Demolition of an existing underground wastewater treatment plant and ancillary structures and the construction of a new and expanded underground wastewater treatment plant. The proposed development includes the provision of: new underground tanks, chambers, pumps and piping; a mechanical screen (2.43 m in height); 4 no. ancillary control kiosks/cabinets (ranging in height from 1.41 m to 2.14 m); an odour control unit (1.6 m in height); the provision of an extension to the 2.4 m high paladin fence and an associated access gate (4 m wide; 2.4 m in height) extending the enclosed area to facilitate the expanded wastewater treatment plant (by 182 sq m); and the provision of additional planting within the extended fencing. A Natura Impact Statement has been prepared in respect of this planning application
An entrance, a driveway, an internal stairs and the omission of a window from the side (south east) elevation and all associated garden and site works. Full planning permission is also applied for a garage, a first floor (north west facing) gable end window and all associated works and site works
Single storey entrance porch to the western/ public roadside elevation of 14 sq.m. on foot of warning letter UD5645
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Domestic garage as built and associate works
Alterations and additions comprising the demolition of existing single storey sunroom to gable end, and the construction of a new single storey living room extension in lieu of same, together with the construction of a new 2 storey dormer extension to the rear, including alterations to exiting window openings to each gable end at first floor level, and new patio doors in lieu of an existing window opening to front elevation at ground floor level, and all ancillary site works, connecting into existing services, at an existing detached 2-storey dormer dwelling
For retention permission for extensions as built, stone elevations as built, new roof on dwelling as built, internal layout as built, conversion of attic space as built and permission for removal of existing sewage system, installation of new wastewater system to current standards, blocking up existing domestic and agriculture entrances, construction of new entrance onto public road and associate works
New vehicular entrance onto R772/Old N11 and all associated site works
Change of use from residential to short-term letting use and associated works
(i) a new entrance (ii) existing entrance to be closed and made obsolete (iii) the importation of material to in-fill and re-contour the subject site, and all associated site development works. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243 tonnes to fill Phase 2, 28,596 tonnes to fill Phase 3, and 28,596tonnes to fill Phase 4, equating to a total of 123,987tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
Dwelling, garage, waste water treatment system to EPA standards, entrance and associated works
The installation of solar panels over the roof of an existing telecommunications cabin on a steel frame (covering an area of c.46 sq.m., to a maximum height of 4.6 metres above ground level). Works to consist of all ancillary development works, including steel uprights at
Extend the appropriate period of 16/516 - 60 solar panels on the roof of a grain store
Alterations and additions to an existing single storey detached dwelling, comprising the construction of a new single storey utility room extension to the rear, the construction of a new single storey bedroom extension to the front elevation, and the conversion of an existing detached garage area into home office, together with the construction of a new single storey domestic garage to the side of the existing dwelling, including all ancillary site works. Retention permission is also being sought for the conversion of an existing detached single storey garage structure into ancillary games/garden room at the same address
1) a single-storey sunroom extension to the north west elevation of the existing dwelling and 2) a domestic storage shed along with all associated site development works
The installation of underground electrical infrastructure between the existing Arklow Gas-insulated Switchgear (GIS) 220kV Substation and the permitted Pollahoney GIS Substation. This will include the installation of approximately two underground electricity cable circuits, each at 3.12km in length and associated underground ducting, horizontal directional drilling, joint bays, communication cabling infrastructure between the existing Arklow GIS 220kV Substation and the permitted Pollahoney GIS substation, (WCC reg ref 20/1285). All associate and ancillary site development, remedial and construction works will be concentrated along the public road network, i.e. R772, L2180, L6179-0 and L-61791-0 to facilitate the underground cabling infrastructure within the townlands of Killinskyduff, Tiknock, Kilbride and Shelton Abbey. The application will include an Environmental Impact Assessment Screening Report (EIA)
As constructed side extension to existing dwelling and all associated ancillary site works and services
To relocate existing vehicular entrance to our home to improve sightlines to public road and associated site works
To convert part of my home to preschool facilities and all associated site works
Erect a first floor dormer extension with alterations and revisions to the elevations of the existing dwelling along with all associated site development works
Removal of planning condition no. 3 of planning ref 01/5242 (from restricted use of dwelling to use by all classes of persons)
Use of building 2 as a self-contained granny flat including built in kitchen
Erection of 108.80m² side extension to existing 261.12m² shed, along with all associated site development works
Agricultural entrance and all associated site works
Of 1) garden room and 2) garden storage building
Rear/side extension to existing main cottage. Permission for new extension to the rear of main cottage, which will create a link connection, to existing outhouse buildings, conversion of existing outhouse building to home office/workshop and conversion of existing outhouse building to self-contained apartment/granny flat, with double bathroom extension to the rear-south elevation, one for the studio, one for self-contained apartment/granny flat. Associated site works and some internal alterations
Demolition and removal of the existing 3 bed single storey detached dwelling ‘Woodview Cottage’ (84sqm) and for the construction of a new 4 bed two storey detached dwelling (180sqm), for connection to all existing site services above and below ground, for all associated hard and soft landscaping and for the construction of a new 1.2m high timber post and rail fence on the south eastern site boundary
