Conversion of existing attic space comprising of modifications of existing roof structure, gable window; new access stairs and flat roof dormer to the rear.
Roof Profile revised from a double hipped roof to a Dutch gable style to the side and a dormer window to the rear.
Single storey front porch and ancillary site works.
370sqm side and rear extension, new entrance, and new facade to front elevation.
The proposed development includes retention permission for the reorientation of the gas AGI (above-ground installation) compound permitted under SDCC Reg. Ref.: SD23A/0158 and to retain an existing Gas AGI skid located to the north of the gas AGI compound. The development also includes the retention and completion of an extension to the existing Gas AGI compound to the south, to provide for a pressure regulating and metering station (PRMS) compound area. The PRMS compound extension comprises the following buildings and gas related infrastructure:•Skid House structure with a total area of c. 118 sq.m and overall height of c.3m. •E&I Kiosk with a total area of c. 11 sq.m and overall height of c. 2.7m •Boiler House comprising 2 no. individual units (Boiler House 1 & Boiler House 2) both with an area of c. 22 sq.m and overall height of c.3m. •Gas Quality Building with a total area of c. 3 sq.m and overall height of c. 2.4.m • All associated and ancillary works including valves and pipework, site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site which is subject to an EPA Industrial Emissions (IE) Directive license.
Single storey front, rear and side extension comprising of two bedrooms, 1 en-suite and 1 bathroom; attic converted for storage and roof windows to rear and side of roof; extend wall along site boundary and relocate wall 1.8m high that divides front and rear gardens and relocate access door to rear garden and all associated site works.
The construction of a ‘Build to Rent’ residential development comprising of 115 apartments (10 x studio units, 62 x 1-bed units, 38 x 2-bed units and 5 x 3-bed units) in 1 block, ranging in height from 2 storeys to 8 storeys over basement level with private balconies/terraces. The proposed development will also comprise of residential amenity facilities and services at ground floor level consisting of a gym, lounges, games room, conference room, meeting room, studio, concierge, bin store, and bike stores (140 spaces). A total of 48 car parking spaces at basement level with a drop-off/service lay by at ground level, 224 bicycle parking spaces across basement, ground floor and surface levels, landscaping including 1 communal roof terrace at 2nd floor level and a landscaped courtyard at ground floor level, public realm works including a new pedestrian path from the public open space at Monastery Gate to the north and along the southern site boundary with a pedestrian connection to Monastery Road to the south, public lighting, boundary treatments 2 no. ESB substations at ground floor level, plant at basement and roof levels and all associated site development and infrastructure works including foul and surface water drainage, necessary to facilitate the development. Vehicular access to the site is from Monastery Road (via the existing access road to the IBIS Hotel) with pedestrian access from Monastery Road and Monastery Gate. The development also provides for all associated site clearance works.
Installation of a new canopy roof to the south side of the existing Heiton Steel warehouse and all associated site works.
Replacement of existing asbestos roof covering with a new Kingspan insulated roof panels; replacement of rooflights with new and installation of a roof mounted solar photovoltaic panels to include all ancillary works and services.
The removal of existing roof finish to the side (southern) extension granted under SD13B/0233 and replacement of same with standing seam engineered roof covering
The development proposed will supersede the permitted ICT Facility 4 under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158. A five-year planning permission is sought in respect of this proposed development. The proposed development comprises the following: • Construction of an ICT Facility Building (ICT Facility 4), with a Gross Floor Area (GFA) of 15,744 sq.m and a parapet height of c. 21.80m (with flues located at roof level, c. 4.5m over parapet height), over 3 no. levels, located in the southern portion of the wider landholding. This ICT Facility includes an associated external plant area of c. 1,796 sq.m over two levels, accommodating 22 no. emergency generators and associated flues. • The ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas and screened plant. • Construction of ancillary structures including a guard hut, fire hydrant water storage tanks, fire hydrant pump plantroom, water mist fire protection pump plantroom and water tanks, and cold water plantroom to the west of the proposed ICT Facility 4. • Construction of a revised internal road network and circulation areas to serve ICT Facility 4, footpaths, provision of 25 no. car parking spaces (including 2 no. disabled parking bays) and 18 no. cycle parking spaces within a bike shelter. • Lighting, boundary treatments and all ancillary and associated development (including the construction of an underground foul and storm water drainage network, and utility cables). • Hard and soft landscaping and planting, lighting, screening, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables. An EPA-Industrial Emissions Directive (IE) licence will be required to facilitate the operation of the proposed development.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new access stairs and flat roof dormer to the rear.
Garage conversion and extensions at first floor to side and at ground floor with level access deck to rear.
