New Ground Floor Extension to front with new metal clad canopy over existing porch and new extension with internal modifications and associated site works
Retention of 1 standby diesel generator with an associated flue (15m high) within the permitted generator compound located to the east of the data centre granted under SDCC Reg. SD16A/0345 increasing the number of standby diesel generators from 5 to 6 within the permitted compound.
New dormer type window extension to side elevation for existing bedroom, new metal clad canopy over existing bay window and entrance door to replace existing tiled canopy, with internal modifications and associated site works.
Amendment to existing Ref. SD20A/0223 repositioning of new house to back garden, change of design to detached four bedroomed house with a flat roof; demolition of shed; shared vehicular access together with all on-site services and utilities.
Remove section of existing grass margin and extend concrete apron to rear of existing public footpath and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre area.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Retention permission for; 1) Conversion of existing attic space comprising of modification to existing roof structure, new access stairs, 4no roof windows to the rear. 2) Single storey extension with 2no. roof windows to the rear of existing dwelling. and Planning permission for; 1) Single storey extension with 2no roof windows to the rear of existing dwelling and all associated site works.
Permission for residential development comprising 9 dwellings. The proposed development is comprised of: (1) 2 Type A, 2 bed two storey semi-detached houses; (2) 1 Type B, 3 bed two storey detached house with attic conversion; (3) 2 Type C, 3 bed two storey end terrace houses with attic conversions; (4) 2 Type D, 2 bed two storey mid terrace houses with attic conversions; (5) 2 Type E, 3 bed two storey end terrace houses with attic conversions; (6) proposed new vehicular access road from St. Johns Road (located on lands owned by South Dublin County Council); (7) connections to all services and all ancillary site development works and (8) a pedestrian access gate at the intersection of Commons Road and Fonthill Road (located on lands owned by South Dublin County Council).
Residential development consisting of the construction of a four to six storey building accommodating 44 apartments comprised of 22 one bedroom apartments and 22 two bedroom apartments; vehicular access to the proposed development will be via St. John's Road with 10 car parking spaces and 24 bicycle parking spaces and ancillary services all on a site of 0.31 hectares to the rear of St. John's Road with frontage onto Fonthill Road.
Retention permission for the removal of existing scrub plantation and for the plantation and for the placing of clean broken stone at ground level, for the creation of an overflow carparking area for work vehicles and buses and for the erection of a green mesh fence and galvanised palisade fence to the roadside (Boot Road) boundary. Full planning permission is being sought for the restoration of the existing stone wall that is adjacent to the boot road including proposed trees and all associated site works to the east of existing Green Isle Hotel, Boot Road, Clondalkin 22
The development seeking permission will consist of the construction of a dormer window in the main roof to the rear of the property as well as the construction of two rooflights in the main roof to the front of the property and all associated site works.
Kelland Homes Ltd seeks permission for retention development, consisting of the replacement of permitted railing located to the rear of 8 no. duplex blocks under grant of permission SDZ22A/0010 with a proposed dividing wall measuring 1.8m in height sloping down to 1.1m on the overall site measuring 0.1ha located within Keepers Lock Clonburris Dublin 22.
Retention and continuance of the use for a further two years of the temporary gas powered generation plant, that is located to the rear of the Takeda Ireland complex, that is sited within a walled year of 2,836sq.m containing 12 generator units with associated flues (each 15m high), which was permitted initially for a period of three years under Reg Ref. SD16A/0345 and was subsequently extended for an additional period of 2 years from the 4th February 2020 under Condition no. 2 of permission granted under SD19A/0342 Vehicular access to the generation plan will remain from the permitted service road into Edgeconnex site and Grange Castle Business Park as originally permitted.
Attic Conversion with front roof lights, attic yoga/storage spaceand rear dormer window bedroom extension including all associated ancillary works
27sq.m first floor extension over an existing ground floor to the front, rear and gable.
Conversion of attic to storage including changing existing hipped end roof to a gable end roof; dormer window to the rear and a window to the new side gable wall, all at roof level.
A ground and first floor pitched roof extension to the rear of existing house and all associated works
Two storey dwelling in side garden of existing family home using existing entrance to provide access to public road. Installation of waste water treatment system to required detail.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Change of house plans of two storey private dwelling in side garden of existing family home; Re-Arrangement of existing entrance to provide required access to public road; Installation of waste water treatment system to required detail as granted under Reg. Ref. SD20A/0200; Building of private garage - floor area 49sq.m on western side of proposed dwelling.
Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2m2), 1 no. 2 storey retail /commercial unit (c.152.1m2).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed development will connect into the permitted Infrastructural works as approved under the Clonburris Strategic Development Zona Planning Scl1ame (2019) and permitted under Ref. SDZ20A/0021, with the proposed development connecting into the permitted surface water drainage attenuation systems i.e. 1 no. pond, 3 no. modular underground storage systems and 1 no. detention basin combined with modular underground systems. The proposed wastewater infrastructure will connect into a permitted foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SOZ lands (Including future Irish Water pumping station permitted under SDZ21A/0006). The proposed development also provides for all associated site development works above and below ground, public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (401 no. spaces), bicycle parking (797 no. spaces), bin & bicycle storage, public lighting, plant (M&E), utility services & 4 no. ESB sub-stations. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Revision to existing permission (SD24B/0194) to include enlargement of single storey extension to rear with internal modifications and associated site works.
