Alterations to previous planning application, Ref. SD13B/0117. The alterations will include revisions to the design of the proposed detached dormer dwelling at the rear of the existing dwelling. Proposed alterations are as follows: (1) new roof window and revised door to front elevation; (2) new sliding door to east elevation; (3) new corner window and new door to west elevation; (4) two new corner windows to south elevation; (5) minor changes to the internal layout of the proposed detached dormer dwelling and all associated site works.
Removal of existing flat roof to the side, along with the hipped roof to the side and rear. To be replaced by a ground-floor flat roof extension with an increased height and roof light to the side, as well as a first-floor flat roof extension to the rear (South), also featuring a roof light. Additionally, there will be a single-story ground-floor flat roof extension to the rear (South). The small timber shed in the rear garden will be removed and replaced with a new shed to serve as a home office and gym.
Alterations to existing granted Planning Permission for works at the existing GAA pitch facility (granted Planning Application Reg. Ref. SD22A/0298) at Rathcreedan, Newcastle, Co. Dublin. The subject alterations for which planning permission is sought for are as follows: 1. Addition of 6No. lighting columns, 15m tall pitch lights. 2. Addition of non-illuminated flat board sponsor signage at the north boundary of the pitch area. The extent and location of the signage is defined on the accompanying drawings. All other details remain as per the granted applications Reg. Ref. SD22A/0298.
St. Finians GAA Club, intend to apply for the following retention permission and planning permission at an existing GAA pitch facility at Rathcreedan, Newcastle, Co Dublin. Retention permission is sought for 1,550m2 unmetalled drop-off area/carpark ancillary to the GAA pitch use and planning permission is sought for: GAA pitch goal posts (2No. standard 8m high) coupled with 8m high ballstop nets to the rear of each goal post. Entrance improvements from the existing Newcastle Road (R120) to the site including widening existing gate from 4.2m to 6m with setback gate arrangement to improve sightlines.
Change of use of 4sq.m of warehouse floor area to Staff Facilities floor area at the ground floor plan and minor adjustments to the internal Staff Facilities layout to accommodate Part M requirements (no associated area alterations); elevational changes, addition of 2 level access doors to the building's northern elevation and 2 level access doors to the building's eastern elevation; addition of 1 fire escape door from the ancillary office block to the building's eastern elevation; associated site plan & drainage adjustments.
Construction of 1 warehouse with ancillary office and staff facilities and associated development. The warehouse will have a maximum height of 16 meters with a gross floor area of 22,966sq.m including a warehouse area (21,113sq.m), ancillary office areas (1,163sq.m) and staff facilities (690sq.m); the provision of a new vehicular access to the site from Jordanstown Road including 2 additional access gates from this new road to the existing Site E to the north; pedestrian access; 210 ancillary car parking spaces; bicycle parking; HGV yards; level access goods doors; dock levellers; access gates; hard and soft landscaping; lighting; boundary treatments; ESB substation; plant; extinguishment of the existing vehicular access (farm gate) in lieu of a proposed pedestrian access gate at the southern portion of the site from the R120; and all associated development works above and below ground; all on a site of 5.67 on lands that are bounded to the west by Blocks A - D Jordanstown Road, to the south and east by greenfield lands and to the north by greenfield lands and Block E. The site abuts the R120 Newcastle Village to Rathcoole Road to the south.
