To (a) demolish a conservatory / rear hallway, bay window, dormer, chimney, mansard roof and garage (b) to construct a second storey extension to the rear, single storey extension to the rear, porch to the front and new garage (c) elevation changes with all associated site works
For development at Dromoland Castle and Estate, (Dromoland Castle is a Protected Structure: RPS No. 278). The development will consist of: the demolition of the 20th century / non-original infill structures at the castle courtyard and the construction of a glazed roof structure (max height c.11m) to provide additional internal guest recreation / dining space for guests (c.300sqm additional floor area); Demolition of existing part one/part two element and the construction of a part three/part four storey extension to the existing 21st century castle's east wing to provide additional guest accommodation, resulting in the loss of 1 No. existing guest room and an additional 17 No. guest rooms, resulting in a net gain of 16 No. rooms within this part of the castle. Internal upgrades and reconfiguration to the castle's ground floor, resulting in a consolidated kitchen / back of house area and improved and extended guest dining and bar facilities, installation of new lift, alterations to ancillary facilities and loss of 3 No. existing guest bedrooms. Internal upgrades and reconfiguration at the castle's lower ground floor level, to provide additional bar space, kitchen facilities, the upgrade of existing spa areas together with the introduction of new wet spa facilities, all resulting in the loss of back of house space and 1 No. guest bedroom. Removal of existing deck and canopy and the extension of the existing clubhouse building through the reinstatement of the former orangery building to provide a guest restaurant / event space; Alteration and change of use of existing farm structures from agricultural to a golf maintenance facility and central delivery and procurement hub for the estate, including staff car parking to provide 11 No. spaces, including accessible spaces and EV charging spaces; and the provision of new / formalised car park to serve the Castle guests and Brian Boru Hall (event facilities) to provide 85 No. spaces, including accessible spaces and EV charging spaces. The proposed development will also comprise all ancillary landscaping and boundary treatment works, site services, wayfinding, site lighting, and all other associated site excavation, construction compound, infrastructural and site development works. The planning application includes a Natura Impact Statement
To construct a two storey dwelling house, waste water treatment system and all ancillary and associated site and ground works
For the improvement works to Killoo Graveyard to comprise of, (a) construct new gravelled pedestrian walkway adjacent to south wall of existing entrance, (b) construct new gated entrance to west wall of graveyard, (c) provide three new agricultural gates, (d) construct new wrought iron fencing to north side of both existing entrance and proposed new pedestrian access, (e) to construct pedestrian access turnstiles at existing entranceway and self-closing gates at new pedestrian access (f) to create new legal right-of way over proposed new pedestrian access and extinguish existing right-of-way through centre of field including ancillary siteworks
To construct dwelling house, garage, and treatment system and carry out ancillary site works
Permission consequent on the grant of outline permission ref: P21/1323 to construct dwelling house, garage, treatment system and carry out ancillary site works
To retain and complete two storey extension to the side of the dwelling on which construction has commenced, and which differs to that granted under existing permission P25-192, all with associated site works
To demolish an existing shed, make changes to the layout and elevations of the existing dwelling, construct a two storey extension to the side and an open porch detail to the front of the dwelling, construct a detached garage, and to install a replacement effluent treatment system, all with associated site works
Of (a) 'as constructed existing' dwelling house i.e. (P8/13134) (b) 'change of use' of attached garage from previous domestic garage use to ancillary granny flat accommodation. (c)all ancillary site works and services
For (1) RETENTION of (a) family room rear extension (b) side patio roof covering (c) stone cladding to part of previously approved extension under PR-0271 (2) PERMISSION for development which will consist of alterations and a single storey extension including ancillary site works
To demolish an existing Industrial building and associated works on site and to construct a dwelling house and garage, with effluent treatment system, with all associated site works
To construct a new dwelling house with attached carport and private garage, site entrance, access road, on-site wastewater treatment system and all other associated site works
