(1) Demolition of the existing shed (2) Provision of a two-storey pitched roof extension to the rear of the existing house including the provision of rooflights (3)Internal alterations to the existing house (4) Removal of the existing septic tank (5) Provision of a new septic tank and trenched percolation area to the rear of the site (6) Associated alterations to all elevationsDecision record indexed
Installation of a 40ft metal shipping container with 3.2m high earth mounding to all sides for the safe and secure storage of pyrotechnics (class 1 hazardous goods) along with a 4m2 timber packing shed and all associated site development worksGrounds not yet categorised
Installation of a 40ft metal shipping container with 3.2m high earth mounding to all sides for the safe and secure storage of pyrotechnics (class 1 hazardous goods) along with a 4m2 timber packing shed for the packing and unpacking of pyrotechnics, underground fire water storage tanks, security fencing and all associated site development worksGrounds not yet categorised
Construction of: (1) a new dairy cow road underpass with new farm roadways, (2) a new milking parlour with dairy and dafting area, (3) a new open collecting yard with an external slatted tank, (4) a new meal bin, (5) a new pipeline to the existing geo-membrane lined slurry store, (6) a new concrete apron, (7) removal of the existing horse sand arena wooden fence, (8) removal of the existing external milk cooling tank, (9) decommission of the existing milking parlour and collecting yard, (10) removal of the existing farm entrance side walls and hedges to create wider farm entrance and for a setback of the western roadside hedge to provide sufficient sightlines on both sides, (11) all associated site development worksGrounds not yet categorised
(A) Modifications to existing entrance to improve sightlines. (B) Construction of an agricultural building to include cubicles and underground slatted slurry tank. (C) Construction of an agricultural building to include milking parlour, livestock handling facilities, waiting yard, underground slatted slurry tank, dairy and ancillary rooms. (D) Construction of an underground rainwater harvesting tank. (E) Erection of a Meal Bin, Water Tank and all associated site worksDecision record indexed
An existing single storey extension, domestic garage and sheds ancillary to the dwelling along with retention of a gated boundary opening. Planning permission is also being sought for the replacement of the existing septic tank system with a new wastewater treatment unit along with all ancillary site worksDecision record indexed
Construction of: (1) a new dairy cow road underpass with soiled water sump tank with new farm roadways, (2) a new milking parlour with dairy, drafting area and covered collecting yard with an internal precast concrete slatted channel, (3) a new underground precast concrete covered channel connected to the existing channel to discharge slurry to the existing geo-membrane lined slurry store, (4) a new meal bin, (5) a new concrete apron, (6) removal of the existing horse sand arena wooden fence, (7) removal of the existing external milk cooling tank, (8) decommission of the existing milking parlour and collecting yard, (9) removal of the existing farm entrance side walls and hedges to create wider farm entrance and for a setback of the western roadside hedge to provide sufficient sightlines on both sides, and (10) retention permission for the existing geo-membrane lined slurry store (11) and all associated site development worksDecision record indexed
A dormer bungalow with onsite waste-water treatment and percolation area including driveway, bore well, improvements to existing entrance, landscaping and boundary treatment and ancillary worksGrounds not yet categorised