Revisions to granted planning permission Reg. Ref. SD06A/0659 (as extended by Reg. Ref. SD06A/0659/EP for a 255 bedroom hotel in a new landmark building consisting of sub-basement and basement, ground floor and five upper floors (with a total hotel development gross floor space of approximately 28,476sq.m.); 680 underground car parking spaces; 5 coach spaces; 50 bicycle spaces; a new 9m wide vehicular, cycleway and pedestrian access approximately 900m in length from a new roundabout on the Newcastle Road (R120) in vicinity of Newcastle Manor housing estate; fire tender access road and site development and landscaping works; revisions to the permitted hotel development (which is partially constructed) will comprise construction of a retirement village in the permitted hotel grounds which will consist of: 69 individual 3 bedroom single storey retirement homes, ranging in size from 112sq.m. to 164.1sq.m; a single storey medical/health centre (146.7sq.m); a two storey community services centre (844.3sq.m); an outdoor recreation and allotment area with an associated recreation equipment store (245sq.m.) and allotment equipment store (22.8sq.m.); a nursing home/care centre to be located within the permitted hotel building necessitating a change of use of part of the hotel's accommodation block (1,653.7sq.m. at ground floor and 2,351.5sq.m. at first floor) from hotel use (comprising 92 hotel bedrooms in total) to nursing home/care centre use (comprising 60 nursing home/care centre bedrooms with associated dining, healthcare and administration facilities) as well as change of use of 302sq.m. at basement level car parking to nursing home/care centre mortuary, deliveries store and clinical waste store and all associated works, including the provision of a new entrance; new 6.4sq.m. porch and a reception area for the nursing home/care centre; new vehicular lay-by and enclosed outdoor areas for nursing home residents (the gross floor space of the hotel incorporating the nursing home/care centre will now be approximately 29,562sq.m.); and site development and landscaping works including revised site levels to facilitate surface drainage, boundary planting including reinstatement of hedgerows; 2.2m to 2.5m high fencing and automatic gates surrounding the retirement homes; a new 2.5m block wall inside the northern boundary of the site and the relocation of 11 car parking spaces at the eastern side of the access road into the development site (serving the adjacent development to the north, Reg. Ref. SD05A/0344) to the western side of the access road. The proposed revised development will have 666 underground car parking spaces, 204 surface car spaces, 5 surface coach spaces, 1 surface ambulance space and 50 bicycle spaces.
Installation of 2No. external non-illuminated lettered signs to the eastern and northern elevations at Unit F, Mountpark Baldonnell.
Installation of 1 no. external permanent site back up generator to the north of the site.
Installation of 1 no. external air handling unit and associated ductwork to existing Unit F.
2 semi-detached, dormer bungalows and all ancillary works on site to rear of existing dwelling.
The amalgamation of two existing industrial buildings (Unit 502B and Unit 502C), including ancillary offices, comprising 1,860 sq.m and 1,929 sq.m respectively, to form a single industrial building comprising 3,789. sq.m, including ancillary offices and b) all associated site works.
A) the Sub-division of the existing single industrial building, including ancillary offices, comprising 3,789 sq.m to form two separate self-contained industrial buildings, including ancillary offices, comprising 1,860 sq.m and 1,929 sq.m and b) all associated site works.
The installation of Photovoltaic Panels (PV) to be mounted on the rooftop of an existing warehouse building. the proposed development includes the provision of 630 kWp of photovotaic solar panels, fixing & mounting systems, inverters, underground cabling and ducting and all associated ancillary infrastructure. PV panels will not extend above parapet line. The installation and operation of the proposed development will facilitate the generation of renewable electricity which will be utilised on - site
Extension to side of existing dwelling and incorporating existing garage in to proposed extension to form independent living unit. Construct new garage and associated site works
Retention for a porta cabin with an area of c. 54sq.m; Retention for mobile home with an area of c. 54sq.m; Retention for installation of electronic gates with a width 10m; Retention for installation of hardstanding / cement yard with an area of c. 1,020sq.m.
(i) The continued seasonal use of land/farm sheds associated with family entertainment events to be held at Christmas, Easter and Halloween. The dates for such use sought will recur annually between 14th March - 25th April, 24th - 31st October and 24th November to 23rd December. (ii) 3 no. temporary signs located at the entrance, (iii) 2 no. containers with covered area, (iv) 4 no. single storey portaloo toilets, (v) 4 no. single storey portacabins, (vi) Festoon lighting set 10 to 15 metres apart and (vii) Provision of 99 car parking spaces in total including 2 accessible spaces, 94 visitor spaces and 3 staff spaces. All of the above works are temporary and removable. Limited site enabling works are also proposed. The existing entrance accessing Lugg Woods from Slade Road will provide vehicular access for the public.
