New agricultural entrance
New dwelling, use of existing entrance, effluent disposal system to current EPA standards, Bored Wel, together with ancillary works
A new dwelling, garage, blocking up existing entrance and installing a new entrance on to the public road, waste water treatment unit, soil polishing filter, new well and associated works
The demolition of the existing dwelling and pump house on site and construction of a new replacement dwelling, new wastewater system & polishing filter, new well and associated works
Deposition of soil and stone over an area of c.2.0 ha for the purposes of land improvement with an agricultural end use
Material change of use of part of farmyard and part of shed for operation of firewood cutting, bagging, storage and loading firewood for delivery off site and associated works
Dwelling, garage, well, effluent treatment system, provision of new entrance and associated works
Dwelling, garage, well, effluent treatment system, removal of existing entrance, provision of new entrance and associated works
Consists of the continuation of use of an existing Waste Recycling Facility (previously approved under planning reg ref 12/6015 and 16/1434) to include acceptance, recovery and recycling of construction and demolition waste by crushing and screening of soils, stone, concrete and tarmacadam materials with a maximum annual throughput of 25,000 tonnes per annum. Permission is also sought for the continued use of mobile crushing and screening plant, stockpile areas, skip storage area, portable office and chemical toilet, and wheelwash and all ancillary activities necessary for the continuation of use of the development. The continued use of development will be subject to a waste facility permit
Construct an indoor horse arena including 2 no. stables, tack room & storage room with all associated site works in existing farmyard
Change of house type to that granted under planning ref 21/1233 and associate works
An art & hobby room
Construction of a new dwelling, wastewater treatment unit and polishing filter, new well, new entrance onto public road and associate works
Bungalow, detached domestic garage, effluent treatment system in accordance with EPA 2009, and associated site works
Conversion of part of out buildings to a 2-bedroom apartment
Sewage treatment system and percolation area
The construction of a new dwelling, domestic garage, wastewater treatment unit & polishing filter, new well, new entrance onto public road and associate works
Construction of two holiday homes, connection to existing effluent unit, together with all associated site works
Conversation of attic space for storage use, including the construction of dormer window to the front (East) roof slope of an existing chalet bungalow
A 198 sqm forestry storage shed, new septic tank and percolation area, new well, upgrading of existing entrance and associate works
(1) Two storey extension to rear of existing house. (2) New porch & rooflight to front elevation. (3) New high-level windows at first floor level to south elevation of existing house. (4) Alterations to existing window openings to front & rear elevations. (5) New septic tank & percolation area in new location
Use existing entrance and create a new driveway and for the construction of a bungalow and a new effluent treatment system to current EPA standards and all ancillary site works
Change of house type to previously granted permission 22/224, to construct a garage and change of position of house on site and all associated site works
1. 2 No. 20ft shipping containers. To be kept on site for the duration of the construction phase; 2. temporary security fencing (Heras fencing) to be kept on site for the duration of the construction phase; Permission to 1. erect a single storey (147.30 sq.m floor area) machine store with a ridge height not exceeding 4.9m high; 2. erect 1.8m High Paladin perimeter fencing and entrance gates and perimeter hedgerow; 3. Bally Lusk stone driveway or similar approved stone; 4. and planning permission is also sought to remove condition number 2 granted under planning permission register reference number 21/961
Bungalow, detached domestic garage, effluent treatment system in accordance with EPA 2009 and associated site works
Split-level dwelling with garage using the existing entrance and driveway and for a new effluent treatment system to current EPA standards and all ancillary site works
233 sqm single storey dwelling, 48 sqm single storey garage, vehicular entrance via existing agricultural entrance, bored well, effluent disposal system to current EPA standards, all associated ancillary site development works
Dwelling, an effluent disposal system and associated site works
The construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto existing entrance of laneway which leads to the public road, upgrading existing entrance onto public road and associate works
Revised house type with an adjoining garage, together with minor revisions to site layout from that as previously granted under PRR 21/728 together with connection to effluent treatment system as granted under PRR 21/728, all together with associated site works
Proposed new waste water treatment system to EPA standards to serve existing dwelling and associated works
Construction of a new dwelling, wastewater treatment unit and polishing filter, new well, new entrance onto public road and associate works
Dwelling, garage, waste water treatment system to EPA standards, new entrance and associated site works
Proposed change of use (the removal of condition 2(a) of planning register reference 01/5292) from restricted use as a dwelling to use by all classes of persons
Dwelling, garage and effluent treatment system, all together with associated site works
Side entrance to the garden of The Lodge
As constructed garage and location of effluent treatment unit
Rear extension as built to existing dwelling, porch as built to side of existing dwelling, new window to side of existing dwelling and Permission for removal of existing septic tank and installation of new wastewater treatment unit and polishing filter and associate works
Dwelling with garage, waste water treatment system to EPA standards, new entrance and associated works
Agricultural entrance and all associated site works
To demolish an existing derelict dwelling and existing outhouses and permission for a replacement dwelling, a revised entrance, a garage/car port and a packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards this all together with required site and development works
Single storey conservatory extension to the side and a two-storey extension to the rear of our home. Permission to: a) demolish our existing garage and replace with a new garage and domestic workshop in the same location, and b) to build a new home office and gym in the rear garden c) construct a ground mounted 20 panel (30sqm) photovoltaic array in the rear garden d) along with all associated site works. Clara House is a protected structure
A dwelling and garage with services along with all associated site development works
Removal of existing wastewater system, installation of new wastewater treatment unit and soil polishing filter to current standards and associate works
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Single storey timber clad cabin. Planning permission for waste water treatment system all with associated ancillary works
Construction of a new single storey dwelling, wastewater treatment system, bored well & all associated site works
(i) a new entrance (ii) existing entrance to be closed and made obsolete (iii) the importation of material to in-fill and re-contour the subject site, and all associated site development works. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243 tonnes to fill Phase 2, 28,596 tonnes to fill Phase 3, and 28,596tonnes to fill Phase 4, equating to a total of 123,987tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
An extension to existing dwelling and associated site works
Change of use (removal of planning condition no. 3 of planning ref. no. 04/113) from restricted use as a dwelling to use by all classes of persons