For development which will consist of the following, (1) The relocation and extension of the existing first level retail outlet into an existing enclosed courtyard (2) A new yoga-meditation at the lower floor level in the existing courtyard (3) Minor alterations to existing internal walls and layout (4) Ancillary site works (The development is proposed within the existing hotel complex a protected structure Dromoland Castle, Dromoland)
For development which will consist of the construction of a dwelling house with garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of a revised dwelling house with garage design, to that previously approved under planning ref. P20-334
To (a) change design of private dwelling house and garage and (b) relocate proposed wastewater treatment system and percolation area as previously granted under Planning Register Reference P17-647, connect to existing infrastructure services and all associated site works
Of (a) 5 no. Velux windows in rear roof & dormer window in lieu of Velux stipulated by condition 2 of grant of planning reference P04/2183 (b) increased ridge height on dwelling and use of attic space for office/games room & (c) alterations to fenestration and height of the garage granted under planning reference P06/1991 and other associated site and ancillary works
Of rear extension to dwelling house previously granted permission under planning reference P04-1799 including all associated site works and services
To construct an entrance, dwelling house, garage, wastewater treatment system with soil polishing filter together with all associated site development works and services
To construct a vintage truck / storage shed together with all ancillary site development works and services
To RETAIN the construction of lean- to extension to side of garage & extension to rear of garage to include roof area, boiler house, balcony and retention permission for alteration of position of treatment plant and percolation from that approved under P03-1728, including ancillary site works.
Development of Public Footway, Pedestrian Crossing, Street Lighting, Line marking, Signage, Drainage works and all other associated site works
To alter the fenestration to the existing dwelling, replace the existing extension to the rear with a new extension and all other associated site and ancillary works
The development will consist of: Permission for conversion of the existing garage into a 1 no. single-occupancy communal dwelling unit. Works include internal alterations to provide living, dining, and bathroom facilities for persons with intellectual or physical disabilities, along with modifications to external elevations and all associated site works. The proposed unit will have a gross floor area of 42 sqm and will be located on the ground floor of the existing main residential care unit. RETENTION Permission for an already installed wastewater treatment system and sand polishing filter, including all associated site works
For an entrance, single storey dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works
For the development which will consist of a new guest carpark including petrol interceptor, surface water attenuation tank, connection to existing surface water drainage system, carpark lighting and ancillary site works (The development is proposed within the curtilage of a protected structure Dromoland Castle, Dromoland)
For the construction of a dwelling house, garage, wastewater treatment system and new entrance including ancillary site works
For the construction of two single-storey extensions, including all associated site works.
For development at Dromoland Castle and Estate, Dromoland, Newmarket-on-Fergus, Co. Clare (Dromoland Castle is a Protected Structure: RPS No. 278). The development consists of:- The demolition of existing golf maintenance shed and the renovation and conversion of the existing stables building from golf storage/maintenance to visitor accommodation to provide 13 no. rooms/ suites, including an integrated bat loft, removal of solar panels, alterations to roof and openings, including installation of new and replacement doors, windows, gates, rooflights, infill wall sections, internal alterations and associated landscape works. - The renovation and conversion of the existing ‘Gardener’s Cottage’ from staff accommodation to visitor accommodation, including removal of existing storage shed, removal of existing rear lean to extension and replacement with two storey extension, new storage shed, internal alterations to provide a 4 no. bedroom guest house, 1 no. car parking space and associated landscape works. - Alteration and extension of existing clubhouse building to provide an enhanced wellness area and associated facilities, including replacement and extension of external deck to rear (south) with single storey timber spa structure, single storey extension to front (north) elevation, together internal alterations. - Installation of 3 no. sauna huts on lake island accessed via existing bridge, including raised timber walkways and floating timber jetties with plunge pools; - The provision of a new formal staff car park to the south of the stables building to provide 61 no. spaces, including accessible and EV charging spaces; - The provision of new/formalised car park to serve Brian Boru Hall (event facilities) to provide 21 no. spaces, including accessible spaces; and - Alterations to the existing stables car park resulting in a reduction of 4 no. spaces (36 no. spaces remaining), including accessible spaces; and - The provision of new/ formalised car park to serve the club house/ wellness centre to provide 10 no. spaces, including an accessible space. The proposed development will also comprise all ancillary landscaping and boundary treatment works, bicycle parking, biodiversity enhancement measures, wayfinding/ signage, site services, site lighting, construction compound, and all other associated site excavation, infrastructural and site development works. The planning application includes a Natura Impact Statement
