Single storey domestic extension to the rear of the existing dwelling incorporating an extended dining, sitting and kitchen area; the conversion of the existing garage to a living room; a new porch to the front of the dwelling; a new foul drain connection from the dwelling to the main public foul drain on the roadway. All of the above together with all associated site works.
Single storey domestic extension to the rear incorporating an extended dining, sitting and kitchen area; conversion of the existing garage to a living room; porch to the front and all associated site works.
Extension, Change of Use and alterations to Kilnamanagh Shopping Centre; A two storey extension is proposed along the centre's eastern elevation (total GFA increase of 2,336sq.m); Change of Use of the first-floor retail area (last used by Dunnes Stores as textile sales space) which will be extended and subdivided to provide for two new non-retail, service units; Unit 1 will extend to c.1,411sq.m for use as a health centre and Unit 2 will extend to 790sq.m for use as a gym; Removal of condition 3 of PA Ref: SD06a/0095 to allow for the increased net sales area to allow for the increase in net comparison sales space at ground floor level; New entrance ramp and steps at the north of the extension; The southern lobby entrance into Dunnes Stores will be demolished and replaced with a new glazed lobby entrance; New walkway canopy generally on the north and south elevations; New ramped access next to existing pedestrian entrance steps on Mayberry Road; Reconfigure existing entrance to Treepark Road including revised parking layout generally around the east side of the building to allow for an adjusted, one-way, system around the centre; Car parking, as a result of the extension, will be reduced; Four electric vehicle parking spaces; Covered cycle parking; New enclosed service yard wall and gates to existing service area on the west side of the centre; New signage (including illumination) proposed to elevations including two Totem signs; Recladding on elevations. Additional landscaping treatment generally around the east side of the centre arising from the amendments to the car park. Landscaping works and all drainage works including SUDS measures; All other ancillary works to facilitate the development.
The development will consist of: 1. The change of use of part of the first floor from retail to gym use within a unit with a gross floor area of circa 790sqms; 2. Alterations to ground floor lobby entrance and steps; and 3. The installation of temporary wheelchair access ramp to the lobby entrance along the centre's eastern elevation. 4. Planning permission for a 24 hour gym; 5. Erect two new external signs, including manifestations to first floor windows. 6. Installation of bicycle parking.
The Construction of Single-Storey Coffee kiosk complete with signage, site entrance, driveway and car parking area and ancillary site works for 10 years
Alterations to Unit 6 permitted under Reg. Ref.: SD22A/0099 The proposed alterations to the permitted Unit 6 are as follows: Internal alterations at the ground floor level of the permitted warehouse/logistics unit to provide additional ancillary staff welfare facilities, an ancillary trade counter and associated office and storage area, and an ancillary innovation area / testing room; Repositioning of Stair Core 2 at ground and first floor level and proposed extension to the ancillary office floorspace at first floor level, with an additional gross floor area of 110 sq.m; Provision of a first-floor mezzanine level of additional warehouse/logistics floorspace with a GFA of 1,180 sq.m, accessed by new stairs from ground floor level; Alterations to the permitted elevational treatment, including: Reconfiguration and additional glazing on the south-east, south-west and north-east elevations as a result of the proposed internal layout alterations; Removal of the office entrance on the south-east elevation and opaque glazing screen from the WC core on the south-west elevation; Alterations to the cladding arrangements and parapet levels on all elevations (no increase in permitted building height); Central repositioning of grade and dock loading doors on the north-west elevation; Additional entrance doors along the south-west elevation to align with the revised internal layout; Other associated alterations including to the landscaped areas and the extent of boundary fencing; Reconfiguration of the car parking layout, including provision of 3 no. additional parking spaces (40 no. spaces in total, including 2 no. accessible spaces and 8 no. EV charging car parking spaces); Provision of 6 no. additional EV charging spaces for delivery vans to the north of the unit within the service yard; All associated site development works. The proposed alterations result in an overall increase of 1,279 sq.m in the total GFA of the warehouse/logistics unit from 3,997 sq.m to 5,276 sq.m (including ancillary office, trade and staff welfare facilities).
Removal of Condition No's 2 and 6 of Reg. Ref. SD18A/0289: operational times of the weight and fitness training building to be from 06.00 hours to 22.00 hours Monday to Friday and 8.00 hours to 21.30 hours Saturday and Sunday.
Amendments to previous approved Planning Permission Ref. SD21A/0044 for part change of use to facilitate new coffee shop unit at ground floor and a school aged child care unit at part of first floor level, that will be used during primary school term, with area remaining for club activity use at all other times and all associated works.
Construction of a new two storey clubhouse (658sq.m); new external activity area (405sq.m); new boundary fencing for external activity area and all associated site works adjacent to existing all weather pitch.