The construction of a new one-bedroom single storey timber frame dwelling to the Northwest of the rear garden. ii). Alterations to existing site entrance to facilitate visibility lines. iii). Connection to existing foul sewer. iv). All associated site works and landscaping.
Single storey extension to the side and rear comprising of additional bedrooms and living space.
Planning permission for a new single storey extension, comprising toilet, sitting room, gym and storage, to side and rear of the existing house with all associated ancillary works
Retention planning permission for 2 storey extension to rear of existing house, a single storey garage to side of existing house with associated ancillary works.
Change of use from aparthotel to restaurant, together with external signage and all associated site works.
A development consisting of the construction of a Proposed Agricultural Storage Shed, total area 70m², includes 6 no. Roof-lights and shall include all associated site works.
Proposed partial ground floor front extension with bay window & pitched roof over to existing bungalow
The development will consist of Retention Permission sought for widening of entrances, Laying of hard standing over grassland plus permission for the construction of a storey and half dwelling plus a detached domestic garage. A domestic waste water system plus a surface water soakaway and all associated site works.
Retention Permission sought for widening of entrances, laying of hard standing over grassland plus permission for the construction of a storey and a half dwelling plus a dethatched domestic garage, a domestic waste water treatment system plus a surface water soakaway and all associated site works.
The development amends a permitted warehouse development (as granted under SDCC Reg. Ref. SD19A/0264 and SDCC Reg. Ref. SD21A/0276). Retention permission is sought for the following modifications: the provision of 3 No. gas tanks (c. 1.5 metres high) with associated fencing to the north of the site, resulting in the omission of 6 No. permitted HGV spaces; the addition of a sprinkler tank (c. 29 sq m) and pump room (c. 31 sq m) to the north-west of the site; the provision of entrance and wayfinding signage as follows: 2 No. signs at the northern entrance along the eastern boundary (1 metre high) and 2 No. signs at the southern entrance along the eastern boundary (1 metre high); 2 No. signs on the northern elevation of the constructed warehouse (3.9 metres high and 1 metre high); and 2 No. signs on the eastern elevation of the constructed warehouse (3.9 metres high and 1 metre high); boundary treatments; and all associated development works above and below ground. The proposed development amendments will principally consist of: the provision of crash protection barriers (c. 1.1 metres high) to the south, east and west of the constructed gas tanks; and all associated development works above and below ground.
Amendment to SDCC REF. SD19A/0264 comprising the omission of the 33 permitted Photovoltaic (PV) Solar Panels (53sq.m) to the ancillary office roof; provision of 400 Photovoltaic (PV) Solar Panels (717sq.m) to the warehouse roof; provision of an amended access arrangement including pedestrian and cyclist infrastructure to the staff/visitor carpark with the provision of an inter-com/FOB access point, central concrete aisle and gates; omission of 1 permitted car parking space (reducing the quantum of car parking from 152 to 151 spaces); the provision of 2 sections of strip window glazing to the northern elevation of the warehouse (each 37.4m in length and 1m in height); the provision of a soft surface outdoor exercise area; boundary treatments and all associated development works above and below ground.
Demolition of existing single storey detached garage and construction of a two storey hipped roof extension to the front and side of existing two storey semi-detached dwelling with associated changes to all existing elevations; extension to consist of additional ground floor living space, toilet and bin stores and an additional first floor bedroom with en-suite toilet along with all ancillary site works.
