For as constructed garage and all associated site works
For (a) removal of existing ground floor roof over living room area, (b) construct first floor above living room area blending with remainder of existing first floor
Of and continued construction of a steel shed
For to demolish old "outhouses", extend existing dwelling house, install an effluent system, new entrance and all associated site works
To refurbish and extend the existing dwelling house, refurbish 2 no. attached sheds to the left and right of the existing dwelling house and incorporate into the refurbished and extended dwelling house, demolish and rebuild an existing stone building and incorporate into the refurbished and extended dwelling house, demolish a dilapidated shed, install a new wastewater treatment system, along with ancillary site works
For the following development which will consist of planning for the construction of a detached dormer dwelling, detached domestic garage, new entrance and driveway, pumped wastewater treatment system and rising main located on ancillary lands, private bored well, and landscaping together with all associated ancillary site development works
To construct an Agricultural Shed and associated site works
The development will consist of: (i) The construction of 7 no. wind turbines with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 no. permanent 38kV electrical substation including a single-story control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank, and all ancillary works, in the townland of Killeagy (Goonan), Co. Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 no. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 no. existing site entrance off the L7080 (‘The Gap Road’) for the provision of construction and operational access; (viii) Provision of 3 no. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 no. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/ roads, including the L7080, and the provision of new site access roads, 4 no. watercourse crossings, junctions and hardstand areas; (xi) 1 no. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 no. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 no. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year operational life of the wind farm from the date of commissioning of the entire wind farm is sought. A Design Flexibility opinion issued by Clare County Council on 22nd April 2024 accomanies this application. The de
Of as-constructed waste water treatment system and raised bed polishing filter together with all associated ancillary and incidental works.
Of a sunroom and small extension to the dining room both at the side of his house and retention of glass door in lieu of permitted window at the front of his house and all associated site works
To Extend the Appropriate Period of Planning Permission for P16-540 for the construction of dwelling house, garage, WWT system, percolation area, entrance and all associated site works
To upgrade and relocate waste water treatment system, percolation area and all associated site works
To construct dwelling house, waste water treatment system, percolation area, entrance, RETENTION permission for as constructed shed and all associated site works
Of revised site boundaries as constructed from that previously granted - File Ref P02-673
To extend the appropriate Period of Planning Permission P15-834 to construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For development which will consist of extensions and alterations to existing dwelling, the provision of a granny flat and all ancillary works
To erect a dwelling house, garage, entrance and install an effluent treatment system and percolation area and all associated site works.
For the construction of a detached single storey dwelling, detached domestic garage, new entrance, onsite wastewater treatment system, bored well, together with all associated ancillary and incidental site works
For development which will consist of the demolition of an existing single storey extension to the side of the dwelling and demolition of a single storey boiler house to the rear of the dwelling, the construction of a single storey extension to the side of the dwelling, construction of a single storey extension to the rear of the dwelling, thermal upgrade to the existing dwelling and ancillary site works
For the construction of a single storey detached home gym and artist studio, hard & soft landscaping, existing connections to services & septic tank, together with all associated site works, as a revised application from previously granted planning reference number: 2360531
The development of a detached home gym and artist studio over two-storeys, hard and soft landscaping, existing connections to services and septic tank, together with all associated site works.
For the following works: construction of a new two storey dwelling with garage and packaged wastewater treatment system and soil polishing filter, new vehicular entrance and associated site boundaries and site development works
For the construction of a single storey extension to the existing dwelling with a detached single storey garage and all ancillary works
To convert existing garage to a one bed residential unit, construct new garage, re-locate and upgrade DWWT System and RETENTION permission for as constructed site boundaries to comply with Folio CE43994F and all associated site works
For the provision of a roofed structure for dry effluent storage (dugstead) and all associated site works
For the following a) to RETAIN change of use of part of existing dwelling as playgroup / pre-school. b) To RETAIN minor elevational changes to existing dwelling including rooflights, conversion of attached garage to bedroom plus sunroom / porch to front of dwelling. c) To RETAIN additional entrance plus front boundary wall and detached domestic garage. And for PERMISSION to upgrade existing sewerage treatment system plus all ancillary site works
Of as constructed garden shed and glasshouse and also RETENTION permission for garage conversion to sitting room in dwelling house,
For the construction of three single storey detached houses, each with a single storey detached garage and a waste water treatment and disposal system, and all associated works, in accordance with the proposed master plan to complete and terminate the existing 'cluster' submitted with approved planning application, P09/743, to include extending the existing private road and footpaths, surfacing to match existing and providing additional street lighting
To install a 6m extension to an existing 24m lattice telecommunications support structure with headframe carrying telecommunications equipment, together with associated equipment and cabinets enclosed within a 2.4m palisade fence compound
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
To construct a slatted unit with an underground slurry storage tank for housing livestock
To construct an extension on to existing dwelling to the front and rear of the dwelling and attic conversion, together with the construction of 4 dormers to the front roof, 2 dormers to the rear roof and a dormer and velux window on the roof of the rear extension, together with the construction of a garage to the rear of the dwelling to be used for storage, together with general landscaping and all associated works
Of dwelling and extensions as constructed to the front and rear of the dwelling as granted under planning ref P24/120. Together with general landscaping and all associated works
To construct beef shed with slatted tanks and all associated site works
To extend and carryout alterations to existing house, convert existing garage to dwelling use, erect a new garage with workshop and storage space and all associated site works
The development will consist of a single storey rear and side extensions and new rooflights, alterations to the existing house, incorporating change of use of the existing garage (part of house) to dwelling use and the construction of a new detached garage together with associated site works and services.
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For the construction of a dwelling house, garage, entrance, wastewater treatment system and all ancillary site works.
For the following a) demolition of existing substandard outbuilding b) improvement of existing vehicular entrance, c) the renovation of existing dwelling house to include replacement roof and repair of external walls, d) construction of a two storey extension to rear of existing house with a single storey link & single storey extension to the side, e) installation of an onsite waste water treatment system with polishing filter together with f) all associated site works
For development which consists of the construction of a roofed dungstead, loose house with meal store and associated site works
For the demolition of existing shed and construction of a single storey extension to rear of house together with all associated site works
For modifications to an existing access, to erect a dwelling house, effluent treatment system and percolation area and associated site works, demolition of a derelict building
To construct a single dwelling house, garage and advanced wastewater treatment system along with ancillary site works
For the construction of a detached dormer dwelling, detached domestic garage, new entrance, onsite wastewater treatment system, bored well, together with all associated ancillary and incidental site works
For detached single storey dwelling, detached domestic garage, onsite wastewater treatment system and percolation area, bored well, connection to necessary services, new entrance together with all associated ancillary and incidental site works
For construction of a new detached dormer dwelling, detached domestic garage, bored well, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works
Of existing front boundary security fence and entrance gate and for PERMISSION to lower height of fence to 1.2m, remove existing double side entrance gates and replace with matching fencing and all associated site works
Of security fence and entrance gate on the front boundary of their dwelling and all associated site works
For construction of new detached dormer dwelling, detached domestic garage, bored well, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works
To Retain the Conversion of the Attic of existing dwelling to comprise of Stairs, Landing, 2 Bedrooms, 1 En-Suite, 2 Walk-in-wardrobes, Bathroom, Office and Storage with 9 Rooflight windows and 3 Gable windows. We also apply for retention permission for wastewater treatment plant as installed and commissioned including ancillary site works