Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs and flat roof dormer to the rear.
The development will consist of: the construction of a single-storey outbuilding in the rear garden, with a footprint of 35 sq.m, for use as a home office and amenity space.
Retention permission for development consisting of the following changes to the design as approved under planning register reference number SD15A/0084/ PL06S.245493 (extended under planning reference number: SD15A/0084/EP); a) the omission of chimneys b) revised canopy detail above front entrance doors c) the widening of houses 1 & 2 resulting in site layout changes d) revised levels and landscape details / boundary treatments e) changes to the positioning of the window and door in the rear utility room of all houses f) changes to the size and number of Velux windows to the rear roof of all houses and g) changing the rear window of the kitchen / dining room to a door and widening the opening of all houses at 'The Bungalow', Hayden's Lane, Adamstown, Lucan.
The retention of a single-storey outbuilding in the rear garden, with a footprint of 35 sq.m, for use as a home office and amenity space.
Demolition of an existing single storey house and garage (145.30sq.m) and the erection of 6 no. 2 storey houses with converted attics (140sq.m each) in 2 terraced blocks of 3 houses, with dormer windows to the front, 'Velux' windows to the rear and associated site development and drainage works including a new vehicular access for each house fronting onto the public roadway and new front boundary wall and brick piers.
Construction of a residential development comprising 3 three to five storey blocks of 74 apartments (20 one bed, 48 two bed and 6 three bed) all with associated private balconies/terraces to the north/south/east/west elevations; vehicular and pedestrian access from Hayden's Lane to the north west of the site and closure of the second existing vehicular entrance at south west of site; pedestrian access from Griffeen Park to the south east of the site; provision of car and cycle parking, public and communal spaces, bin stores and all associated site development and clearance works, landscaping, boundary treatments and other servicing works.
Replacement of the existing hipped roof with a gable roof to provide accommodation at attic level, including a dormer roof, roof-light and solar/PV panels to the rear; removal of the existing chimney to the front; Other works include a replacement porch canopy to the front entrance, modifications to windows openings on the west-facing side gable (including provision of a new landing window); provision of a new ground floor door on the east-facing gable; external insulation to the sides and rear of the property, internal modifications to the existing house, external landscaping, Shed and miscellaneous other works; to the ground floor rear, the existing pitched roof kitchen will be demolished and a mono-pitch extension built to the rear/side.
Amendments to the residential development permitted under Reg. Ref. SDZ17A/0006 (as previously amended by Reg. Ref. SDZ18A/0005) at a site located in the Tubber Lane Development Area within Adamstown SDZ; modifications relate to permitted house No's. 18-21 Hallwell Park and No's. 1-10 Hallwell Lane (located in the north-eastern section of the permitted development) resulting in the inclusion of an additional three houses and consist of alterations to permitted unit No's 18-21 Hallwell Park to provide for a change of house type and quantity from 4 house type C (two storey, three bedroom) to 2 house type C1 (two storey, three bedroom) and 3 house type C2 (two storey, three bedroom), these modifications result in the inclusion of 1 additional house; alterations to permitted unit No's 1-10 Hallwell Lane to provide for a change of house type and quantity from 10 house type A (two storey, four bedroom) to 12 house type C, C1 and C3 (all two storey, three bedroom), these modifications result in the inclusion of 2 additional houses; all associated and ancillary works; the proposed amendments increase the overall unit number from 169 to 172 residential dwellings; this application relates to development within the Adamstown Strategic Development Zone (SDZ) and is subject to the Adamstown Planning Scheme 2014.
Retention of 1 standby diesel generator with an associated flue (15m high) within the permitted generator compound located to the east of the data centre granted under SDCC Reg. SD16A/0345 increasing the number of standby diesel generators from 5 to 6 within the permitted compound.
Single storey extension to rear and side including garage conversion
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window; new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs and flat roof dormer to the rear.
A new single storey ground floor extension at rear of dwelling, comprising of a kitchen and utility room with flat roof and new roof windows, and all associated site works
Demolition of the existing shed and construction of a 2-storey detached residential development. The proposed development will consist of 4 no. 1-bed apartments, a single-storey bin and bicycle storage, and alterations to the existing entrance including associated site works at 86 Dodsborough Cottages, Dodsborough, Lucan, Co. Dublin.
The construction of a 2-storey extension and any associated site works to the south elevation of the existing engineering stores in the administration offices building which comprises of construction of circa 34sq.m area with a maximum height of 9.4m to accommodate two storey units at Grange Castle Business Park, Grange Castle, Dublin 22. The application relates to development which comprises of an activity, which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.
The development seeking permission will consist of the construction of a two-storey extension to the (west) side of the main house, apply brick to the ground-floor front (north) façade and all associated site works. The development seeking retention permission consists of the construction of a first-floor extension to the rear of the house and all associated site works.
