To construct a grain store, concrete aprons & all associated site works in my farmyard
Revisions to development permitted under Reg Ref 08/610066 ( as extended by Reg Refs 13/610035 and 19/373 and revised by Reg Refs 16/1418, 18/1033 and 19/266) and shall provide for (1) the omission of 3 no residential units (comprising 2 no 4 bedroom semi detached two storey Type A house units and 1 no 4 bedroom detached 2 storey type A house unit) and the provision of 5 no new residential units (2 no type C2 units and 3 no type C2 units) at an alternative location within the site and (2) omission of a permitted community / crèche facility and delivery of a new crèche facility of c 353.9 sqm GFA at an alternative location within the site. The new residential units shall comprise 5 no 3 bedroom house units (2 storeys in height) in the form of 2 no type C1 end of terrace units (c 96.8 sqm each) and 3 no type C2 mid terrace units (c96.8 sqm each) and associated private open space to the rear of each unit. The new crèche facility shall comprise a single storey building of c353.9 sqm GFA, associated outdoor play space of c 344.8 sqm, 2 no baby rooms, 2 no activity rooms, 1 no sleep room, entry foyer / shared central space, accessible WC, admin office, sluice / laundry area, staff tea station / kitchen, and dining area / family room / multipurpose space. The proposal shall also provide for 18 no car parking spaces (10 no car paring spaces to serve the 5 no residential units and 8 no car parking spaces to serve the new crèche facility), all associated landscaping works including boundary treatment, bin storage facilities, and all associated residential access roads and site development works. All other development within the site shall remain as permitted under Reg Ref 08/610066 (as amended and extended)
Construction of a 24m multi-user monopole telecommunications support structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets and associated site works including new access track on lands at Kilqueeny, Avoca, Co. Wicklow. The installation with form part of eir Mobile telecommunications network
Proposed first floor extension to the side of dwelling and associated works
Dwelling and garage with services and all associated site development works
Construction of dwelling (183sqm), installation of sewage treatment facility and percolation area and all ancillary works and landscaping
Construction of a dwelling and all associated works on site
Dwelling, well, effluent treatment system, upgrading existing entrance and associated works
Proposed new dwelling, garage, on-site sewage treatment system to current EPA standards, new road entrance and all ancillary site works
A) the relocation of and minor alterations to the rear extension previously granted permission under planning no. 066119, b) the construction of a detached domestic garage to the rear of the existing dwelling and c) all associated works
For modifications to the dwelling and site granted permission under Reg Ref 20/746. For (1.) A reduction to the overall subject site area.(2) A revised location for the approved dwelling site layout/entrance driveway. (3). A revised location packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards (4.) A revised location for a proposed groundwater well and all together with required site and development works
Installation of 6 no. 16m high floodlights and all associated site works
To erect a 532m2 commercial building comprising a 432m2 manufacturing/industrial unit with an ancillary 100m2 office space along with all associated site development works including storage yard, car parking and connect to the existing services
Section of building extended to make building square on north corner and elevation changes, and permission for a change of use to light industrial storage and the appropriate treatment and recycling or reclamation of metals and metal compounds from end of life vehicles, new front boundary security fencing, storage racking for up to 10 end of life vehicles awaiting depollution. The proposed development will be subject to a Waste Facility Permit and all associated works
Outline Reg Ref 23/444. The development will consist of a dwelling circa 191msq, a domestic garage, packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards, a groundwater well, together with all required site and development works
Demolish existing shed and construct a dwelling and garage and all associated site works
Proposed new dwelling, upgrade to existing entrance, bored well, effluent disposal systems to EPA Cop 2009 standards and all associated site works
New dwelling house & driveway, a packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards & a groundwater well together with required site and development works
Single storey detached outbuilding to the rear of the existing dwelling along with all associated site development works
