Single storey extension to rear of existing house, permission also sought for 2 storey, 2 bedroom house to side, front and rear of existing house, new house being attached to existing and all associated site works
Planning permission for construction of a two story extension to the side of existing end of terrace house and a new front door to replace existing window in porch at front of house at 45 Arthur Griffith Park Lucan Co. Dublin
Construction of 2 storey end of terrace house to side of existing house, removal of existing chimney stack, new entrance drive with double gates to side boundary wall and a new front door to replace existing window at front in existing porch.
Widening of existing driveway entrance and dishing of footpath to allow for vehicular access to include removal of pier and wall to front of existing property and all ancillary site works required
A) The construction of a single storey detached ancillary garden building to rear garden together with associated landscaping and site works B) Retention of a timber boundary fence.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new access stairs and flat roof dormer to the rear.
Demolition of the existing rear extension and canopy and the construction of a single storey extension to the rear and a two storey extension to the front and side of the existing house; one rooflight to the proposed single storey extension; the construction of one dormer window to the rear of the main roof slope of the existing house; 2 rooflights to the front main roof slope; construction of single storey porch to the front; all associated elevational changes including alterations to existing window opes; and all associated site works.
Retention of single storey extension to front, side and rear of existing house, extension with new utility, bedroom and games/storage room; all associated site works.
Construction of a single storey porch to the front of the existing dwelling and all associated site works.
Retention to change from part use of the house to the entire use of the house for a child care centre.
The development consists of permission for retention of a single storey, masonry constructed, detached outbuilding with a flat roof to the rear of the existing dwelling house.
Front bay extension comprising porch and disability bedroom and bathroom. Two storey extension to rear for bedroom and kitchen.
Construction of 2 adjoined single storey data centres with associated office and service areas with an overall gross floor area of 15,274sq.m comprising of the construction of 2 adjoined single storey data centres with a gross floor area of 12,859sq.m that will include a single storey goods receiving area / store and single storey office area (2,415sq.m) with PV panels above, located to the east of the data centres as well as associated water tower, sprinkler tank, pump house and other services; The data centres will also include plant at roof level; with 24 standby diesel generators with associated flues (each 25m high) that will be located within a generator yard to the west of the data centres; New internal access road and security gates to serve the proposed development that will provide access to 36 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; New attenuation ponds to the north of the proposed data centres; Green walls are proposed to the south and east that will enclose the water tower and pump house compound; The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage; The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and Ref. SD21A/0042; The site will remain enclosed by landscaping to all boundaries; The development will be accessed off the R120 via the permitted access granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and SD21A/0042; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs, 1 no. roof window to the front and flat roof dormer to the rear.
PERMISSION for development at this site at Grange Castle Business Park. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of revisions to parent permission SDCC Reg. Ref. SD24A/0188W to include the following: Removal of internal mezzanine floor level (175sqm). Removal of internal staircase. Introduction of external staircase to be located adjacent the south façade and enclosed in screening panels. All other developments as permitted under the SDCC Reg. Ref. SD24A/0188W: A permitted storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.
Microsoft Ireland Operations Ltd. intend to apply for PERMISSION for development at this site at Grange Castle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of a storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.
New external Freezer Plant Platform Structure; single storey MRO Stores building within the existing construction compound; external Data Centre unit to the south of the existing Manufacturing Suites Building; airlock extension & relocated external double emergency exit doors to the south of the existing Manufacturing Suites Building; Pallet Storage building adjacent to the existing Drum Store West building within the Utility Yard and boiler Water Chemical Dosing Unit within the CUB yard and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs, and flat roof dormer to the rear.
