Reclamation of land through the filling of material for the purpose of improvement of land, together with site access and ancillary works granted under PRR No. 18/74
Construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto public road and associate works
A dwelling, garage, bored well, wastewater treatment system to current EPA standards and all associated ancillary site works and services
Construction of a storey & a half dormer style dwelling, domestic car garage, wastewater treatment system, bored well & all associated site works
Bungalow, detached domestic garage, effluent treatment system in accordance with EPA 2009, and associated site works
As constructed garage and location of effluent treatment unit
Dwelling, effluent treatment system in accordance with EPA 2009, and associated site works
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
The reclamation of land through the filling of material comprising clay, silt, sand, gravel or stone on a site having an area of 4.41 hectares, for the purpose of improvement of land, together with site access and roadway and other ancillary site works. The proposed development relates to an activity, which requires a waste licence
An extension to existing dwelling and associated site works
1. Retention of construction of as built conservatory extension to the side 2. Retention of construction of as built utility and porch extension to front. 3. Retention of construction of as built garage. 4. Retention of external lean to covered area to rear and all ancillary site works
Proposal to replace existing unauthorised log cabin with farm house, garage & waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works
Existing extension to side & rear of existing dwelling and Permission for new single storey rear extension, alterations to fenestration, addition of rooflight to front elevation & upgrade of waste water treatment system
Construction of a dwelling with an effluent treatment system, all together with associated structures and site works
Revised house design from that as previously granted under plan ref. 24/347 together with associated site works
Dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Amendment to planning permission ref: 23/498 for retention permission for demolition and rebuild of existing bungalow and for permission for garage and revised layout for waste water treatment system and soil polishing filter all on revised site outline
Demolition of lean-to and extension to existing bungalow and construction of new stepped single storey extension, upgraded vehicular entrance, new waste water treatment system and soil polishing filter and all associated landscaping works
Short term retention of unauthorised log cabin to allow for family farmhouse, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works. To be completed. Granted under PP 21/346
Replace existing unauthorised log cabin with Family Farm house, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works.
Reclamation of land through the filling of material comprising of clay, silt, sand, gravel or stone on a site having an area of circa 1.9981 ha for the purpose of improvement of land for agricultural use and temporary haul road from existing GAA carpark and ancillary works including portable truck wheel-wash, office/chemical toilet
1. New single storey toilet block and store rooms extension to rear of existing public house. 2. Conversion of existing stone building to side of public house to lounge/ bar use with alterations to elevations. 3. New vehicular access road to existing car park to rear of public house with additional car parking spaces and cycle parking. 4. New septic tank and percolation area to replace existing system. 5. New photovoltaic panels to front of public house. Retention permission sought for the following: 1. Existing entrance lobbies and ramp to front of existing bar and lounge to public house. 2. Existing smoking area with glazed canopy over to front of public house. 3. Existing signage to front of existing public house. 4. Existing vehicular entrance with splayed wall and piers to front to replace previous vehicular entrance. 5. All above with associated siteworks
Dwelling, wastewater treatment system to EPA standards, garage, entrance and associated works
(i) change of use of a vacant pub at ground floor level and restaurant at first floor level at The Farrier’s Inn, Kilcashel, Avoca, Co. Wicklow, Y14 CX96, to 1 no. studio apartment and 5 no. two-bedroom apartments. A total of 7 no. car parking spaces and 14 no. covered bicycle parking spaces are proposed to serve the development; (ii) internal and minor external alterations to facilitate the change of use. The units will be served by private amenity space in the form of terraces to the south of the building; and (iii) all ancillary site works necessary to facilitate the development
Construction of a new single storey detached dwelling, with separate detached single storey domestic garage, and new on-site waste-water treatment facility to current EPA standards, together with a new private well, and all ancillary site works at a site
Dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Construction of a 5m high ball wall, fenced enclosure with synthetic grass surface
1 bedroom apartment, 3 no. agricultural sheds, utility and toy store. Permission is also sought for the removal of condition no. 2 from grant of permission 96/4273 and all associated site works
(1) side extension to main building by conversion of attached existing store room; (2) conversion of existing stable/store rooms to form additional habitable rooms as part of main dwelling; (3) construction of designer’s studio; (4) construction of artist’s studio; (5) construction of greenhouse; (6) construction of two storage sheds and (7) replacement of septic tank with new sewage treatment system and percolation area