Planning Permission for (1) Construction of a two storey pitched roof side extension to the existing dwelling (2) Construction of a single storey flat roof rear extension to the existing dwelling and extending for the width of the two storey extension. (3) Works to the existing house (a) Internal alterations at ground and first floor level to facilitate the new extension (b) Alterations to existing ground floor window on the front elevation (4) Increased width vehicular entrance of the public road and (5) All necessary ancillary site development works to facilitate this development
Construction of a new three-storey extension and alterations to Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin, previously granted planning permission (Ref: SD22A/0352) and currently under construction. The development will consist of providing 2no. Classroom suites of Special Educational Needs accommodation for each school. Both Special Educational Needs units will be inclusive of 2 no. class base rooms, en-suite toilets, withdrawal room associated with each class base, central activity spaces, staff toilets, pupil toilets and shower facilities, storage and office, all at ground floor level, along with the relocation of 2 no. classrooms and en-suite toilets from the ground floor of both schools ground to first and second floor of the proposed three-storey extension The development will also consist of an extension at first floor level, along with minor alterations to Stair Core 4 to the north elevation of Gaelscoil na Camoige and an extension at second floor level along with minor alterations to Stair Core 3 to the west elevation of Gaelscoil Chluain Dolcáin. The development will also consist of the provision of new soft play external areas for both Special Educational Needs units, connections to the existing drainage layout and all ancillary site development works. The total area for the development is 630m2
Construction of two new three storey primary school buildings for Gaelscoil na Camoige agus Gaelscoil Chluain Dolcain providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation; The development will also consist of the construction of a new single storey PE Hall building for Colaiste Chilliain; The development will also include two new pedestrian access routes, with one located on New Nangor Road and with another located at the junction of New Nangor Road and Old Nangor Road; A new vehicle entrance and exit onto Old Nangor Road to provide a one-way vehicle route with a bus/vehicle set down zone, conversion of existing vehicle entrance to Colaiste Chillian to an in-only entrance; 2 new hard play courts and play space at each primary school with site landscaping, bicycle parking spaces and car parking spaces for each primary school including accessible car parking spaces, internal refurbishment works to Colaiste Chilliain to facilitate the reintegration of teaching accommodation upon Gaelscoil Chluain Dolcain's move to the new school; Removal of the existing temporary changing room and relocation of car park at Gaelscoil Chluain to provide accessible parking spaces and associated works; Connections to public utility and drainage services, boundary treatments, installation of PV panels, alterations to existing drainage layout and associated site development works.
Proposed rear domestic extension, conversion of existing attic space with change of roof profile to mini-hip with dormer to rear, Velux to front windows to side and all associated site works.
The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m; The provision of underground water process tanks located to the south of ICT Facility 1; The provision of a wastewater treatment skid located to the west of ICT Facility 1; Reconfiguration of car parking spaces resulting in an overall reduction of 1 no. car parking spaces from 44 no. car parking spaces to 43 no. car parking spaces; Relocation of permitted cycle parking from the north of ICT Facility 1 to the south of ICT Facility 1; Amendments to fenestration and arrangement of façade treatment to ICT Facility 1 and minor reconfiguration of the internal layout; and All associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.
Retention permission and continuation of use of a former double height warehouse within their building as 426.6sq.m of office use, over two floors as well as all associated and ancillary elevation changes.
Footpath within the western and southern boundaries of the site; erection of a new palisade fencing of 2.4m in height along the southern and western site boundary and a new pedestrian access gate from the north end of the site boundaries at Crag Avenue; single storey, detached vehicle control structure; provision of hard standing at the north west corner of the site; erection of 7 flood light poles and lights along the southern and western boundaries of the site; all associated site development and engineering works.
Retention permission for new sectional door; 5m high by 3.9m wide; to the south-east elevation of an existing building.
Amendments to the development permitted under Reg. Ref. SD20A/0309 comprising: alterations to permitted ICT Facility buildings 2 and 3, to include internal reconfiguration of the ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and reconfiguration of screened plant; alterations to the external facades of permitted ICT Facility buildings 2 and 3 to include modification and reconfiguration of fenestration, louvers, loading bays, and access doors, along with an increase in height of 1.2 metres to main parapet level and reduction in the height of rooftop plant to not exceed the parapet height of the buildings, along with the omission of previously permitted flues and exhaust ducts at roof level; omission of emergency generators and associated flues from permitted ICT Facility buildings 2 and 3; The proposed amendments to ICT Facility buildings 2 and 3 result in an increase in their gross floor area (GFA) of 2,511sq.m for each building, resulting in an overall increase in the GFA of the two buildings of 5,022sq.m; Alterations to the water storage tanks serving the permitted ICT Facility buildings, including total increase of 268 sq.m GFA to the permitted pumprooms and a reduction in the scale of the associated water storage tanks. All associated and ancillary works; The application site is subject to an EPA Industrial Emissions Licence relating to the Energy Centre permitted on site (under Reg. Ref.: SD18A/0068 as amended by Reg. Ref.: SD19A/0185).