Planning Permission for a two storey extension to the side of a two storey semi-detached house, convert the attic to a non habitable room and all associated site works
Permission for development consisting of the completion of the development granted permission under Planning Application Reg. Ref. SD16A/0236 subject to the amendments and alterations to the previously approved biopharmaceutical manufacturing facility and warehouse extension and other additional, new development not forming part of SD16A/0236, located at the Pfizer site at Grange Castle Business Park, New Nangor Road; The modifications to the approved development will consist of alterations and modifications to previously approved site buildings and infrastructure required to support the proposed development they include, (a) A 6-level biopharmaceutical manufacturing building sized approximately 30,469sq.m (previously approximately 34,650sq.m) and approximately 35 metres high (previously approximately 28.2m high), with stairwells approximately 38m high, and roof-mounted plant and equipment, including solar panels; Modifications to the existing Development and Manufacturing Facility including elevational alterations and modifications to existing plant and equipment; (b) A single-storey warehouse building extension with high-bay, sized approximately 3,200 square metres (previously approximately 1,142sq.m) and approximately 17.5m high, with roof-mounted plant and equipment, including solar panels; (c) A single-storey pedestrian and materials link sized approximately 1,687sq.m (previously approximately 750sq.m) and approximately 6.95m high; (d) A new, additional 4-level extension to the existing DS1 biopharmaceutical manufacturing building, to accommodate material lifts and storage areas, sized approximately 1,925sq.m and approximately 38.2m high, to the south elevation of the existing building; (e) A new, additional single-storey chiller building sized approximately 395 square metres and approximately 6.25m high, with roof-mounted plant and equipment; (f) A new, additional single-storey plant and utilities building sized approximately 256sq.m and approximately 6.25m high, with roof-mounted plant and equipment; (g) Provision of relocated car park from its previously permitted location at the northeast of the side to a new location to the southeast of the proposed biopharmaceutical facility; including approximately 273 additional car parking spaces, including accessible car parking spaces, electric vehicle charging, motorcycle parking, dedicated car-pooling spaces and cycle parking, all accessed from the internal Grange Castle Business Park roads. Mobility parking is located adjacent and directly north of the proposed facility; (h) A relocated, single-storey security building sized approximately 60 sq.m and 6m high; (i) The proposed site infrastructure includes additional cooling towers/heat exchangers, a tank farm, pipe-bridges, surface water harvest tanks, docks and yard areas, including associated items of plant and equipment, an electric vehicle charging and solar panel substation to service photovoltaic panels over new car parking spaces, photovoltaic solar panels located over new car parking spaces, electrical generators, underground pumping facilities and internal roads and paths, fencing and site lighting, and the use of the existing Pfizer site entrance (Gate No.3) for heavy goods vehicles; (j) The development includes modifications to and the extension of, the existing internal road network within the Pfizer Campus; (k) Proposed new landscaping includes new landscaped and planted areas, replacement and reinforcement of the existing landscaping and modifications to existing berms and perimeter security fencing and gates; (l) Proposed new signage based at ground level and on the building facades on the proposed new production building; (m) The works include temporary contractor compounds, temporary car parking and the temporary use of existing site entrances during construction activities; (n) Proposed new surface water management infrastructure for the site, consisting of underground attenuation systems, rainwater harvest cisterns and distribution pipework; (o) All associated site works including sustainability features described in points (a) to (I); Planning permission for the construction of a temporary contractors car park on land to the west of the Pfizer facility with access off Grange Castle Business Park and the reinstatement of the lands to agriculture after the need for the car park expires; The application is seeking permission of 5 years for the completion of the development granted permission under PA Ref: SD16A/0236 subject to the above amendments and alterations to the previously approved Biopharmaceutical Manufacturing Facility and Warehouse and other additional, new, development not forming part of SD16A/0236; This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required; An Environmental Impact Assessment Report (EIAR) accompanies this planning application.
Replacement of existing signs in approved locations including the high level signs on the western elevation of the Drug Substance Building and the northern elevation of the Administration QAQC Building with a halo lit company logo and lettering and a face lit company logo and lettering, respectively; the nonilluminated wall mounted company sign adjacent to the entrance on the northern elevation of the Administration QAQC Building with non-illuminated company logo and lettering; the non-illuminated signs on structures on the verge of the Business Park estate road to the west of the site; and the signage on the approved internally illuminated structure on the verge at the junction of the Business Park estate roads to the north west of the site. The development for retention permission consists of the retention of a non-illuminated sign installed on a structure on the verge of the Business Park estate road to the west of the site; non-illuminated signs installed on the boundary fence adjacent to two of the entrances to the site from the Business Park estate road; non-illuminated traffic direction signs installed on traffic sign poles adjacent to the southern entrance into the site and on the verge of the Business Park estate road to the west of the site; and a wall mounted non-illuminated sign with company logo and lettering adjacent to the entrance on the western elevation to the Central Utility building.
