The construction of a storey and a half style detached dwelling house, detached garage, site entrance, septic tank with waste water treatment system, bored well as water supply, and all associated site servicesDecision record indexed
The construction of a two storey dwelling house, detached garage, septic tank with propietry wastewater treatment system, front entrance, bored well as domestic wastewater supply and associated worksDecision record indexed
The construction of a dwelling house, detached domestic garage, private stables, construction of new entrance and entrance walls, installation of a mechanical aeration unit with polishing filter system with all associated site worksDecision record indexed
The subdivision of an existing plot, construction of a new single storey dwelling, installation of a new packaged wastewater unit with percolation area, entrance, driveway and all associated site works. Retention Permission for existing mobile home for use during construction periodDecision record indexed
Construction of a dormer dwelling house, detached domestic garage, wastewater treatment system, polishing filter, entrance, and all ancillary site worksDecision record indexed
Changes made to their existing house from the design granted planning under planning reference 99/31. Changes include window and door modifications to elevations, roof modification at entrance hall, omission of chimneys, inclusion of covered area below rear deck, and inclusion of lower level storerooms and all ancillary works. Retention permission is also sought for a garage constructed to the rear of the house with adjoining glass houseDecision record indexed
A dormer type dwelling house as constructed; septic tank and percolation area, well and boundary walls and permission for the completion of the worksDecision record indexed
The renovation and construction of extensions to an existing dwelling house; to include an attached domestic garage, decommission of existing septic tank system and to install a new mechanical aeration unit with polishing filter system with all associated site worksDecision record indexed
Construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site worksDecision record indexed
The fill of low lying land with topsoil, subsoil, rock and construction and demolition waste to raise the level of the land for agricultural purposesDecision record indexed
3no. 2 storey dwelling house, garage, domestic waste water treatment system, entrance and associated site works and planning permission for the construction of 3 serviced sites, entrance, access road and associated site worksDecision record indexed
(a) demolition of existing dwelling house due to defective block (b) construct a new dwelling house, (c) decommission existing septic tank and install a new wastewater treatment unit and polishing filter, and (d) all associated site worksDecision record indexed
The construction of a four bedroom two storey dwelling house, packaged wastewater treatment system, domestic garage, front entrance, bored well as domestic water supply and all associated servicesDecision record indexed
Construction of dwelling house, detached garage, new entrance and installation of on-site treatment plant and percolation area together with associated site worksDecision record indexed
Removal of existing conservatory and the construction of a new sun-room in the same position. Retention permission is also sought for conversion of garage to bedroom and en-suite in the existing house, construction of both a stand alone garage with adjoining store and a further stand alone shed to the rear of the propertyDecision record indexed
A dwelling house, waste water treatment system, percolation area, site entrance and all associated site works. Outline Permission Ref. No. 21/902Decision record indexed
A dwelling house, waste water treatment system, percolation area, site entrance and all associated site works. Outline Permission Ref. No. 21/901Decision record indexed
Construction of a dwelling house, detached domestic garage, upgrade existing agricultural entrance to provide new site entrance, septic tank & percolation area and carry out all associated site worksDecision record indexed
The erection of a dwelling house with a septic tank and percolation area and the carrying out of associated site works and servicesDecision record indexed
Construction of a two storey dwelling house, detached garage, entrance, wastewater treatment system, percolation area and associated site worksDecision record indexed
The construction of a dwelling house, detached domestic garage, septic tank and percolation area, vehicular entrance and carry out all associated ancillary site worksDecision record indexed
Construction of a milking parlour building with slatted tank, drafting/collecting yard, flow channel, storage, plant and office and all associated site worksDecision record indexed
Construction of a cubicle shed with slatted tanks, loose shed with feeding area and all associated site works. Demolition of open slurry tank is also requiredDecision record indexed
Construction of a dormer dwelling house, detached domestic garage, wastewater treatment system, sand polishing filter, entrance, and all ancillary site worksDecision record indexed
A dwelling house, waste water treatment system, percolation area, site entrance and all associated site works and planning permission for a detached garage and revised site boundaries. Reference No. of Outline Permission: 21/1264Decision record indexed
An extension to the rear of the dwelling and all ancillary site works. Retention permission is also sought for the conversion of the attached garage to living accommodationDecision record indexed
Construction of a two storey dwelling house, entrance, driveway, domestic garage, wastewater treatment unit, polishing filter and all ancillary site worksDecision record indexed
A new dwelling house, detached garage, site entrance, wastewater treatment system, percolation area and all associated site worksDecision record indexed
Renovation and extension to existing dwelling along with new wastewater treatment system, percolation area, garage and all ancillary site worksDecision record indexed
Construction of a new tractor and tractor lawnmower showroom along with offices, maintenance warehouse, outdoor covered and open sales display area, signage along with new concrete yard and all ancillary site works connected to existing utilities to the rear yardDecision record indexed
Conversion of existing domestic house to office use to include modification, extensions and alterations to same which will also include a 3 phase electrical switch room and generator room with all associated site worksDecision record indexed
Construction of a four bedroom, one and a half storey dwelling house, detached domestic garage, a packaged wastewater treatment system with polishing filter, front entrance and all associated servicesDecision record indexed
The construction of a new dwelling house, entrance, driveway, packaged wastewater treatment system with percolation area and all ancillary site worksDecision record indexed
The (a) Demolition of existing single storey rear and side annex to existing dwelling house and existing outbuildings on site (b) Existing dwelling house to be altered and extended with extension to the rear and side of same to include proposed sub division of overall building to form two dwelling houses (d) existing connection to all public utility services and all associated site worksDecision record indexed
The construction of a new dwelling house, detached garage, entrance, driveway, packaged wastewater unit and percolation area and all ancillary site worksDecision record indexed