Alterations to the development permitted under Reg. Ref.: SD18A/0068, as previously amended under Reg. Ref.: SD19A/0185 and Reg. Ref.: SD20A/0242, and to the development permitted under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093. The proposed alterations in summary comprise the provision of an altered energy centre design and all associated development, along with minor alterations to the permitted site layout, provision of a gas AGI, and all ancillary works. The development, for which a 5-year planning permission is sought, will comprise the following: Construction of a revised energy centre in the western part of the subject site, to accommodate alternate generation technology, including 10 no. gas generation turbines (all with associated flues, 8 no. c. 33 metres (m) in height and 2 no. c. 15 m in height), 2 no. steam turbines including 2 no. steam turbine generator enclosure buildings with a gross floor area (GFA) of 219 sq.m each and a height of c. 6.2 m, associated steam turbine generator distribution and control structure with a GFA of 84 sq.m and an overall height of c. 4.2 m, and 2 no. steam turbine / air cooled condenser structures with a height of c. 25.4 m. Construction of 8 no. 33/20kV transformer bays to the southeast of the energy centre, with a further 12 no. gas / steam transformers to serve the proposed turbines to the west of the energy centre. Provision of 3 no. 13.6 m high fuel storage tanks, a fuel oil enclosure building (with a GFA of 50 sq.m and an overall height of c. 3.8m), a fire pump enclosure building (with a GFA of 65 sq.m and an overall height of c. 3.2 m) along with 3 no. c. 14.1 m high sprinkler tanks, a c. 14.5 m high water tank, and a water treatment plant building (with a GFA of 218 sq.m and a maximum height of c. 17 m including rooftop plant). Provision of 6 no. black-start / emergency generators to the south of the energy centre with an overall height of c. 5 m; Provision of a single storey over basement level powertrunk building (with a GFA of 932 sq.m and an overall height of c. 4.1 m) to the southeast of the proposed energy centre. Provision of a 3-storey over basement medium voltage / low voltage building (with a GFA of 3,161 sq.m and an overall height of c. 16.3 m) to the southwest of the proposed energy centre. Provision of 2 no. transformers adjacent to the substation constructed under Reg. Ref.: SD18A/0068, as amended by Reg. Ref.: SD19A/0185 (located to the southwest of the proposed energy centre). Provision of a guard hut with a GFA of 21 sq.m and with a height of c. 3.2m, to the west of the medium voltage / low voltage building. Provision of a Gas AGI (above-ground installation) to the southwest of the subject site within a fenced compound, accommodating a single storey control room building with a GFA of 10 sq.m and overall height of c. 3 m, a plant kiosk with a GFA of 17 sq.m and an overall height of c. 3 m, and a boiler house with a GFA of 13 sq.m and an overall height of c. 3m. Reorientation of permitted ICT Facility Building No. 4 to accommodate the revised energy centre layout (with no other change to this permitted building). Associated and ancillary alterations to the site layout relating to landscaping, parking (including 18 no. car parking spaces, and bicycle parking within a covered bicycle shelter to serve the energy centre) and roads layouts, lighting and services, boundary treatments, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development.
Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previously approved and are not affected by the current application. The proposed development will comprise the following: The construction of 4 ICT Facility buildings (ICT Facilities 1, 2, 3, and 4) with a combined total gross floor area {GFA) of c. 47,564.5 sq.m, Each ICT Facility building includes associated external plant areas, totalling c, 20,649.5 sq,m, ICT Facilities 1, 2, and 3 will be located in the eastern portion of the site, and each comprise a GFA of c. 15,196 sq.m (including ancillary office and administration space) over part two and part three levels with a maximum height of c, 25 metres and a parapet height of c, 19.5 metres, Each of the ICT Facilities will include an associated external plant area of c, 6,624 sq,m, ICT Facility 4 will be located in the southern portion of the site and comprises a GFA of c, 1,976.5 sq,m (including ancillary office and administration space) over two levels with a maximum height of c, 15 metres and a parapet height of c. 10.5 metres, This ICT Facility includes an associated external plant area of c. 777.5sq.m, Each ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and screened plant. Construction of internal road network and circulation areas, footpaths, provision of 153 no. car parking spaces and 54 no, cycle parking spaces. Connections to vehicular access routes, roads, services and permitted infrastructure relating to the Energy Centre and 110kV GIS substation permitted under Reg, Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185. Provision of emergency generators with associated flues, water storage tanks and associated pump rooms (comprising 150 sq,m in total) to serve each of the proposed ICT Facility Buildings. Hard and soft landscaping and planting, lighting, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables.