Construction of a fully serviced single storey, dormer-style detached house in the existing front garden; new boundary walls and separate vehicle entrance.; connection to County Council foul and surface water and all ancillary site works.
Extension to existing external freezer plant platform structure to east of existing building and associated site works.
Two storey extension to side including a garage conversion; attic conversion to habitable use with dormer windows to rear and a single storey extension to rear and ancillary works.
Change of roof profile from hip end profile to full gable end profile, to accommodate attic conversion with 2 Velux roof lights to rear; All associated wite works to rear.
The development will consist of conversion of existing attic with dormer extension to the rear, also one new Velux roof window to the rear.
Additions, alterations and modifications to the existing and permitted industrial facilities, with a total area of approximately 305.8 sqm (permitted under Reg Ref SD23A/0123) at the Pfizer site in Grange Castle. They include; A. a single storey extension to the link building adjacent to the DS2 building permitted under Reg Ref SD23A/0123. The proposed extension is approximately 240 sqm and approximately 7.9 meters high. B. Demolition of existing single-storey extension approximately 36 sqm and approximately 4.2 meters high and construction of a new single storey extension to the existing Softened Water Building. The proposed extension is approximately 65.8 sqm and approximately 7.2 meters high. C. The works also include modifications to internal roads and pathways, underground utilities, site lighting, internal roads and footpaths and all associated site works. This application consists of a variation to previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required.
Permission for a new single storey pitched roof extension (c.184sq.m) to north side of existing function room building with design features (parapet, windows, render finish) and height (c.7.2m) to match existing; all site drainage and landscape works. Permission is also sought for the retention of minor modifications to the internal layout of the kitchen, store rooms and toilets adjacent to the existing function room (c190sq.m in total).
Alterations to planning Ref. SD15A/0066, changes from separate dwelling to the following; erection of a new two storey extension to front, side and rear of existing house for additional bedrooms and kitchen extension and new sitting room and all associated site works.
Conversion of existing attic space comprising of modifications to existing roof structure, raising of existing gable c/w window and 'Dutch' hip, new access stairs and flat roof dormer to the rear.
Side & rear single storey extension of 60.78sq.m to existing two storey dwelling; connection to existing services and associated site works.
The development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme. Permission is also sought for the relocation of bicycle parking areas within the site; revisions to the permitted boundary treatment along a section of the eastern site boundary; the installation of 3 no. flagpoles in the south-eastern part of the site; and revisions to the site compound including repositioning of bin store area and replacement of previously permitted bio-mass heating with new heat pump and gas storage tank.
Two storey side extension consisting of ground floor car garage and store with first floor ensuite bedroom.
Proposed 38m2 flat roof ancillary garden studio located to infill irregular space at rear (western side) of existing garden along with associated siteworks
Construction of a 30.6 sq./m single storey extension to the side of existing dwelling.
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable with Dutch hip c/w window; new access stairs and flat roof dormer to the rear.
The proposed primary school will extend to c3,355sq.m will be 2 storeys in height and will comprise 16 no. classrooms with an additional 2 classroom Special Educational Needs Unit; a General Purpose Hall and all ancillary teacher and pupil amenities and facilities. The proposed development also provides for hard and soft play areas, including 2 no. outdoor ball courts, bicycle parking, staff car parking, vehicle drop off and set down areas. Photovoltaic Panels (PV) are proposed on roofs in addition to EV Charging Points and a packaged Biomass heating plant. The proposed development also provides for all landscaping and boundary treatments and all associated site development works. Access to the site will be via a new junction and access road off Thomas Omer Way. The new access road will run south off Thomas Omer Way and then west into the site. The proposed access road Is in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme and incorporates public lighting, footpaths and cycle tracks. A further pedestrian / cycle only connection to Thomas Omer Way ls also proposed along the western green corridor, west of the proposed school building.