A\(I) the provision of a waste transfer station facility for the storage and transfer of non-hazardous waste. The proposed facility includes: (a) construction of a two-storey office building with staff facilities, served by 55 no. car parking spaces (inclusive of 2 no. accessible parking spaces), and accessed via the existing entrance in the southern portion of the site, along the western site boundary. (b) provision of an internal one-way road in the central portion of the site, accessible from the existing entrance, located centrally along the western site boundary; (c) provision of waste storage areas in the central portion of the site, together with van/trailer parking spaces, 2 no. storage containers and 2 no. HVO tanks; (d) provision of waste storage area in northern portion of the site; (e) provision of an internal one-way road in the northern portion of the site comprising a compacted permeable hardcore surface, accessed via the existing entrance at the northern end of the site, along the western site boundary. The northern internal road will also include a weighbridge and adjacent waste storage bays. The proposal is also inclusive of (ii) landscaping, boundary treatments pedestrian paths, drainage, and all associated site development and ancillary works necessary to facilitate the development at lands on Jordanstown View (to the south of the Unipharm Group Premises), Greenough Business Park, Rathcoole, Co. Dublin. This activity will be applied for with a New Waste Facility Permit Application, under the Waste Management (Facility Permit and Registration) Regulations 2007 as amended.
Change of use for the ground floor of the existing two storey Public House Block D (disused/vacant) and the ground floor of the proposed Block C. The application seeks modifications to Block C and Block D of the previously granted permission SDCC Reg. Ref. SD18A/0202. Block C comprised a 3 storey building accommodating 2 no. retail units on the ground floor and 6 no. apartments (5 no. 2 bedroom and 1 no. 1 bedroom) across the first and second floor. Block D comprised refurbishment, alteration and extension of a 2 storey existing Public House building to accommodate 1 no. commercial office unit on ground floor and 1 no. 2 bed apartment on the first floor along with a new bin/bike store at the rear. The modifications seek a change of use from previously granted retail/commercial use to residential use to provide an additional 4 no. 2 bedroom apartment units on the ground floor of Blocks C & D. The proposed works to Block C include a change of external material finishes and replacing the glazing of retail units with windows for the proposed apartment units on the ground floor to accommodate 3 no. 2 bedroom apartments accessed through entrance corridor. The proposed works to Block D include removing the existing doors/windows and replacing them with new doors/windows to match the existing to accommodate 1 no. 2 bedroom apartment on the ground floor of the existing two storey former Public House. All with associated bin store, bicycle store and associated site works.
Mixed use development will consist of 28 residential units(comprising 1-1 bed units; 16 2-bed units and 11 3-bed units (including terraces and balconies) an office unit (100sq.m), 2 retail units (87sq.m and 154sq.m), ancillary bin stores (16sq.m) and bike storage area (29sq.m) across 4 blocks (Blocks A to D); the breakdown for the individual Blocks is as follows: Block A (3 storeys (1,497sq.m), 7 apartments and 7 duplex apartments; Block B (3 storeys (851sq.m) 4 apartments and 4 duplex apartments; Block C (3 storeys (777sq.m), 6 apartments and 2 retail units and Block D (2 storey (243sq.m), the refurbishment, alteration and extension of the existing 2 storey former public house (including the demolition of a 3sq.m rear lean-to) and its change of use to 1 office unit and 1 apartment with new bin stores and bike store to the rear. The provision of private open space, communal and public open space; surface car parking (30 spaces); all hard and soft landscaping including boundary treatments; SUDS measures including attenuation tanks; PV panels; changes to levels and all other associated site excavation and site development works above and below ground. Vehicular access will be form Pairc Mhuire to the south. The existing perpendicular public parking on the north side of Pairc Mhuire will be replaced with 4 perpendicular car parking spaces on Pairc Mhuire and 2 parallel car parking spaces on the eastern side of Boherboy Road. The site is bounded by Main Street to the north, public open space to the east, Pairc Mhuire to the south and Boherboy Road to the west. it previously accommodated a petrol filling station and a public house (part of which remains on site).
Retention of change of use from use as a warehouse/light industrial unit to use for the sale and storage of vehicles and service workshop (170.5 sqm)
Provision of an electronic gate.
