For the erection of a mural on the east-facing gable end of the premises formerly known as 'Maire Rua' Craft shop V95 W0HA. The development will consist of a public mural approximately 7m x 5m in scale and comprise work by a professional artist
For retention permission for use of the ground floor retail unit as a childcare facility
To construct/install a structure for the serving food/beverages ancillary to the existing Doolin Inn complex along with associated site works
To Extend the Appropriate Period of Planning permission for P21/470 for demolition of existing dwelling and construction of new two storey dwelling with integral garage and associated landscaping
For demolition of existing dwelling and construction of new two storey dwelling with integral garage and associated landscaping
To renovate an existing vacant building and to construct an extension to the rear. Construct new divisional boundary wall to the East, demolish existing outbuildings, provide new gated entrance in existing front wall and build up existing, and carry out all ancillary site works
To demolish the existing rear extension, extend the existing house, upgrade the wastewater treatment system & all other associated site and ancillary works
The development will consist of the construction of an 18 metre-high free-standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network
To construct a dwelling with on-site wastewater treatment, a new entrance and ancillary works
For the development which will consist of a front porch extension, a rear utility extension and a side conservatory extension to the existing dwelling house together with ancillary site works
Of the following: 1. dining room conservatory and extension to the ground floor B&B bedroom both to the rear of the dwelling, 2. the first floor B&B bedroom suite, 3. the changes to the external appearance of the dwelling, which differ to those granted under Planning Permission P99/1763 & all other associated site and ancillary works
Of the revised boundaries, which differ those previously granted under Ref 01/263
Of the garage and dwelling house on site, which are larger than those granted under Reference P08/474, the revised site boundaries, the detached office & all other associated site and ancillary works
To construct a home office & gym to the rear / side of the existing dwelling house and all associated site works
To revise part of front elevation, to convert part of storage area to gift stall, and to relocate exit to proposed smoking area
For the construction of an extension to existing dwelling house, new boundary wall and entrance, internal and elevation alterations to existing house and all ancillary site works
For a dwelling house with attic accommodation, shed/workshop, vehicular entrance, connection to services, septic tank, reed bed treatment systems and willow-planted distribution area and ancillary site works
To extend an existing agricultural machinery sales & storage shed and to construct a new agricultural machinery sales & storage shed and all associated site works
To install a 6m extension to an existing 20m lattice telecommunications support structure carrying telecommunications equipment, together with associated equipment and cabinets enclosed within an existing 2.4m palisade fence compound
To construct a dwelling house and garage, with effluent treatment system, accessed by means of an existing agricultural entrance from the public road, all with associated site works
For (a) modifications to an existing dwelling (b) a single storey extension to the side of the existing dwelling and all ancillary site works
Of the existing timber chalet for short-term letting ancillary to the existing music studio together with ancillary site works
A) retention of existing site entrance b) permission to alter site boundaries to match Land Registry boundaries together with ancillary site works
For development which will consist of; a) replacement and change of use of existing derelict sheds to provide 5 No. artist studio spaces b) reconstruction, extension and change of use of existing haybarn and lean-to to provide a main studio space with kitchenette, dining area and w.c. and c) replacement of existing substandard septic tank with a proprietary wastewater treatment system and soil polishing filter together with ancillary site works
For a proposed private dwelling house, new site entrance, waste water treatment system and all associated site works
For development, the development consists of the construction of a slatted unit and associated site works
For development, the development consists of the construction of a calving unit and associated site works
For the development of a dwelling house with septic tank and percolation area together with ancillary site works
For proposed private dwelling house, detached garage, new site entrance, waste water treatment system all associated site works
To construct a single storey extension to the existing dwelling house, with all associated site works
To demolish part of existing house, restore remainder of existing house, construct new addition, a proprietary waste treatment system and all associated site works
Of A) machinery shed B) livestock slatted shed, external crush and dungstead & associated works C) PERMISSION for agricultural livestock shed with internal feeding and handling facilities and underground slatted slurry storage tanks & all associated siteworks
For the construction of a dwelling house and garage with proprietary wastewater treatment system, sand polishing filter and percolation area together with ancillary site works
To demolish a sub-standard cottage and its replacement with a new residential farmhouse including a new wastewater treatment system and ancillary groundwork
RETAIN changes made to the layout and elevations, including increasing the roof height of the existing dwelling, accessed by means of a shared entrance and driveway from the public road, all with associated site works
For the construction of a new single storey extension to the side of an existing dwelling and all ancillary site works
For the development which will consist of three single storey extensions of 36.0sqM, 6.4sqM and 3.4sqm to front, side and rear of the existing dwelling, with site works.
To construct a new dwelling house, install a wastewater treatment system & all other associated site and ancillary works
To RETAIN partial demolition of the existing building on site and PERMISSION to demolish remaining walls along with sheds and to construct a new two storey dwelling house, relocate existing vehicular entrance and all associated site works
To extend and renovate the existing dwelling, upgrade the existing septic tank with a wastewater treatment system & all other associated site and ancillary works
To construct a new dwelling house, install a wastewater treatment system & all associated site and ancillary works
To build a new dwellinghouse, install a wastewater treatment system and all other associated site and ancillary works
To build a new dwelling, install a wastewater treatment system and all associated site and ancillary works.
The development will consist of front, rear and side extensions to existing dwelling house together with ancillary site works
For an extension to an existing dwelling house together with associated site works
Is sought to alter, extend and refurbish existing 'herdsman hut" dwelling house, alter existing site entrance, install treatment system including all ancillary site works
For development which will consist of the construction of a single storey dwelling house, a proprietary waste water treatment system and ancillary site works
The development will consist of the construction of a domestic garage with first floor storage together with ancillary site works
For change of use of the existing office to domestic use & extend the building, install a waste water treatment system & all other associated site & ancillary works
To construct a private garage/shed along with ancillary site works