Construction of a single storey detached dwelling (with internal mezzanine area), well, effluent treatment system to current EPA standards, and all ancillary site works
Extend the appropriate period of a permission - 15/473 - Engineering and Public Health & Safety works on a site at East Avoca Mines including (1) re-routing of existing electricity line to run underground along the access road to the east of the site and removal of the pylon located within the site (2) stabilisation, safety and drainage works at the “850 Adit” including rehabilitation and reconstruction of the entrance portal and first 30m (approximately) of the adit, provision of new gates and provision of a 750m long (approximately) drainage pipeline on the floor of the existing adit to address existing safety, structural, environment and drainage issues (3) restoration and stabilisation works to the “Ore Bins” and the adjacent crib wall to address existing structural and safety issues (4) minor protection works to the exposed portal of the “Upper Flat Rod Tunnel” adjacent to the Ore Bins to ensure earthworks in the area do not impact on its integrity or setting (5) development of a surface and underground drainage network on the road to the rear of the site and across the spoil heap to facilitate improved site drainage (6) stabilisation and re-grading of the spoil heaps and embankments, capping of the spoil heaps and landscaping works to facilitate the movement of surface water, to protect human health through the prevention of direct contact and/or airborne inhalation to minimise pollution of adjacent watercourses, and (7) ancillary site development works at the site. Without prejudice the Minister is also seeking retention permission in relation to works to the spoil heaps and associated ground adjacent to the railway line. All of the proposed works relate to the Protected Structure “East Avoca Mines” at Tigroney West (Wicklow County Development Plan Reference PS35-13) which includes features described as “ The flat rod tunnels, spoil heaps and associated disturbed ground AO
Extension to dwelling and retention of shed
Proposed change of use (the removal of condition 2(a) of planning register reference 01/5292) from restricted use as a dwelling to use by all classes of persons
As constructed dwelling, revised boundaries and permission to upgrade existing percolation area to current EPA standards and removal of condition number 2 from 03/9511 from restricted use to use by all classes of person
Demolition of existing dilapidated dwelling, the construction of a proposed new single storey dwelling, upgrade of effluent disposal system to current EPA standards, bored well, together with all ancillary site works
233 sqm single storey dwelling, 48 sqm single storey garage, vehicular entrance via existing agricultural entrance, bored well, effluent disposal system to current EPA standards, all associated ancillary site development works
The construction of a new vehicular entrance and all ancillary site works
Construction of a single storey detached dwelling, effluent treatment system to current EPA standards and all ancillary site works
Removal of existing septic tank, installation of new septic tank, percolation area to current standards and associate works
Consists of the continuation of use of an existing Waste Recycling Facility (previously approved under planning reg ref 12/6015 and 16/1434) to include acceptance, recovery and recycling of construction and demolition waste by crushing and screening of soils, stone, concrete and tarmacadam materials with a maximum annual throughput of 25,000 tonnes per annum. Permission is also sought for the continued use of mobile crushing and screening plant, stockpile areas, skip storage area, portable office and chemical toilet, and wheelwash and all ancillary activities necessary for the continuation of use of the development. The continued use of development will be subject to a waste facility permit
Dwelling, garage, waste water treatment system to EPA standards, new entrance and associated site works
For the completion of the partially constructed detached clubhouse and all ancillary site works, previously granted permission under Planning Application No. 17185
For the construction of a bungalow with garage, new entrance off existing laneway and a new treatment system and percolation area to current EPA standards and all ancillary site works
Deposition of soil and stone over an area of c.2.0 ha for the purposes of land improvement with an agricultural end use
Agricultural entrance and all associated site works
The construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto existing entrance of laneway which leads to the public road, upgrading existing entrance onto public road and associate works
(i) a new entrance (ii) existing entrance to be closed and made obsolete (iii) the importation of material to in-fill and re-contour the subject site, and all associated site development works. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243 tonnes to fill Phase 2, 28,596 tonnes to fill Phase 3, and 28,596tonnes to fill Phase 4, equating to a total of 123,987tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
The construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto public road, block up existing entrance onto road and associate works
Proposed two storey extension to dwelling and to upgrade the existing sewage treatment system
1. The conversion /extension of the existing bungalow to a dormer /one and a half storey dwelling by increasing the roof height. 2. Alterations to all elevations. 3. Removal of existing septic tank and installation of new treatment unit and soil polishing filter to current standards and all ancillary site works