The Construction of 2 no. 6.50m wide X 3.0m high digital advertising panels (arranged in a V plan 6.50 meters from ground to top of structure) with a 250mm frame all around each
The proposed development consists of the construction of a dormer attic extension by converting the existing attic space for habitation, comprising of 1 no. bedroom, 1 no. en-suite and 1 no. wardrobe. The development will include alterations to the rear elevation, provision of cladding finish to the dormer exterior, and internal alterations to the existing first floor to facilitate access to the attic level.
The proposed development consists of the construction of 2 no. 3-bedroom semi-detached dwellings with private rear gardens, situated to the rear/side of the existing dwelling. The proposed +development also includes the removal of the existing front garden wall, provision of additional car parking spaces, landscaping, boundary treatments, drainage connected to existing services and all associated site works necessary to facilitate the development.
Permission for development on a site of 6.7ha. The proposed development will consist of the construction of a Photovoltaic Solar development to the North of the Citywest hotel on lands formally in use as a golf course [comprising a change of use from former golf course to solar development]. The proposed development will include the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures, underground cabling and ducting, security fencing, CCTV cameras, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of two modified shipping containers, containing 3 inverters and LV Switch gear. This compound will also accommodate the Battery Energy Storage system, PV inverter and a transformer. The proposed development includes the above as well as drainage, landscaping, bio-diversity enhancement measures and all other associated site excavation, infrastructural and site development works above and below ground. While the proposed development relates to a total site area of 6.7ha, c.3.5ha of this constitutes the actual land take post development. The operational lifespan of the solar PV development will be 30 years. A Natura Impact statement (NIS) accompanies the planning application.
Top floor roof window to front of 3 storey dwelling.
For demolishing of existing extension to rear & provision of new entrance & porch to front. Construction of one two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property
(A) Construction of 1no. two storey, end of terrace 2-bedroom dwelling (76sqm) with new vehicular entrance off road. (B) All associated site development, landscaping and drainage works to facilitate the development; ancillary works for foul water to public drainage system and provision of surface water soakaway to meet BRE Digest 365 standards for the new dwelling.
Permission for demolishing of extension to rear and provision of new entrance and porch to front. Construction of one, two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property.
Move entrance & demolish existing extension to rear; construction of 1 two storey, three bedroom dwelling to adjoin existing property.
Electric Vehicle Charging Station consisting of 5 EV charging stations, each serving 2 vehicle charging bays, a total of 10 charging points, 2 x 4 bay canopy structures incorporate circa. 84sq.m of roof mounted solar panels; The proposed development also incorporates 1 ESB substation, the use of an existing point of access / egress and all associated above and below ground ancillary works.
11 residential units consisting of (i) 4 three bed duplex apartments above 4 two bed duplex apartments in a three storey building; (ii) 3 two storey terrace houses (1 three bedroom and 2 four bedroom); communal open space; surface parking; bin and bicycle storage and all ancillary site development works at a site bordered by the R120 to the north, Newcastle Boulevard to the west, Ballynakelly Green to the south and Ballynakelly View to the east.
Construction of a detached pitched roofed two storey dwelling house with a single storey pitched roofed entrance porch to the front on part of the front, side and rear garden including the demolition of existing detached storage out-buildings and changes to boundary treatments affecting the existing, including proposed new pedestrian and vehicular entrances to service the proposed dwelling and a new vehicular entrance to replace the existing to service the existing dwelling.
Single storey extension to front and side of house, new bedroom and lounge facility, planning retention also sought for attic conversion with projecting dormer window to rear roof and all associated site works.
Construction of two storey extension (55sq.m) with dormer windows to the side of existing dwelling; internal modifications to the existing structure and all associated site works.
Construction of 1 two bedroom, single storey detached short let self-catering tourist accommodation Unit A; 2 two bedroom single storey, semi-detached short let self-catering tourist accommodation Unit B; use of the existing two bedroom bungalow as caretaker residential accommodation and all ancillary landscape and site services works.
Proposed 250sqm (16445mm high above yard level) ancillary fridge extension to the existing Northern (Front) Elevation of the existing warehouse building. All finishes to match the existing building.