 4) a front porch extension 5) a roof light on the south facing hipped roof and 6) all site ancillary works.
Change of use of existing detached warehouse unit to vehicle service workshop including new internal works to from new staff canteen and toilet accommodation; new fire door exit doors; roller shutter door to existing elevations and attached illuminated building signage.
Change of use and amalgamation of Unit 24A with Dunnes Stores Cafe (units 25/26) to increase the cafe's size from 257sqm to 368sqm, including an extended mall seating area and all other associated site works/services
Change of use of the first floor from offices in No. 43 and restaurant in No. 44 to 3 two bedroom apartments and 1 one bedroom apartment and an interconnecting doorway between the two existing ground floor shop at No. 43 and the takeaway food shop at No. 44 Tower Road; new stone-clad shopfront with an aluminium glazing system and signage in the fascia over each unit.
Clonmill Limited are applying for Permission, for the proposed amalgamation of shop units 19 and 20, at The Mill Shopping Centre Clondalkin, Ninth Lock Road, Clondalkin, Dublin 22. The proposed development will consist of the amalgamation of the existing retail Unit 19 (c. 78 sq.m) and existing retail Unit 20 (c. 74 sq.m) into a single retail unit 19/20 c. 155 sq.m through the removal of the existing wall between the two units. The existing entrance to Unit 20 is to be closed with a partition wall and the shop front glazing to be removed and replaced with a glazing unit to match height to Unit 19. Including all associated site services and development works.
New porch extension to front, demolition of existing sunroom/conservatory and erection of a new ground floor extension to rear, with internal modifications and all associated site works
Install a second cremator within the existing crematorium building to be powered with electricity; the new unit will be located beside the existing unit within the building (the building was originally designed and built for 2 units); internal alterations to the building including removal of non-load bearing block walls to facilitate the new unit; extension to the west side of the building to provide staff changing facilities and a cremulator room (20.2sq.m); extract system to be connected to the existing flue; partial demolition of existing boundary wall to facilitate a new sub-station/switch room, the laying of underground ducts for ESB connection, underground cabling and all ancillary works to facilitate the development.
The development will consist of the sub-division of the existing dwelling and site to create 2 No. of 3 Bedroom semi-detached dwellings, with internal modifications, new gable-end type pitched roof, new ground floor extension to front, new vehicular access and associated site works.
Change of use from residential dwelling, to use as an early childhood education Creche / Childcare facility for 58 No. of childcare places, operating between the hours of 7.30am - 6pm, Monday to Friday working in conjunction with existing facility to rear of the property.
Retention permission and permission for development at the existing shotblasting facility. The total planning application site area extends to approximately 0.92 Ha. Retention permission is sought for: a 2 bay portal frame structure at the northern end of the facility and a 153 sq.m floor area extension at the southern end of the facility. Permission is sought for: a 716 sq.m floor area extension at the southern end of the facility; roof to enclose the 2 bay portal frame structure (for which retention permission is sought) minor changes to the internal layout including relocation of toilet and provision of ancillary office space; concrete resurfacing of the main yard area; minor elevational changes; and all associated site and development works above and below ground.
For replacement of existing playing pitch with construction of an all-weather pitch with 1800mm high perimeter fence and walking path with 3 No. 12m high floodlighting columns with 3No.floodlights on each, associated additional 6 No. carparking spaces and ancillary site works.
Demolish existing single storey extensions to side and rear and to construct new single storey extension to rear, new two storey extension to side, with new dutch hip roof replacing existing hipped roof, attic conversion with dormer windows to rear and rooflights to front. New bay window to ground floor front elevation, new detached single storey workshop at rear of garden with new vehicular access off Newlands Road.
(i) Demolition of existing ancillary outbuildings and removal of front boundary treatment to Turnpike Road; (ii) alterations to existing single-storey cottage including demolition of existing front porch, partial demolition to the side/south of the original building, partial demolition of non-original rear extension and replacement of rear pitched roof with a flat roof; (iii) change of use of the cottage from residential to commercial use providing a reception area, coffee shop, multi-purpose studio, changing rooms and associated facilities; (iv) construction of 3 no. enclosed padel courts within 2 no. single-storey structures to the rear of existing cottage; (v) provision of 17 no. car parking spaces (including 1 no. accessible space), 15 no. bicycle parking spaces and refuse/storage facilities; (vi) provision of a new 6.0m wide vehicular entrance via Turnpike Road; and, (vii) all associated works, including new boundary treatments, landscaping, SuDS and drainage necessary to facilitate the development.'