Replacement of 1 no. detached house (House Type B) & 2 no. semi detached houses ( House Type A) at site no's 20,21 & 22 The Drive to 3 no. detached houses (Type PBd) together with all associated site works within an existing estate (Heatherside being constructed at present) pursuant to Plan Reg. Ref 08/610066, 13/610035, 19/373
The proposed development will consist of replacing the existing boundary fence on three of the site boundaries with a stronger more secure type of fence as shown on the drawings submitted with this application
1) A portal fame structure 20 metres long by 14 metres wide by 7.5 metres high (floor area 280m2). The building will be used as a store to house spare parts and maintenance equipment. 2) A single storey office 5.0m by 3.5m within the proposed store to keep records and specification details of the spare parts and equipment stored. 3) Associated site works
Dwellinghouse with services, domestic garage and all associated site works
To erect a 1,555m² extension to the rear and 720m² extension to the side of the existing 2,575 m² manufacturing & engineering industrial unit & 700m² office building along with all associated site development works
New single storey log cabin style structure for use as a home office/art studio/gym/store, floor area 34.25sqm, located to the rear of existing dwelling, along with all associated site works
Extension of appropriate period of 15/1101 (the construction of an 80-bed nursing home (c.4610sqm) together with 34 no. independent (supervised) living units (c.2523sqm), an effluent treatment system, new access road, changes in level and associated landscaping works (c.7133sqm gross floor area). The proposed nursing home is a 2 storey with pitched roof providing bedrooms & communal areas around an internal courtyard. The 34 no. independent (supervised) living units are provided in 4 no. main house types as follows: 12 no. semi-detached 2-bed general needs houses (Type A, 2-storey c.74.7sqm); 4 no. semi-detached 2-bed general needs house (Type B, 2 storey c75.6sqm): 6 no. 2 bed apartments (Type C/C1, 2 storey c.65sqm plus c.92sqm communal/circulation areas). Parking is provided for 67 cars and access from the L2180 Arklow Road is permitted under Reg. Ref. 09/1169 (extended under Reg. Ref. 15/151). The development will also comprise changes in level including cut & fill works, provision of retaining walls, on-site waste water treatment system, hard & soft landscaping works, and all other associated site excavation & site development works above & below ground)
Erect a 3m2 first floor suspended extension to the side of the existing dwelling along with all associated site development works
Alterations and revisions to the already approved permission granted under PRR 20/632. Retention permission is sought for (1) an additional 275m2 of floor area to the already approved 2,300m2 manufacturing & engineering industrial unit now totalling 2,575m2 with minor alterations and revisions to the elevations and (2) minor alterations and revisions to the elevations, floor plan and internal layout of the connecting office building providing an additional 200m2 of office floor area to the original 2nd floor approved storage area with an additional 60m2 fire escape stairwell to the already approved 440m2 office building, now totalling 700m2. All associated site development works including storage yard, car parking, signage, and connection to the existing services and the same as approved under PRR 20/632
Erect a 2,300m2 manufacturing & engineering industrial unit with connecting 440m2 office building along with all associated site development works including storage yard, car parking, signage and connect to the existing services
1. The conversion /extension of the existing bungalow to a dormer /one and a half storey dwelling by increasing the roof height. 2. Alterations to all elevations. 3. Removal of existing septic tank and installation of new treatment unit and soil polishing filter to current standards and all ancillary site works
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
Construction of single and two storey extensions to the existing house, alterations to all elevations including the addition of new dormer windows, connecting to existing mains services and all ancillary works
The continued use of the existing prefabricated buildings previously granted under register reference numbers 12/610024, 14/1439, 16/798, 17/196 and 19/426, together with associated ancillary site works
Erect a 8,875m2 manufacturing & engineering industrial extension with 1,020m2 additional office space to the side of the existing 5,550m2 manufacturing & engineering industrial & office building along with all associated site development works
1 no. agricultural slatted unit of 67.5sqm with underground effluent storage tank, for the housing of cattle. The structure is mono-pitched with a maximum height of 4m and the effluent storage tank is 2.4m (8ft) deep. The shed is constructed of poured concrete base and rising walls, rolled steel joist (RSJ) beams and galvanised sheet cladding
Proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will provide for a revised energy centre design, to include the provision of 8 no. gas turbines (with associated flues of 25.15m in height), 4 no. black start emergency generators and associated transformers, 2 no. single storey fuel oil pump rooms with a gross floor area (GFA) of 90.17sq.m, a single storey air compressor building with a GFA of 88.9sq.m, 4 no. fuel tanks, 2 no. MCC control rooms with a GFA of 44.17sq.m, 3 no. fire water tanks, a single storey welfare, storage, and pump room building with a combined GFA of 160.97 sq.m, a two storey MV /LV building with a GFA of 655.54sq.m, 8 no. 11kV/ 33kV step-up transformers in the north of the site, water treatment equipment, and a security hut, all within a fenced compound. The proposed development includes landscaping and planting, boundary treatments, lighting, security fencing, car parking, and all site works including underground foul and storm water drainage network (including on-site wastewater treatment system), and utility cables, along with all associated and ancillary works. An EPA- Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development
Installation of 6 no. 15m high floodlights together with associated site works
Change of use of partial area of unit 1 from commercial / recreational to preschool and associated works
Installation & construction of a new 40m X 25m all weather astro-turf soccer training pitch to include the erection of 4 No. total 10m high floodlight posts in each corner of the pitch together with 3m high fencing & 5m high protective netting to the perimeter of same all connecting into existing services and including all associated site works
Garage and adjoining extension
Construction of four no. light industrial / enterprise units for employment-generating use, including vehicle-related service uses, each incorporating ancillary office, WC and kitchenette facilities, together with associated car parking, drainage infrastructure (including oil and silt separation) and all associated site development works
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. generators. 6 no. flues 33 metres in height will be accommodated along the south-western elevation of the building. •Construction of a battery compound to provide electricity storage and backup power, located to the northeast of Energy Centre 2, to comprise 27 no. battery arrays within a compound area of c. 0.7 hectares. A single storey MV switch-room building (c. 181 sq.m. GFA) will be provided to the west of the battery compound. •Provision of a transformer compound (to the northwest of Energy Centre 1), along with a welfare building (c.38 sq.m. GFA).•Provision of fuel storage tanks (2 no.) within a bunded compound to the north of Energy Centre 2.•Construction of a new access from the existing estate access road to the north of the site, internal road network and circulation areas, footpaths, provision of 6 no. car parking spaces and 4 no. cycle parking spaces. •Landscaping and planting, boundary treatments, lighting, security fencing and all associated ancillary and site works including underground foul and storm water drainage network (including on-site wastewater treatment system) and utility cables
Single storey extension (19.25 sqm) to side of existing dwelling, all above with associated site works
Extension of an existing telecommunications lattice tower (providing the new overall height of 37.5m), carrying existing antennas, dishes and associated equipment and additional antennas, dishes and associated equipment, together with new ground equipment cabinets, new fencing and all associated site development works
A new dwelling house, provision of an entrance onto existing driveway, provision of a driveway, access to site by right of way, provision of an effluent treatment system to comply with current EPA requirements, provision of a well and associated works
Demolition of existing car port/tool shed to make way for: Proposed ground floor extension @ gable end of existing dwelling house consisting of bedroom & shower room, and associated site works
Construction of an extension to side and rear of existing garage, creation of a granny flat in part of extension to garage and part of existing garage, creation of boiler room in part of rear extension to garage, removal of 2 containers, new outdoor patio area, new covered canopy area to rear of dwelling, converting rear window in existing dwelling to door and associate works
1) a single-storey sunroom extension to the north west elevation of the existing dwelling and 2) a domestic storage shed along with all associated site development works
Retain velux roof windows to attic storage space, front and rear of property and associated site works
Bungalow, effluent treatment unit with discharge into public sewer and associated site works, revised location of access point from public road to adjoining Cherrybrook premises