Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Alterations and extensions to our dwelling, to include a 19sqm GF extension to the front, side and rear elevations. Also for side pedestrian access together with all ancillary and associated site works.
The development will consist of the provision of a new glazed entrance lobby (24sqm) at the existing west entrance to the Square Shopping Centre (Level 3) and all associated site and development works.
Demolition of side garage and building 2 new two storey dwelling houses on site, each new dwelling containing 1 family flat unit, using existing vehicular access to public roadway to serve 1 new dwelling house. Two new vehicular access to public roadway to serve other new dwelling house and existing dwelling house. All associated ancillary site works.
Demolition of side garage and building 2 dwelling houses on site (1 semi-detached, 1 detached) internal front garden alteration to existing vehicular access to public roadway to serve existing house. Forming new vehicular access on the eastern boundary to serve the 2 new houses, and all ancillary works.
Demolition of side garage and building 2 two storey dwelling houses on site, using existing vehicular access to public roadway to serve 1 new dwelling, forming 2 new vehicular access to public roadway to serve other new dwelling and existing dwelling.
Demolition of side garage and building 2 new two storey dwelling houses on site, internal front garden alteration to existing vehicular access to public roadway to serve existing dwelling house. Forming new shared vehicular access to public roadway to serve the proposed 2 new dwelling houses, and all associated ancillary site works at 1 Watermeadow Drive, Old Bawn, Tallaght, Dublin 24, D24 NY7R
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Attic conversion incorporating dormer extension to rear and 3 'Velux' rooflights to the front; two storey extension to side; all associated site works.
For the construction of new attic room with en-suite and new rear dormer roof structure and associated works.
Construction of one dormer window in the main roof to the rear.
The proposed development will consist of: (1) Conversion of existing garage to living space. (2) A first floor side extension above the existing structure. (3) A redesigned porch/entrance. (4) A ground floor extension to the rear. (5) A redesigned front boundary wall and all associated site works.
Attic conversion with dormer roof to rear and all associated site works.
Ground floor side and rear extension; Attic conversion with dormer roof window on rear slope of roof and window in gable wall all at attic level.
The development consists of the retention of existing 60 sq. m. of additional first floor offices within Unit 13.
New dormer roof structure in existing rear concrete tiled roof structure with two no. ventilated rooflights, convert existing attic area into a non-habitable attic area and internal alterations
Permission to permanently retain the change of use from Civic Offices to medical centre on foot of now expired, 10 year temporary permission (SD08/0594). Proposed uses include public attendance for consultation, treatment and general healthcare provision on all levels from lower ground floor to fourth floor, including retention of existing signage and roof top plant.
Construction of 82 no. residential apartment units and associated commercial floorspace in 3 no. residential apartment blocks 5 to 6 storeys as follows: Block A contains 44 no. apartment units in a 6-storey apartment block (with double height mezzanine corner feature at 5th floor level addressing the corner of Greenhills Road and Broomhill Road). This will consist of 25 no. 1 bed apartments, 17 no. 2 bed apartments and 2 no. 3 bed apartments. All apartment units will be provided with associated private terraces / balconies. Block B contains 23 no. apartment units in a 5-storey apartment block. This will consist of 8 no. 1 bed apartments, 9 no. 2 bed apartments and 6 no. 3 bed apartments. All apartment units will be provided with associated private terraces / balconies. Block C contains 15 no. apartments in a 5-storey apartment block. This will consist of 4 no. 1 bed apartments, 7 no. 2 bed apartments and 4 no. 3 bed apartments. All apartment units will be provided with associated private terraces / balconies. A resident's lounge (c. 73.6 sq.m) for use by occupants of all proposed apartment units is provided at ground floor level of Block C. A commercial unit (c. 148.5 sq.m) front Greenhills Road is also provided at ground floor level in Block C. New vehicular access to the site will be provided from the Broomhill Road. Provision of an area of landscaped public open space (c 776 sq.m) and communal open space (592 sq.m) including c.192 sq.m as a roof terrace area for residents. Lobbies, stair / lifts, photovoltaic panels and green roofs throughout Blocks A, B and C. Provision of 41 no. car parking spaces and 182 no. bicycle parking spaces for residents of the proposed development. All associated site development works, services provision, infrastructural and drainage works, provision of esb substations, bin stores, public lighting, landscaping, open space, and boundary treatment works on this site of 0.69 ha.