Retention of replacement single storey pitched roof office building (183.7sq.m) and associated site works; the original flat roofed office building comprised 132sq.m; totem sign 1.37m wide x 5m high.
Retention permission and permission for development at the existing shotblasting facility. The total planning application site area extends to approximately 0.92 Ha. Retention permission is sought for: a 2 bay portal frame structure at the northern end of the facility and a 153 sq.m floor area extension at the southern end of the facility. Permission is sought for: a 716 sq.m floor area extension at the southern end of the facility; roof to enclose the 2 bay portal frame structure (for which retention permission is sought) minor changes to the internal layout including relocation of toilet and provision of ancillary office space; concrete resurfacing of the main yard area; minor elevational changes; and all associated site and development works above and below ground.
Change of use from haulage yard to filling station open to the public; additional diesel pumps; palisade fencing; illuminated and non-illuminated signage; all associated site and development works.
Retention for 2 bay portal frame, additional floor area to existing industrial unit. Permission for roofing of 2 bay portal frame structure; extension to existing industrial unit; construction of a concrete resurfaced area in main yard; minor internal layout and elevational revisions to existing industrial unit and all associated site works including underground surface water attenuation and related utilities and works.
Replacement of signage on the premises front elevation.
Reduction of single storey rear extension; construction of detached 2 storey house in side garden with new access and parking arrangement in front garden and associated works.
Attic Conversion with front roof lights, attic yoga/storage spaceand rear dormer window bedroom extension including all associated ancillary works
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Full demolition of existing two storey 463sq.m building to make way for future development, subject to future separate planning application.
Construction of a new bus interchange to replace that existing at Red Cow Luas park and ride car park. The proposed works consist of the provision of 9 new sawtooth type bus bays, bus shelters, overhead canopies, a bicycle building, passenger and driver welfare facilities, and an electrical substation. A new carriageway arrangement for bus access and circulation including a reconfiguration of the western car park layout to allow for provision of taxi and drop off facilities is also proposed. The proposed works also include minor realignment of the park and ride access road between the mini roundabout entrance to the western car park and the mini roundabout entrance to the eastern car park. The existing Luas stop, depot building, surface parking facilities and bus interchange were originally granted permission under LRO 59 of 1999.
Revision to existing permission (SD24B/0194) to include enlargement of single storey extension to rear with internal modifications and associated site works.
Planning permission for attic conversion to non-habitable storage space with metal clad dormer and Velux to rear roof. Permission to alter roof profile from hip roof to gable roof. Relocation of existing window on side gable. Proposed single storey extension to existing extension to rear with all associated ancillary works. at 16 St Patricks Road, Ballymanaggin Dublin 22
Retention Planning Permission for detached single storey gym/shed & outdoor canopy seating area to rear garden with associated ancillary works.
The proposed development will consist of an amalgamation of two existing units, including the making of internal connections between both units across the three floor levels, of replacement of the solid metal double doors at the rear of Unit 17 with a double glazed window, and of installation of two new self-illuminated signs, the first sign of approx. 2.09sqm on the West elevation 8.300m above ground and second sign of approx. 3.125sqm on the East elevation 3.260m above ground
New Ground Floor Extension to front with new metal clad canopy over existing porch and new extension with internal modifications and associated site works
New dormer type window extension to side elevation for existing bedroom, new metal clad canopy over existing bay window and entrance door to replace existing tiled canopy, with internal modifications and associated site works.
4 2-storey, 3 bedroom houses including parking and related infrastructural works, alterations and widening of existing vehicular access gateway at the front of the site onto Crag Avenue within the curtilage of the Protected Structures at No's 6 & 7 Ballymanaggin Lane (RPS reference numbers are 117 & 121 respectively).
Retention of existing self-service laundromat facility.
Car wash & car wash plant room with water recycling system; re-location of the main ID sign and all associated structures, drainage and site development works.
Change of use of existing convenience shop to include part off-licence use (gross floor area for off-licence use 22sq.m) and associated works.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs from first floor and flat roof dormer to the rear.
Change permitted house type to a three bed, detached dwelling and associated works.
Retention for detached single storey shed/gym/office to the rear of the garden with ancillary works.
Retention of an existing porch at the front elevation of the house and permission to widen the driveway from 2.84m to 3.5m width.
Construction of 2 two and a half storey, three-bedroom terrace houses and associated site works attached to the existing two and a half storey house at No. 6 Station Grove which was constructed in 2006; the 2 houses will complete this partially finished housing development which was originally granted permission under planning reference SD05A/0125.