Retention for 2 bay portal frame, additional floor area to existing industrial unit. Permission for roofing of 2 bay portal frame structure; extension to existing industrial unit; construction of a concrete resurfaced area in main yard; minor internal layout and elevational revisions to existing industrial unit and all associated site works including underground surface water attenuation and related utilities and works.
The development will consist of the construction of an extension of c.650 sq.m to an existing industrial unit and all associated site development works. The proposed extension shall be used for storage of dry mixed recyclable waste prior to shipping.
Ecomondis Ireland Unlimited Company intend to apply for permission for retention of development and permission for development at Greyhound Recycling, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22 The development to be retained consists of the constructed logistics office (c.74.5 sq.m), weighbridge office (c.40 sq.m), logistics ablution (c.28.5 sq.m), logistics canteen (c.23.75 sq.m), site canteen! laundry (c.42 sq.m), site ablution (c.40 sq.m), air handling plant featuring carbon stack of height c.16.6 metres (c. 335 sq.m), annexe building featuring chimney of height c.14 metres (c. 153 sq.m), rainwater tank (c. 7.0 sq.m) and generator room (c. 25.3 sq.m). Elements of the buildings for retention are associated with permitted development on site (SD03A/0838 and SD06A/0404) that require a waste license from the regulatory authority. The development proposed consists of the construction of 1 no. new service garage building c. 11.60 metres in height with a gross floor area of c. 636 sq.m and all associated site development works above and below ground necessary to facilitate the proposed development on this site of c.4.476 ha.
Demolition of an existing single storey office building (total area of 647.62m2, 4.38m high) ancillary to the existing crane hire business with this area returning to yard area.
Change of use of the first floor office accommodation to a one bed apartment; change of use of the attic floor office accommodation to a studio apartment; new dormer window within the rear roof slope; ground floor which is currently vacant remains as office accommodation; all necessary ancillary site development works.
Retention of replacement single storey pitched roof office building (183.7sq.m) and associated site works; the original flat roofed office building comprised 132sq.m; totem sign 1.37m wide x 5m high.
A) 2-Storey extension to side and front, with a wall proposed on boundary with Property No. 8 St Brigid's Road b) Single storey extensions to front and rear c) Refurbishment including change of fenestration and removal of chimney to rear d) Enlargement of existing vehicular access e) All related works.
Garage conversion, single storey extensions to front and rear, first floor extension to side with new Dutch hip roof, attic conversion with dormer windows to rear and rooflights to front and widening of existing vehicular access.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear
Demolish part of the modern extension constructed at the southern end of the original school building in order to construct a new single storey extension to accommodate a unit for children with special needs; ancillary works will include modifications to the original classroom block and the provision of new car parking spaces in the western forecourt area.
Construction of a 2 storey extension to side of existing dwelling with internal modifications and associated site works
The development will consist of the change of use of the ground floor unit including mezzanine level from showroom with ancillary office use to office use (c 1,022 sq.m), together with all ancillary site services and site development works.
Demolition of the existing flat roof side extension and rear kitchen extension; Construction of a single storey side and rear extension with flat roof including 3 roof lights and internal alterations including designated car park spaces and cycle spaces; no alterations/works are being proposed to existing bin storage all with associated site demolition and development works, cycle parking, car parking.
Change of use from haulage yard to filling station open to the public; additional diesel pumps; palisade fencing; illuminated and non-illuminated signage; all associated site and development works.
Parking area to the front with dropped kerb for access; new folding wrought iron gates in keeping with the existing.
New double side extension, single storey rear extension and dormer attic structure and associated works; Demolition of existing side extensions and rear extension; new kitchen/day room, utility, WC & playroom at ground level, bedroom with en-suite at first floor and bedroom with en-suite at attic level; widening existing front entrance.
The replacement of the existing blacklit '96 sheet' advertising panel (12m x 3m) with a 6m x 3m digital advertising panel mounted on a 'green wall' structure (mesh panel with climbing plants), along with all associated site works and services.
Retention of existing first floor extension over garage. Permission for new alterations/extensions to the existing two storey semi-detached house comprising: demolition of the existing single storey rear sunroom and living room extension and construction of a new single storey flat roof extension to the rear with 3 new rooflights; reinstating the garage to it's original use and construction of new flat roof canopy to the front porch with associated modifications to the existing fenestration and site development.