For the construction of new dormer structure to the rear and conversion of attic space with en-suite and associated works.
For construction of new first floor extension at front and side of dwelling, new rear dormer attic structure with en-suite and new hipped porch structure and associated works.
Change of use of premises from offices and showrooms to health club and for sign on south façade of building.
Garage conversion; Removal of the existing chimney stack; Construction of ground floor extension at rear; First floor extension at front and side of dwelling; New hipped canopy structure over porch and window; New roof light; Widen vehicular entrance and all associated site works.
The demolition of existing Side extension and the construction of a new two storey, Pitched-roof side extension with a new pitched roof porch. The construction of a new rear dormer and the construction of a 40m2 Rear Extension. Minor internal alterations to the existing dwelling.
Conversion of detached single storey garage to side of dwelling to family flat with alterations to front and rear elevations
Retention of single storey extension & planning permission for proposed subsequent alterations all to rear with associated site paving & landscaping.
New external signage with internal illumination at high level to Northern façade with internal LED display signage (2.5m x 2.1m) at ground floor level.
Installation of a 7.5m x 8.65m retractable canopy/awning, glazed partitions and planters for a 65sq.m sheltered outdoor seating area to the front of existing commercial unit.
Single storey extension comprising of a link corridor, storeroom and two GP consultation rooms to an existing GP surgery, alterations to the existing surgery front elevation, including new entrance door to existing porch, replacing current entrance door with a window. Works include internal layout changes to existing waiting area with proposed new reception and disabled access toilet.
The use of an existing shed of c. 5m2 in the rear garden as a dog grooming parlour
New pitched roof over the converted garage and rear utility room and canopy over the front porch.
Demolition of existing garage structure and construction of double storey side extension; construction of new front elevation canopy and construction of single storey rear extension and all associated works; works will house new kitchen, utility, wc, side room and bedroom with en-suite.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Part change of use from offices and warehouse to ancillary trade counter and showroom, offices and warehouse; reduction in area of first floor; new signage to front; relocating fire exit door to side; ancillary works.
Construction of two new warehouse units (481 sqm each), namely unit 69A and 70A, with ancillary offices located to the north-west of the existing unit 70 and the north-west of the existing unit 69, the reconfiguration of twelve parking spaces to the front of each of the new warehouse units and associated site works.
Alterations to the existing front facade of the existing industrial unit inclusive of external finishes; Proposed facade feature, new windows and new front door; Proposed internal alterations to existing floor plans; Alterations to existing parking lot to include 12 proposed parking spaces inclusive of 1 disabled parking and 2 EV charging point; Proposed new signage and freestanding signage to vehicular entrance inclusive of all associated siteworks.
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
Erect 224sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Warehouse extension (circa 87sq.m) at rear.
Construction of a new approx. 592 sqm single storey extension to the Junior National School to provide a new SEN suite comprising 2 no. classroom bases, a central activities space, shower & WC facilities, ancillary spaces and a new external play areas and a new approx. 345 sqm part-two storey extension to the Senior National School comprising 3 no. en-suite new mainstream classrooms and 2 no. resource rooms. Along with a remodelled car park increasing the number of car spaces from 35 no. to 45 no. and associated site works.
Provision of 1 approx. 100sq.m single storey temporary prefab (prefab 01 comprising 1 classroom & 3 resource rooms) adjacent to the south-east boundary of the site and 1 approx. 70sq.m single storey temporary prefab (prefab 02 comprising 1 classroom) adjacent to the north-west boundary of the site and all associated site works.
Front extension to the existing garage converting the space into a gym and office, new windows to the side of the garage and access door to the rear garden, including all associated site works.
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.
Erect 850.87sq.m of photovoltaic panels on the roof of existing building with all associated site works.
The construction of a 250m2 mezzanine floor extension within an existing warehouse building, and all associated site works.