237 dwellings (up to a maximum of c.24,911sq.m GFA) in a mixture of terraced, semi-detached and detached houses, duplexes and apartments as follows; 119 apartment units shall be accommodated in 4 blocks of 2-5 storeys; Block 01 (4 storey) to consist of 20 one bed apartments and 16 two bed apartments; Block 02 (4-5 storey) to consist of 22 one bed apartments and 41 two bed apartments; Block 04 (3-4 storey) to consist of 9 two bed apartments and 1 the bed apartment located within the 4 storey element of Block 4; Block 05 (2-3 storey) to consist of 1 one bed apartment, 5 two bed apartments and 4 the bed apartments, 20 duplexes shall be accommodate in 2 blocks of 3-4 storeys; Block 03 (3 storey) to contain 2 one storey one bed unit, 2 one storey two bed units and 4 three storey three bed units; Block 04 (3-4 storey) to contain 12 three storey three bed units located within the three storey element of Block 4; 98 houses shall consist of 67 two storey, three bedroom houses; 47 with the option of a single storey rear extension at ground floor level (House Types B1.1x and B1.2x); 15 two storey, four bedroom houses; 6 three storey, four bedroom houses and 10 part three storey, part two storey four bedroom houses; provision of 1367sq.m of public open space; provision of c. 318 car parking spaces; re-alignment of the northern section of Tandy's Lane from a point to the north of the entrance to Somerton House to its junction with Adamstown Drive (existing access arrangements will not be affected); all ancillary and associated site development and landscape works; vehicular access to the development is to be provided off Adamstown Drive, The Paddock's Way and the re-aligned Tandy's Lane on lands bounded generally to the northwest by the Hillcrest residential development, to the northeast by Supervalu Lucan, to the east by Westbury Drive, Westbury Avenue, the rear of houses fronting onto Westbury Grove, and Somerton (Phase 1) currently under construction pursuant to SDCC Reg. Ref. SDZ16A/0005, to the south by Somerton House (a Protected Structure), and Tandy's Lane Park Amenity Area (permitted under SDCC Reg. Ref. SDZ18A/0003, and to the west by Adamstown Park and The Paddock's Way with the site located on both sides of Adamstown Drive and also on either side of the northern portion of Tandy's Lane.
Development consisting of change of permitted rear boundary treatment of 8 permitted residential units in 'Somerton Woods' (1 House Type A1.1, 4 House Type A1.2, 2no. House Type B1.2/B1.2X and 1 House Type A1.1h) from permitted 1.3m high timber post and hit and miss board fence with 800mm high pergola above (2.3m total height) to a 2m high capped brick wall with 2.15m high brick piers and timber access gates to private gardens; The overall length of boundary treatment subject to the development being proposed is approximately 49.6m, as permitted, the development proposed is a minor amendment to development permitted under Reg. Ref.SDZ19A/0004, no other alterations are proposed to development permitted under Reg. Ref. SDZ19A/0004 on lands bounded generally to the northwest by the Hillcrest residential development, to the northeast by Supervalu Lucan, to the east by Westbury Drive, Westbury Avenue, the rear of houses fronting onto Westbury Grove, and Somerton (Phase 1) permitted and constructed under SDCC Ref. Reg. SDZ16A/0005, to the south by Somerton House (a Protected Structure), and Tandy's Lane Park Amenity Area (permitted under SDCC Ref. Reg. SDZ18A/0003, and to the west by Adamstown Park and The Paddocks Way. The site is located on both sides of Adamstown Drive and on either side of the northern portion of Tandy's Lane.
Construction of a Volatile Organic Compound (VOC) Abatement system comprising of a thermal oxidiser (TO), associated plant equipment and scrubbers positioned on a bunded concrete plinth with a maximum single stack height of 12m along with two access platforms at 2.5 high and 5.0m high used for maintenance only; The system is set within a 489sq.m (including a bunded area of 213sq.m) concrete compound enclosed by a 2.4m high paladin weldmesh black fence to match the existing utilities perimeter fence; 135sq.m single storey utilities workshop will sit adjacent to the Volatile Organic Compound (VOC) abatement system compound with associated hardstanding area and soakpit; 55m (L) x 3.2m (W) x 5.6m (H) pipe rack extension with the addition of a second tier extension 118.6m (L) X 3.2M (W) 1.2m (H) to the existing pipe rack is required to service the new VOC abatement system compound; a contractor's compound 3,420sq.m comprising single stacked portacabins, workshops, parking for 30 contractors, materials delivery and set down area; the compound will be enclosed by a 2.4m tall paladin weldmesh black fence; modifications to the existing internal access road will include the addition of a new access road and footpath around the VOC abatement system compound and utilities workshop; a permanent pedestrian crossing including associated signage at the existing access road giving access between the contractor's compound and the voe abatement system compound; modifications to the existing site lighting, signage, surface water, foul and process wastewater drainage, hard and soft landscaping including a 3m high planted berm to the north of the contractor's compound; An EIAR (Environmental Impact Assessment Report) will be submitted with the application; this application relates to development which comprises an activity requiring an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.