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
To renovate and extend existing private dwelling house, construct detached garage and all associated site works
For development which will consist of (a) single storey extensions to the rear of the existing dwelling, (b) alterations to elevations of the dwelling, detached boathouse & detached garage including a new canopy at the front entrance & rooflight over the stairs; (c) the change of use of the existing detached boathouse to use as a wellness suite and home office; (d) a new wastewater treatment system and percolation area; (e) all associated site and landscaping works to serve the development
To demolish existing garage and construct an extension to the side of the existing house along with alterations to existing house and associated site works
For (a) to demolish an existing garage, (b) To construct a single storey side extension and (c) Elevation changes with all associated site works
Of a)modifications and extensions to private dwelinghouse / garage/ boiler house b)site boundaries / site layout as constructed c)PERMISSION to upgrade existing sewage treatment system along with all associated site works and services
To construct single dwelling house with garage, wastewater treatment and percolation area, all associated site works and connections to services and new entrance from public road
The development will consist of conversion of domestic garage to habitable accommodation together with extension and alterations to existing dwelling house and associated site works
To demolish agricultural structure and to construct a slatted cattle shed and associated site works
To construct dwelling house, advanced treatment system, widen existing entrance to public road and carry out ancillary site works
To construct a storage shed together with ancillary site development works and services
To construct a new dwelling installation of a wastewater treatment system & all other associated site and ancillary works
For development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works
For the expansion and redevelopment of the Clare GAA Centre of Excellence facility and all ancillary site works. The proposed development includes (i) The construction of a 1-2 storey extension to the existing Clare GAA Centre of Excellence building accommodating additional player welfare facilities including new dressing rooms, a gymnasium, dining and administrative areas. (ii) A new equipment store building (iii) 2 no. new full length playing pitches (Pitch Nos 5 and 6). (iv) The construction of a new all-weather synthetic playing pitch served by 6 no. 25 metre high floodlights and perimeter fencing (A Change of plan from that previously granted by Planning Reference 19/297) (v) the construction of a new hurling 'ball-wall' adjacent to the proposed all-weather synthetic playing pitch (vi) The installation of 12 no 25 metre high floodlights serving existing Pitch Nos 3 and 4 (vii) The construction of new covered spectator stand serving Pitch 3. (viii) And the provision of dedicated area to the north of the existing centre of excellence building to be used as an occasional farmers/local market. Ancillary site works include the resurfacing of car parking areas, ball-stop netting serving each of the proposed pitches, public allotments and sensory garden areas
To Extend the Appropriate Period of Planning permission for P20/562 the development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
The development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application.
To (a) demolish previously constructed extensions (b) construct new extension and carry out alterations to dwellinghouse (c) Install new septic tank and percolation area together with all associated site development works and services
To (a)construct an extension to the existing dwelling to comprise of kitchen/dining/livingroom and playroom (b)To Refurbish existing dwelling to provide utility, pantry, bathroom and bedroom(c) To convert existing outbuildings to provide 3 No. bedrooms, en-suite, walk-in-wardrobe & bathroom. (d) to demolish existing extension to the rear of the dwelling (e) to install new wastewater treatment system including all associated site development works
Of a domestic garage and retention of alterations to existing dwelling house's front elevation and roof.
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
Of shed and fuel store as constructed together with all associated site development works and services