(1) Installation of: a free-standing mezzanine structure in the northern warehouse [413 sq.m GFA]; and two-level free-standing mezzanine structures in the central warehouse [1,760 sq.m GFA] and eastern warehouse [2,130 sq.m GFA], including all associated stairwells and service lifts.(2) Amendments to the internal layout of the south western warehouse including: the relocation and modification of the permitted stairwells; the removal of the western entrance lobby; the enlargement of the permitted central service lift; the enlargement of the southern reception lobby.(3) Amendments to the warehouse access doors on the north and east elevations. (4) Provision of: 10 no. additional car parking spaces to the north-east of the building, including 1 no. accessible space; and the repurposing of 2 no. permitted spaces to the west of the building for EV charging spaces.(5) Provision of: 10 no. additional sheltered bicycle parking spaces to the north of the building.(6) Adaptation of the turning head in the north-west corner of the site to facilitate fire tender access, together with all associated landscaping and facilitating works.(7) Modifications to hard and soft landscaping to accommodate the proposed works, with no net loss of permitted trees.(8) All associated site development and services works, above and below ground, on a site of c.0.86ha.
The development will consist of: (1) Permission for works comprising of: (i) Partial change of use from warehouse to office use at ground floor level [c.270sq.m GFA] and refurbishment of the existing first-floor office [c.263sq.m GFA] in the north of the unit. The office space [c.533sq.m Total GFA] will comprise individual offices, meeting rooms, stairwells and circulation areas, storage areas, plant, canteen facilities, and WC facilities - including a new accessible WC on the ground floor. The proposed works will also include the reinstatement of existing windows and an entrance, the opening of blind windows, and the installation of a new window on the west elevation. (ii) Change of use from motor showroom, including ancillary workshop and office / storage areas, to warehousing [c.1,056sq.m + c.1,065sq.m. GFA] in the south of the unit. The proposed works will include the demolition of internal partition walls, floors, stairs, and doorways in the south-east of the unit. The works will also include the removal of a mezzanine level in the south-west of the unit [c.130sq.m.] and the installation of two new free-standing mezzanine levels [1,056sq.m. GFA at first floor level + 1,056sq.m. GFA at second floor level] with associated stairwells and a service lift in the south-west of the unit. (iii) Reconfiguration of the car park layout to the south and west of the unit to accommodate 35 no. car parking spaces, including 2 no. accessible spaces and 7 no. electric vehicle (EV) charging spaces, and a service yard to the north-east of the unit. (iv) Provision of 15 no. bicycle stands under a dedicated shelter located to the north of the unit, providing secure long-term parking for up to 30 no. bicycles, and provision of 2 no. bicycle stands to the west of the unit, providing short-term parking for up to 4 no. bicycles. (v) Repurposing of the external plant room to a bin store. (vi) Reinstatement and rebranding of 2 no. previously permitted pylon signs (Reg. Ref. SD15A/0190), located to the west and south-west of the unit, respectively. (vii) Provision of designated signage zones located above the glazed sections at the south-west corner of the building, as well as above the office and warehouse entrances on the west and south elevations. (viii) Provision of hard and soft landscaping, including the planting of native trees along the southern and western boundaries. (2) Retention permission for the existing pylon sign located at the main entrance to the site in the south-east corner. The pylon sign is to be rebranded. (3) All associated site development and services work on a site of c.0.8609ha.
(i) Retention permission is sought for the mezzanine floor, stairwell and associated meeting room; (ii) (a) change of use of Unit F1 from cafe to car rental office and erection of partition walls to create a reception area, staff offices, staff mess area, wc, store room and staff canteen at ground floor; (b) upgrade works including replacement of mezzanine floor and stairwell; (c) installation of company signage to front of unit; and (ii) change of use from commercial car park to car rental and car share facility at basement level comprising of the following: (a) removal of 3 car parking spaces to provide for single storey car rental kiosk (28.82sq.m) comprising reception area; (b) redesignation of 30 commercial car parking spaces as car rental spaces (3 car club, 3 staff, 12 return and 12 rental spaces); (c) removal of 7 car parking spaces to provide circulation route, and car washing area (69.18sq.m) comprising 2 power washers, 1 wash pad connected to the existing petrol interceptor in the car park and car drying area. The car wash will connect to the mains water connection; (d) erection of company signage over entrance to car park from Belgard Square North; and (e) drainage and all associated site development and ancillary works necessary to facilitate development.
The installation of 6 no. 6m high floodlights around the existing pitch and associated site works and the retention of the existing pitch boundary treatment comprising 2.4m high painted metal mesh fence with access gates with 3m high netting above.
The development consists of a first-floor side extension with tiled hip roof and parapet with roof light, attic conversion with dormer roof and windows to the rear, tiled canopy to the front elevation, two roof lights to the front of the existing roof, internal alterations, and all associated site works.