Retention/change of use of existing development and shed/outbuilding; the development was originally built as a welfare facility building but is currently being used as a childcare facility.
Retention for single storey canopy roof to front and side of house; single storey lean to roof canopy extension to the rear with ancillary works.
Alterations to the existing single storey school building and the building linked two storey extension to the south and east. The proposed development includes the creation of a new vehicular entrance off Esker Drive with the existing entrance becoming exit only; minor alterations to the elevations and arrangements of functions to the existing single storey school building; the construction of a new one and two storey extension of 5620sq.m to accommodate a Special Education Needs Unit; a PE hall; teaching spaces and associated ancillary functions; the temporary relocation of one existing pre-fabricated building during the construction works; the removal of all pre-fabricated buildings upon completion; the provision of a temporary car parking during construction; the provision of 92 permanent car park spaces and 200 bicycles spaces; the revision of the site layout to now include 6 ball courts; a secure play area for the SEN unit; and the creation of 2 secure pedestrian gates linking the school lands to the adjacent local authority park land and playing fields.
Construction of two storey extension to the side of existing dwelling comprising of family room and utility room at ground floor and bedroom at first floor.
Amendments to the electrical substation compound and structures permitted under Reg. Ref. SD19A/0042 and ABP Ref. 305948-19 comprising of amendment to the layout and extent of the permitted substation compound, to include an extension of the compound area to c. 0.77 hectares; reorientation of the Gas Insulated Switchgear (GIS) substation building to a northsouth orientation, and associated amendments to the building footprint, layout, and elevations, providing for a two storey building with a gross floor area (GFA) of c. 1,456 sq.m; alterations to the permitted single storey Client Control Building to provide for the substitution of this structure with 5 single storey modular client control units, with a combined total GFA of c. 231 sq.m (GFA of c. 46.2 sq.m per module); associated amendments to the permitted substation access arrangements (3 gated access points provided), transformers, security fencing (to be 2.6 metres high in place of the 2.4 metre high fencing permitted), lighting, services, MV substation, parking, utility cabling, amendments to permitted landscaping and berms adjoining the substation compound and associated and ancillary works.
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.
Conversion of existing attic with dormer extension to rear, also two new velux roof windows, one on hipped side roof and one to rear roof. New garden walls to front and side of front garden.
Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
The development will consist of the amendment of Condition no. 3 (ii) and 3 (iii) of the permission granted under Reg. Ref. SO21A/0042 that related to the Gas Plant of the overall permitted development only, so that these aspects of the new condition shall read as follows: Condition no. 3(ii) Within four (4) years from the date the first Gas Plant commences operation, the applicant or operator shall undertake a review with GNI of the ability to serve the Gas Plant with green gas and / or hydrogen (or similar fuels) shall be Investigated and reported to the Planning Authority. Any ability for the Gas Plant to be operated with green gas and/ or hydrogen (or similar fuels) shall be implemented within an agreed timeline agreed with GNI. Condition no. 3(iii) If the applicant receives a firm offer from Eirgrid under which the Gas Plant is not required, and the connection has been realized with capacity onsite from Eirgrid, then the Gas Plants shall be removed from the entire site within a year of the ceasing of operation. The nature and extent of the permitted Gas Plants, or any other element of the parent permission granted under Reg. Ref. SD21A/0042 will otherwise not be amended by this application. An EPAIndustrial Emissions (IE) licence will be applied for to facilitate the operation of the Gas Plant that Is subject of this amendment application.
Refurbishment and extension to the existing house consisting of a two extension of area of 66sq.m to the side and rear of the dwelling including a garage to the side at ground floor level, the alteration and increase of front door canopy, new skylights to roof on front elevation and all associated site works.
Single storey extension to the side and rear of dwelling comprising of bedroom, bathroom, family room and dining room.
Construction of a single storey living room and playroom extension to front and for two storey kitchen and bedroom extension to rear, with all associated site and drainage works.