9 non-illuminated signs to replace existing and 1 new non-illuminated sign.
The construction of a single storey building to be used for Physiotherapy. Access/egress from the proposed development is via the existing club entrance on Monastery Road, Clondalkin, Dublin 22.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e. off licence use) within the overall permitted retail unit; off licence floor area 8sq.m and is ancillary to the primary retail use.
(1) Change of use of the existing ground floor (411sq.m) and first floor (401sq.m) levels from previously granted Showroom/Warehouse storage under Reg. Ref. S01A/0173 and further extended under Reg. Ref. SD02A/0514 to office use. (2) Modifications to the front facade comprising the replacement of the main entrance doors at ground floor level with glazing to match the existing, the installation of a new window to match existing at first floor level and new signage (2sq.m). (3) Modifications to the rear facade comprising the replacement of the existing roller shutter at ground floor level with fixed curtain wall glazing to match existing and the installation of new fixed louvres to match existing at first floor level.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Construction of single storey extension with flat roof to the rear of existing house; alterations to ground floor plan; roof light to the rear and all associated works.
Erection of a new pitched tiled roof over the existing porch and garage at the front and side of the dwelling with a central window and associated works.
Change of use from warehouse to padel tennis sports facility, with minor internal modifications, including reception, ancillary cafe, seating area, bathrooms / changing rooms, and all associated and ancillary site works.
Planning permission is sought for 2 no. Outdoor Padel tennis court facilities with protected screening around both playing surface, permission also sort to operate a social wine service at existing ancillary cafe located internally and all associated site works
Planning permission is sought for 1 no. Outdoor Padel tennis court facilities with protected screening around playing surface, permission sought for this outdoor playing facility for a period of 5 years only and all associated site works
Construction of a single storey extension to the rear of the existing dwelling to include kitchen and living areas; single storey extension of a previously approved garage conversion to align with the front wall of the dwelling and associated site works.
Enlargement of garage to front and side of dwelling, also canopy to extend from garage over front door and all associated site works.
Extension of the existing depot to provide additional bus parking facilities comprising a total of 221 bus spaces (including 45 electric bus parking spaces), 33 car parking spaces (including 15 electric car parking spaces), 5 motorcycle parking spaces and 30 bicycle parking spaces; revisions to the layout and configuration of the existing bus and car parking areas; the installation of electric vehicle charging units and associated infrastructure; new vehicular entrance/egress arrangement (including barrier and ramp) to Ballymount Avenue on the north-eastern site boundary; the provision of 4 pedestrian entrances located on the south-eastern, south-western and north-eastern site boundaries; internal roads and pedestrian pathways; minor elevational amendments to the existing transport depot building (relocation and addition of roller shutter doors and relocation of signage); hard and soft landscaping; boundary treatments; changes in level; lighting; surface water drainage; piped infrastructure and ducting, and all associated site excavation and development works above and below ground. (The development will also include the underground diversion of the existing ESB power line traversing the south-eastern corner of the site.)
Change of existing ground floor office and workshop area to an additional storage area.
The proposed development will consist of a high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 4no. electric vehicle charging bays & 2no. charging units. II. Installation of a new ESB Unit Substation. III. Installation of a new CT Metering cabinet. IV. Associated revisions to existing car parking spaces & landscaped area. V. Erection of associated signage. VI. All associated site development works including lighting, drainage infrastructure and line marking.
Erection of a new 2 storey extension to the side, with internal modifications and associated site works.
Detached industrial unit comprising 960sq.m of workshop area plus 720sq.m stores/offices/staff facilities on two floors totalling 1680sq.m together with hardstanding area, diesel storage tanks, wash bay facilities, site boundary walls/fencing and all associated site development works.
(i) Alterations to existing roofs to include increasing roof height of one bay to match adjoining bay; (ii) new wall & roof cladding including louvred ventilation panels and translucent panels over existing cladding and to altered areas of buildings and extensions; (iii) provision of new roller-shutter doors to three existing opes and three new opes; (iv) demolition of three ancillary structures attached to the north side of the building and provision of four new single storey pitched roof structures attached to the north side of the building; (v) demolition of some existing wall and roof structures to the eastern end of the building, and the provision of new walls & roofs to form new areas of the high-bay plant/fabricating area with raised roof on parapet levels; (vi) demolition of a detached single storey plant building on the north-west of the site and storage buildings on the east of the site and construction of 3 new single storey detached plant and storage buildings; (vii) provision of new signage to the west facing elevation of the building at high level; (viii) all other associated siteworks & services to facilitate the development.
Demolition of existing single storey garage wing; construction of a new house, No.1A adjoining the existing house with the addition of a rear extension and internal layout changes to No.1, along with an additional front driveway entrance and all associated site works.