Single storey extension to front, side and rear consisting of 1 bedroom and all associated site works.
Construction of a 60.5sq.m single storey extension to the front, side and rear of existing dwelling and construction of rear and side dormers to existing roof to accommodate attic storage area.
The development will consist of a fuel tank set down area and canopy (approx. c.279sqm and c.4.8m in height) at Microsoft Grange Castle Campus. All other site development and ancillary works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
The development will consist of the extensions and renovations of the existing dwelling.
Extend the capacity of pre-school service from previous permission allocation of 13 children, to two classes of 15 children each, in the form of a morning (8.30am to 11.30am) and an afternoon (12.00pm to 3.00pm) session.
Alteration of existing attic to accommodate attic stairs and allow conversion of attic into a non-habitable playroom, raising of existing gable wall c/w window and modification of roof from hip roof to a Dutch gable roof, flat roof dormer to rear and skylight to existing front roof.
Construction and use of an all weather football pitch including surrounding fencing, floodlighting and associated site works including a connecting pathway to the existing clubhouse.
Construction and use of an all weather football pitch including surrounding fencing, floodlighting and associated site works including a connecting pathway to the existing clubhouse.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Change of roof profile from hip end profile to Dutch hip end profile to accommodate dormer extension to rear. 1 no Velux roof light to front. All associated site works
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear
Two storey detached four bedroom house with bedroom in the attic space to side of existing semi-detached house with connection into existing main foul sewer and upgrading of existing entrance to a combined entrance / driveway to access the proposed house and all associated site development works.
(a) A change of roof profile from hip end profile to Dutch Hip profile to accommodate attic conversion with dormer extension to rear (b) 1 No Velux roof light to front (c) All associated site works
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window and dutch hip; new access stairs; 2 roof windows to the front and 2 roof windows to the rear.
Single storey front extension to an existing dwelling; and replacement for the windows at the front facade; together will all associated site works
Planning permission is sought for attic conversion, raising of gable wall to change roof profile with projecting dormer to rear roof, new playroom, also 2 new Velux windows to front roof and all associated site works
Planning permission sought by Julian Egidiu & Ana Mihoc for 2/3 storey house (3 bedrooms + attic study room) rear dormer & 2 Velux windows, associated works, set back from existing house in line with existing houses at GREENE HAVEN ESKER ROAD LUCAN. CO. DUBLIN K78 XE28.
Two storey extension to rear and velux to front existing house & all associated works.
Detached single storey pre-school sessional Montessori facility of 20sq.m, Monday to Friday, to converted outbuilding to rear of existing dwelling.
Attic conversion to storage space to include main hipped roof design changed to a continuous A lined roof with a block gable on right side elevation (north east elevation) to include a new window on second floor in proposed new gable wall and three roof lights on the rear elevation.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, flat roof dormer to the rear and 2no. roof windows to the front
6sq.m front porch and living room extension to the front of the dwelling; 34sq.m ground floor living/kitchen extension and a 10sq.m first floor bedroom extension the rear of the dwelling and associated demolition/construction work.
Two storey, 60sq.m rear extension with living/kitchen area; 2 additional bedrooms and internal alterations.
Planning permission is sought for the construction of an office with toilet facility and store to replace existing shed and toilet facility at rear of house.
An attic conversion including change of roof profile from hip to gable, a dormer window to rear and new window to side elevation of existing swelling.
An attic conversion including two dormer windows to the rear and alterations to existing hip roof profile and gable wall to form a new half 'Dutch' hip to the side of existing dwelling.
The development will consist of the construction of a new single storey pitched roof extension to the side and rear of existing dwelling. The works will include the demolition of existing single storey kitchen to the rear, together with all associated site works and services
Construction of P3 Phase II expansion of the existing P3 biopharma production facility which includes the construction of a circa 2,155sq.m, two storey biopharma production facility to a maximum height of circa 14.9m to be located to the south of the existing P3 building; single storey administration extension of circa 210sq.m to a maximum height of 4m to the north of the existing P3 building and internal modifications to the existing P3 building in addition to all associated site works including delivery area; courier pick up/drop off area with 5 parking spaces (including 1 accessible parking space and 1 E-car space); extension to existing external utilities yard (circa 485sq.m) for 3 heat pumps and other ancillary equipment; new internal site circulation road and re-alignment of existing circulation road; 48 additional car parking spaces (including 3 accessible parking spaces and 5 E-car spaces); 24 covered bicycle stands, hard and soft landscaping and external lighting; there will be temporary site entrance and associated temporary access road located to the south east of the site during the construction phase all on 3.68 Hectare application site located within the Takeda Ireland facility at Grange Castle Business Park; an EIAR (Environmental Impact Assessment Report) is submitted with the application and relates to development comprising of an activity which requires and Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
An extension to side of garage, conversion for use as habitable space & extension to side & front of existing house to connect to garage, alterations to elevations to include roof lights to side with associated site works.