Social housing development consisting of 10 one bed units in a two to three storey apartment building, associated car parking and bicycle parking, bin store, water pump house, new vehicular access onto Old Nangor Road, new pedestrian access onto Old Nangor Road, landscaping, boundary treatments, public lighting and all associated site and engineering works necessary.
A social housing development comprising of 10 one bed units in a three storey apartment building, associated car parking and bicycle parking, bin store, new vehicular access onto Old Nangor Road, new pedestrian access to replace existing vehicular entrance, landscaping, boundary treatments and all associated site and engineering works necessary to facilitate the development.
We, Alucraft Ltd, make application to South Dublin County Council for permission. FOR RETENTION of development at this site address: Unit AF4O, Cloverhill Industrial Estate, Clondalkin, Dublin, D22 HY51, for alterations to permitted development under Reg. Ret: 91A/1082, 90A/734, 89A/50, 85A/505, T.A.562., R.A. 1123 and R.A. 1098, comprising of the following: 1. 1 No. 3-sided bike shelter with polycarbonate roof and wall sheets measuring 16.5 sq.m GFA to front of building, 2. 1 No. 3.83M High prefabricated structure comprising of additional office space measuring 76.8 sq.m GEA to front of building, 3. 1 No. 7.61M High, permanent storage enclosure with loading bay measuring 178.42 sq.m GEA to rear of building, 4. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 18.11 sq.m GFA to rear of building connected to existing foul sewer, 5. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 13.47 sq.m GFA to rear of building connected to existing foul sewer, 6. 1 No. 6.54M high permanent loading platform enclosure, measuring 100.95 sq.m GEA to rear of building, 7. 1 No. 3.31M (H) glazed curtain wall entrance porch/lobby to main reception measuring 9.11 sq.m GFA to front of building, 8. 1 No. 2.87M (H) glazed curtain wall entrance porch/lobby to main reception measuring 6.63 sq.m GFAto front of building, and all associated ancillary site works on an overall site area of 2.23 hectares.
Extension to rear.
Extension to rear.
The relocation of the use of the existing apprentice joinery workshop training centre for young apprentices from its existing location on site to warehouse unit 2 involving the change of use from warehouse to apprentice joinery workshop training centre and all ancillary internal and external works including the extension of the first floor mezzanine of 747sq.m, minor modifications of the front entrance and provision of a canopy with integrated signage and provision of a waste wood store for recycling as fule for the boiler 29sq.m and dust containment at the rear, the overall GFA is 2,319sq.m; The use of the existing joinery workshop training centre will remain as a training centre for Sisk employees use and include general storage area at ground floor and minor internal and external works will be carried out comprising internally the extension of the first floor level mezzanine by 291sq.m from the existing mezzanine of 234sq.m to 525sq.m and externally the upgrading, cladding and improvements to fenestration of the external elevations, the overall GFA is 1346sq.m.
Demolish existing rear store, partial deconstruction of single storey rear extension and some internal elements; New two storey frontal extension and first floor extension over existing garage attached to the side of house with partial garage conversion to habitable space, front section of garage retained as store area, modifications to existing rear extension, such alterations include new window and door arrangement with a floating window / seat feature to its side elevation, some general internal alterations and improvements on ground and first floor levels, attic conversion to storage space.
Removal of two existing prefabricated classrooms and construction of a four classroom, two storey extension to the west of the existing school buildings, together with connections to services and all associated site works.
Demolition of the existing side extension 34sq.m; New side/rear extension to be built (rear extension to be two-storey), total new extension 72sq.m.
Footpath within the western and southern boundaries of the site; erection of a new palisade fencing of 2.4m in height along the southern and western site boundary and a new pedestrian access gate from the north end of the site boundaries at Crag Avenue; single storey, detached vehicle control structure; provision of hard standing at the north west corner of the site; erection of 7 flood light poles and lights along the southern and western boundaries of the site; all associated site development and engineering works.
Construction of a single storey extension with 2 roof lights to rear; conversion of existing garage; two storey extension to the front and first floor extension to the side over garage; external insulation to all external walls; new canopy and bay window to front elevation; conversion of existing attic; new dormer window and 2 roof lights to the rear; modification of existing windows and doors to existing two storey semi-detached house and all associated site works.
916sq.m new canopy overall height 5.8m over existing external retail area to the north of the existing polytunnel structure together with all associated site works.