To construct a new dwelling house, site entrance, access road, private on-site wastewater treatment system, private bored well and all associated site works and services
To construct a new dwelling house, site entrance, access road, private on-site wastewater treatment system, private bored well and all associated site works and services
For development, the development will consist of a material change of use from a school, currently not in use to part of new dwelling house, the construction of a new dwelling house onto existing school building with new waste water treatment system with percolation area and associated site works
For development, the development consists of the construction of an extension to existing slatted unit, new straw/machinery store unit and associated site works
To construct an entrance, dwelling house, garage, bored well and wastewater treatment system with soil polishing filter together with all associated site development works and services
To (a) construct a dwelling house and detached garage (b) install an advanced wastewater treatment system with soil polishing filter together with all associated site development works and services
Permission consequent on the grant of outline permission (Reference No. P24/290) to construct a dwelling house, and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associted site works
To construct a new dwelling house, detached domestic garage, wastewater treatment system, percolation area, site entrance and all ancillary site works
To construct a new dwelling house, on-site wastewater treatment system and all associated site works and services
To construct a new dwelling house, site entrance, access road, private on-site wastewater treatment system, private bored well and all associated site works and services
To construct a new dwelling house, entrance, private garage, wastewater treatment system and all associated site works
For the construction of a new dwelling house and garage, complete with a new entrance, boundary wall, sewage treatment system and ancillary works
To RETAIN the following alterations to the dwelling: an extension to the rear and side, first floor area with roof windows, changes to position and size of doors and windows. Also, for retention permission of a detached garage to the rear of the dwelling
Permission consequent on the grant of outline permission (Ref: 21/1394) for the construction of a Dwelling House and Garage, new Site Entrance, Waste Water Treatment System, a bored well and ancillary works
For a Dwelling House and garage, new site entrance, connect to proprietary waste water treatment system, a bored well and carry out all ancillary site works
For the following works (A) Demolish an existing extension and boiler house constructed to the rear of the existing dwelling, (B) Renovate and make changes to the layout and elevations of the existing dwelling (C) Construct new extensions to the front and rear of the existing dwelling, and (D) Use part of the dwelling as a granny flat, all with associated site works
To RETAIN the following: [a] Detached single storey open plan prefabricated unit. [Block A]. [b] Detached single storey prefabricated unit [3 no. meeting rooms - Block B]. [c] Detached single storey toilet building [Block c]. [d] Detached prefabricated dining shelter [Block D]. [e] Revised location of existing septic tank and percolation area. PERMISSION to convert existing detached single storey open plan prefabricated unit [Block A] into sleeping accommodation and associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To RETAIN and complete alteration to the dwelling house. The RETENTION of alterations are: (1.) Windows as installed to front of dwelling house; (2) New entrance door and glazed side panels. As well to RETAIN new site entrance and close off existing site entrance
To demolish existing outbuildings and construct a new dwelling house, new entrance, access road, private garage and install a new wastewater treatment system along with all associated works
To construct dwelling house, garden shed, entrance/exit, ancillary site works, connection to services and subdivision of the existing residential site
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a home gym/wellness building, within the curtilage of the existing house for purposes ancillary to the enjoyment of the house, decommission existing waste water treatment plant and construct new waste water treatment system and percolation area and all ancillary site works necessary to facilitate the proposed development
For RETENTION of a dwelling house with attached garage, treatment unit, access road and all associated site works previously granted under P09/252 on revised site boundaries
For the construction of a slatted unit and loose shed with associated site works
To construct a dwelling house with attached garage, effluent treatment system, new entrance from public road, and all associated site works
The development consists of the construction of a slatted cubicle unit and associated site works
To relocate existing entrance, construct a dwelling house, garage, wastewater treatment system and polishing filter together with all associated site works
For development, the development will consist of a part material change of use from a farm store, currently used as a farm store to a light engineering workshop and associated site works
For the construction of an extension to the rear of an existing dwelling house and carrying out alterations to the existing dwelling along with ancillary works
To construct a dwelling house with attached carport and garage, effluent treatment system, new entrance from public road, and all associated site works
To construct an entrance dwellinghouse, garage, wastewater treatment system and soil polishing filter together with all ancillary site development works and services
Of a) storage of construction material on lands previously used for extraction of quarry stone and b) RETENTION of commercial gate which replaced agricultural gates on lands
Of relocation of site entrance, realigned boundaries, increased elevation height, omission of stone, construction of rear porch and fenestration alterations as constructed from permission granted under P02-635 together with all ancillary site development works and services
For development, the development consist of the construction of a dairy with waste water treatment system with percolation area and associated site works
To alter the design of the dwelling house permitted in P19/319. Alterations include new front, rear side elevations, new internal layout an alteration to ridge level
To RETAIN a dwelling, garage and wastewater treatment system
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
For the construction of a new agricultural site entrance and agricultural roadway and all associated site works
For the construction of a dwelling house garage, a proprietary waste water treatment system and ancillary site works
To Extend the Appropriate Period of Planning Permission for P17/185 to construct dwellinghouse, garage, treatment system and carry out ancillary site works
To demolish extension to rear and porch to front of existing dweling, renovate and change the layout of dwelling, and to construct extension to the dwelling, and to construct extension to the dwelling, all with associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For the demolition of existing substandard dwelling and out-buildings and for permission of the construction of a replacement single storey dwellinghouse with attached garage and proprietary waste treatment plant and upgraded vehicular entrance including ancillary site works
For development, the development consists of the construction of a slatted cubicle unit and associated site works
For proposed change of use and extension of existing garage to residential unit, connection to existing waste water treatment system on site, and associated site works
To construct a two storey dwelling house, access road, wastewater treatment system, percolation area, domestic well and all ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For the construction of a dwelling house, garage/store, a proprietary waste water treatment system and ancillary site works