(1) Construction of a new detached dwelling house, (2) Construction of a domestic garage, (3) Retention of Alterations to Existing site Entrance and (4) proposed effluent treatment system and percolation area with all associated site worksDecision record indexed
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AND ALL ANCILLARY SITE WORKS INCLUDING NEW ACCESS ROADWAY.Decision record indexed
Construct dwelling house, domestic garage, septic tank and percolation area, together with all ancillary site works and servicesDecision record indexed
RETAIN CHANGES TO DWELLING HOUSE AND THE DEVELOPMENT PREVIOUSLY GRANTED UNDER P99/2825 AND P01/2601 AND TO COMPLETE THE DEVELOPMENT IN COMPLIANCE WITH THE CONDITIONS OF P01/2601Decision record indexed
The development will consist of the partial demolition and refurbishment of the existing farmhouse along with the construction of a proposed new two-storey extension to the rear and side, a proposed new front door entrance, separate garage, existing entrance upgrade, new wastewater treatment system, connections to site services, and all associated site works and landscaping.Decision record indexed
CONSTRUCT A DWELLING HOUSE, GARAGE AND SEPTIC TANK/FOUL EFFLUENT TREATMENT SYSTEM ALL AS PER DRAWING DOCUMENTATION SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Alterations and extension to existing derelict dwelling house, a new domestic garage and the replacement of the existing septic tank and percolation area with a new septic tank treatment system along with ancillary site worksDecision record indexed
A) Planning permission to retain existing dwelling house and septic tank system on revised site boundaries to that granted permission under previous planning reference P79/817, b) Retain as constructed domestic storage sheds within the revised boundary, c) retain site entrances as constructed and, d) construct upgrade works to the on-site septic tank system.Decision record indexed
Development consisting of the following works, 1. Extension to existing slatted cubicle shed to contain cubicles and slatted tank; 2. Construct New Slatted Shed containing slatted tank, cubicles and calf pens; 3. New calf Shed; 4. 2 No. New Silage bases; together with all associated site worksDecision record indexed
DEMOLISH EXISTING DERELICT HOUSE AND CONSTRUCT A NEW DWELLING HOUSE AND SEPTIC TANK/PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Henry & Mary Mellett are seeking to retain,on a revised site, the alterations and extensions to their dwelling house initially granted under planning permission 93/1309 and to retain a garage on the same siteDecision record indexed
The development will consist of the construction of a dwelling house, garage, septic tank and percolation area all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
DEMOLISH EXISTING OLD SHOP UNIT, DWELLING HOUSE AND SHEDS AND CONSTRUCT TWO NO. PRIVATE DWELLING HOUSES, PROPRIETARY EFFLUENT TREATMENT UNITS, PERCOLATION AREAS AND DOMESTIC GARAGES ALONG WITH ALL ASSOCIATED SERVICESDecision record indexed
(1) Construction of a new detached dwelling house, (2) Construction of a domestic garage, and(3) proposed effluent treatment system and percolation area with all associated site works at, Aghalusky, Sraheens, Balla, Co.MayoDecision record indexed
CONSTRUCTION OF SIDE EXTENSIONS AND ALTERATIONS TO EXISTING DWELLING HOUSE, REPLACEMENT OF ONSITE WASTEWATER SYSTEM AND ANCILLARY WORKSDecision record indexed
THE REPLACEMENT OF APPROX. 291M OF EXISTING 2.4M HIGH CHAINLINK FENCING AND ASSOCIATED GATES WITH 291M OF NEW 2.4 HIGH GREEN PALISADE SECURITY FENCING/GATES AND ALL ASSOCIATED SITE WORKS AT AN EXISTING ABOVE GROUND NATURAL GAS INSTALLATIONDecision record indexed
DEMOLITION OF THE EXISTING DWELLING, AND THE CONSTRUCTION OF A REPLACEMENT DWELLING, INSTALLATION OF A SEWAGE TREATMENT UNIT AND PERCOLATION SYSTEM, TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
RENOVATION AND EXTENSION OF AN EXISTING DWELLING INSTALL A SEWERAGE TREATMENT SYSTEM AND PERCOLATION SYSTEM TOGETHER WITH ANCILLARY SITE WORKS.Decision record indexed
The development will consist of the construction of a dwelling house, garage, septic tank and percolation area all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
CONSTRUCTION OF A 21 METRE HIGH FREE STANDING COMMUNICATIONS STRUCTURE (TOTAL HEIGHT WITH ANTENNAS 21.2 METRES) WITH ITS ASSOCIATED ANTENNAE, COMMUNICATION DISHES, GROUND EQUIPMENT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE DEVELOPMENT WILL FORM PART OF EIRCOM LTD EXISTING TELECOMMUNICATIONS AND BROADBAND NETWORKDecision record indexed
CONSTRUCT EXTENSIONS AND A NEW PORCH TO THE EXISTING DWELLING HOUSE, TO CONSTRUCT A DOMESTIC GARAGE, ON REVISED SITE BOUNDARIES ALL AS PER DRAWING DOCUMENTS SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Cloghboley House, Cloghboley Manulla, Castlebar Co. Mayo
The construction of a new Independent Living Unit to the side of the existing dwelling house and connection to existing septic tank together with all associated site works and servicesDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, AND CONNECTION TO EXISTING PUBLIC SERVICES TOGETHER WITH ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
Construction of a proposed new detached dwelling house, separate garage, shared entrance upgrade, new waste water treatment system, connections to site services and all associated site works and landscapingDecision record indexed
Retention of attic conversion, the construction of bathroom at first floor and the retention of domestic garage, previous planning ref. P03/3501Decision record indexed
Planning Permission to extend dwelling house and alter elevations, extend garage and alter elevations, construct office, upgrade foul treatment system, and relocate entrance all as per drawing documentation submitted together with all ancillary site works and servicesDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, AND CONNECTION TO EXISTING PUBLIC SERVICES TOGETHER WITH ALL ANCILLARY SITE DEVELOPMENT WORKSGrounds not yet categorised
RETENTION OF THE BUILDING AS CONSTRUCTED, CHANGE OF USE OF THE BUILDING FROM COMMERCIAL TO RESIDENTIAL, REMOVAL OF THE EXISTING CANOPY AND ASSOCIATED WORKSDecision record indexed
Renovation of existing derelict dwelling house and installation of septic tank and percolation area together with all ancillary site works and servicesGrounds not yet categorised
A) demolition of part of the existing dwelling house, b) construction of a single storey side and front extension to the remaining dwelling house, c) replacement of the existing septic tank with a new proprietary wastewater treatment system and d) all ancillary works on revised site boundariesDecision record indexed
DEMOLITION OF EXISTING DERELICT DWELLING HOUSE, CONSTRUCTION OF A NEW DWELLING HOUSE, RENOVATION OF EXISTING STORAGE SHED AND INSTALLATION OF WASTEWATER TREATMENT SYSTEM, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCTION OF A NEW HOUSE, GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, AND CONNECTION TO EXISTING PUBLIC SERVICES TOGETHER WITH ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE AND FUEL STORE, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA ALONG WITH ASSOCIATED SITE WORKS.Decision record indexed