Proposed change of use (the removal of condition 2(a) of planning register reference 01/5292) from restricted use as a dwelling to use by all classes of persons
Dwelling, garage, waste water treatment system to EPA standards, new entrance and associated site works
1) existing two storey extension constructed to the front of original farmhouse; 2) construction of single storey extension to side of existing farmhouse and 3) one no. self-contained workers quarters and 4) permission to upgrade sewerage facilities with all associated site works
Single storey extension (19.25 sqm) to side of existing dwelling, all above with associated site works
1. New single storey toilet block and store rooms extension to rear of existing public house. 2. Conversion of existing stone building to side of public house to lounge/ bar use with alterations to elevations. 3. New vehicular access road to existing car park to rear of public house with additional car parking spaces and cycle parking. 4. New septic tank and percolation area to replace existing system. 5. New photovoltaic panels to front of public house. Retention permission sought for the following: 1. Existing entrance lobbies and ramp to front of existing bar and lounge to public house. 2. Existing smoking area with glazed canopy over to front of public house. 3. Existing signage to front of existing public house. 4. Existing vehicular entrance with splayed wall and piers to front to replace previous vehicular entrance. 5. All above with associated siteworks
233 sqm single storey dwelling, 48 sqm single storey garage, vehicular entrance via existing agricultural entrance, bored well, effluent disposal system to current EPA standards, all associated ancillary site development works
1. Full planning permission is been sought for a proposed secondary treatment system to current EPA guidelines with percolation area and all associated site works, 2. retention permission is been sought for the following (a) an existing glass conservatory circa 19.6sqm connected to existing dwelling (b) the retention of an existing grain store to a games room and office room circa 60.4sqm and (c) the retention of the part conversion of an existing out building to a one bedroom holiday let unit/short term let unit circa 73.5sqm and all associated site works
The construction of a domestic single storey extension to existing dwelling and all associated works
To construct a grain store, concrete aprons & all associated site works in my farmyard
The construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto existing entrance of laneway which leads to the public road, upgrading existing entrance onto public road and associate works
Partial demolition works to existing single storey dwelling and the construction of new single storey extension and alterations to the existing building footprint, site boundary works comprising the setting back of a portion of the existing roadside boundary and all other ancillary works
Erect an agricultural shed along with all associated site development works
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Construction of a new dwelling, wastewater treatment unit and polishing filter, new well, new entrance onto public road and associate works
Insertion of a new 49m2 toilet block within the internal courtyard of the existing building and the change of use of the 28m2 first floor of the development from Residential to staff welfare areas solely related to the Ground Floor Operations
Erection of a ground floor extension (incorporating a domestic garage/store), first floor extension and to carry out alterations to existing dwelling house. Permission is also sought for a new replacement wastewater treatment system to current EPA standards and to decommission the existing system on site and to carry out associated ancillary site works
The insertion of a new 49m2 toilet block within the internal courtyard of the existing building and the change of use of the 425m2 first floor of the development from residential to restaurant/function room
Bungalow, effluent treatment unit with discharge into public sewer and associated site works, revised location of access point from public road to adjoining Cherrybrook premises
Extension to the side of dwelling and associated works
Dwelling and garage with services and all associated site development works
The development will consist of the following works: 1. A 2.8sq.m porch extension to main entrance built under the existing slate canopy. 2. Demolition of an existing 13.2sq.m conservatory and replacement with a single storey extension in blockwork with a painted render and slate finish. The new structure will increase the existing conservatory floor area by an additional 7.2sqm. 3. A 158.3sq.m mezzanine extension for office use, constructed above the existing food production area. 4. The total floor area added at all levels will be 168.3sq.m 5. Modifications to existing elevations as necessary to provide windows to new internal spaces and replace existing entrance doors with a window.
Detached single storey timber clad cabin for office and gym to rear/side of existing house along with associated ancillary works
(a) Demolition of the agglomeration of five different non-original extensions to the east façade at the rear of the main house, (b) Demolition of the non-original timber-glazed extension and wheelchair ramp at the north-east corner of the main house, (c) Demolition of the non-original timber-glazed extension at the south elevation of the main house, (d) Part demolition of the outbuildings situated to the rear of the main house to expose, retain and express the remaining historic east wall of the c.1892 constructed original outbuilding, which is currently hidden and adsorbed by various non-original additions, (e) Full internal and external refurbishment of the original house to re-instate it to its original form, including the reinstatement of the principal historic entrance to the three-bay façade of the Chief Boatman’s house, (f) The construction of a new glazed link and single storey extension to the rear of the main house, (g) The construction of a new glazed link and single storey extension to the rear and side of the existing cottage (former equipment store), (h) Elevational & internal alterations as shown on attached drawings and conservation reports, (i) All associated site & landscaping work including 2 x new wastewater treatment systems (A Protected Structure)