1) the demolition of the existing single storey side garage and the construction of a single storey front, side & rear extension to the existing two storey detached dwelling, ancillary alterations to all elevations, demolition of existing chimneys and all associated site works, 2) the wrapping of the existing two storey dwelling with external insulation and ancillary alterations to all elevations 3) Widening of the existing vehicular entrance and all associated site works and 4) the increasing in height of a portion of the existing side boundary wall to 2.9m as measured from public footpath side and all associated site works
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Retention of garage conversion to front side and rear of existing house being 22sq.m; retention for single storey shed to rear garden for playroom/storage use and all associated site works.
Demolish existing single storey extensions to side and rear and to construct new single storey extension to rear, new two storey extension to side, with new dutch hip roof replacing existing hipped roof, attic conversion with dormer windows to rear and rooflights to front. New bay window to ground floor front elevation, new detached single storey workshop at rear of garden with new vehicular access off Newlands Road.
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
First floor extension over existing garage and utility to counter lever to the rear with hip roof extension to match existing; garage conversion; new canopy over front door and some alterations to the front facade; 4 'Velux' type window to the front and 1 to the rear; 1 dormer type of window to the rear to allow for attic conversion; some internal alterations; widen existing vehicular access gate and associated site works.
First floor extension over the existing garage and utility to counter lever to the rear with gable end; roof extension from hip to over gable end; garage conversion; new canopy over the front door and some alterations to the front façade; 4 'Velux' type window to the front and 1 to the rear; 1 dormer type of window to the rear to allow for attic conversion; some internal alterations; widen existing vehicular access gate and associated site works.
The relocation of the use of the existing apprentice joinery workshop training centre for young apprentices from its existing location on site to warehouse unit 2 involving the change of use from warehouse to apprentice joinery workshop training centre and all ancillary internal and external works including the extension of the first floor mezzanine of 747sq.m, minor modifications of the front entrance and provision of a canopy with integrated signage and provision of a waste wood store for recycling as fule for the boiler 29sq.m and dust containment at the rear, the overall GFA is 2,319sq.m; The use of the existing joinery workshop training centre will remain as a training centre for Sisk employees use and include general storage area at ground floor and minor internal and external works will be carried out comprising internally the extension of the first floor level mezzanine by 291sq.m from the existing mezzanine of 234sq.m to 525sq.m and externally the upgrading, cladding and improvements to fenestration of the external elevations, the overall GFA is 1346sq.m.
Development of site (Containing 0.68 hectare) consisting of container storage area together with ancillary works including vehicular entrance, Parking area, drainage, Fencing and landscaping works
Retention of single storey kitchen extension to front side and rear of existing house and all associated site works.
Single storey extension to front, side & rear, consisting of demolition and replacement of garage with bed-living room, shower and utility, and enlargement of front porch, totalling 33sq.m.
Single storey extension to rear; conversion of garage area to play room; conversion of existing attic space to home office/cinema/storage with dormer type window to the rear; new first floor extension over converted garage to the side; internal modifications and associated site works.
Erection and installation of 124 photovoltaic solar panels with an area of 235.6sq.m (with average size of 1.9sq.m per panel) on the existing roofslope and all associated alterations to existing elevations, site and ancillary works.
Attic conversion with projecting dormer window to rear roof and 2 no. velux windows to front roof, new study / storage facility, and all associated site works.
Change of the subject unit from office use to physiotherapy / treatment room use. The area of the unit comprises of 152.5 sq.m.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
The construction of a 250m2 mezzanine floor extension within an existing warehouse building, and all associated site works.
Single storey CNG (compressed natural gas) compressor installation with a floor area of 19sq.m; covered shelter with a floor area of 30sq.m and a 2.6m high boundary wall around the site with all ancillary services and associated site works.
3 houses, comprised of two storey, two bed houses, one detached and two semi-detached on a site measuring 0.06ha. Each house is accessed from a private driveway with one private car parking space also provide per house. The development includes all associated site development works.
Garage conversion, single storey extensions to front and rear, first floor extension to side with new Dutch hip roof, attic conversion with dormer windows to rear and rooflights to front and widening of existing vehicular access.
Planning permission is sought for alterations and extensions mainly a box dormer and 3 pitched dormer extensions to provide 3 no bedrooms, a sensory room and an upstairs bathroom and modification to the existing ground floor to turn the existing 3bed bungalow in to a 4 bed dormer with home office. The drainage arrangements will remain as they are and the new bathroom will simply tap in to the existing private drainage, the rainwater collection will remain unchanged & all ancillary works
Construction of a 2 two bed semi-detached dormer bungalows with access from Newlands Park for vehicular parking; all associated site works, car parking, landscaping and boundary treatments.