Planning permission for attic conversion to non-habitable storage space with metal clad dormer and Velux to rear roof. Permission to alter roof profile from hip roof to gable roof. Relocation of existing window on side gable. Proposed single storey extension to existing extension to rear with all associated ancillary works. at 16 St Patricks Road, Ballymanaggin Dublin 22
Retention Planning Permission for detached single storey gym/shed & outdoor canopy seating area to rear garden with associated ancillary works.
Retention to change from part use of the house to the entire use of the house for a child care centre.
Retention of alterations to previously granted permission, Ref. SD19B/0105, consisting of an additional two storey bay window to front of house; additional two storey extension to the rear of the house allowing for larger kitchen and bedroom and all associated site works.
Conversion of attic space to storage space in existing 2 storey semi-detached house. Erection of dormer window to the rear elevation, 3 roof lights to front elevation. Gable Dutch hip to be replaced with standard A roof design. Internally a new-stairs to the 2nd floor and the alteration of 1st floor to accommodate new floor plan layout with minor alteration to fenestration and all ancillary site works. Maintain connection to existing county council soil and surface water.
The development will consist of 1) a side garage conversion and second storey side extension, 2) a single storey lean to extension to the rear, 3) the widening of the vehicular front entrance, 4) a front porch extension 5) a roof light on the south facing hipped roof and 6) all site ancillary works.
Alterations to previously approved, but not yet constructed development under planning Ref. Ref. (SD11A/0135 - Block A was approved as a primary health care building and will remain so; Block B was approved as a nursing home building and permission is now sought to use that building as a primary health care us; Permission is also sought for an external café and relocation of sub-station from entrance area to a position on Fonthill Road); alterations to Block A of 3,249sq.m consist of minor internal reconfiguration to stair No. 1 cores, position of lift shafts and circulation areas; alterations to Block B of 3,521sq.m (previously approved use as a nursing home) to facilitate the use as a primary healthcare centre include internal reconfiguration to provide 10 consultation rooms; 37 offices; 7 clinic rooms; 4 administration/reception; 4 large group rooms and associated ancillary uses including a new external lift and stair to car park; a total of 149 car parking spaces are to be provided for the proposed development; this includes 125 spaces at basement level including 6 accessible car parking spaces and 24 spaces at surface level including 3 accessible car parking spaces; alterations to the previously approved permission also include for 20 new bicycle parking spaces; new plant space and storage; the previously approved entrance from Boot Road/Convent Road providing pedestrian, cycle and vehicular access including previously approved landscaping, remain as approved.
Modifications to the Primary Healthcare Centre as permitted under Reg. SD11A/0135 (An Bord Pleanala Ref. PL06S.239890) and SD20A/0054 comprising of relocation of existing bus shelter on Boot Road (Bus Stop No. 3465) by c.75m northwards and construction of a new stainless steel and glass bus shelter including a double-sized internally illuminated advertising panel; Construction of an external stair core from the basement car park to surface level with associated changes to car parking layout.
Change of use of portion of the ground floor (29.48 sq m) from office to residential accommodation and retention permission for the incorporation of the internal courtyard (7.16 Sq m) as part of the residential accommodation.
Change of use of the first floor from offices in No. 43 and restaurant in No. 44 to 3 two bedroom apartments and 1 one bedroom apartment and an interconnecting doorway between the two existing ground floor shop at No. 43 and the takeaway food shop at No. 44 Tower Road; new stone-clad shopfront with an aluminium glazing system and signage in the fascia over each unit.
Attic conversion with dormer window to the rear. Flat-roof porch extension to the front. Single-storey flat-roof extension to the rear. Installation of two garden rooms to the rear of the property with a pergola linking both.
Relocation of the temporary gas powered generation plant for a further two years from lands to the rear of the Takeda Ireland complex to the east of the site; to lands to the immediate north-west within the Edgeconnex campus and to the immediate east of the data centre granted and built under Reg. Ref. SD17A/0141 and SD17A/0392; the relocated temporary gas powered generation plant will be enclosed within a walled yard of 2,836sq.m containing 12 generator units with associated flues (each 15m high) that was permitted for a period of three years on the 15th May 2017 under condition No. 4 of permission granted under Reg. Ref. SD17A/0027; vehicular access to the generation plant will remain from the permitted service road into the Edgeconnex site and Grange Castle Business Park as originally permitted.
Construction of single storey extension to rear and side of existing dwelling, and all associated siteworks.
The development will consist of a fuel tank set down area and canopy (approx. c.279sqm and c.4.8m in height) at Microsoft Grange Castle Campus. All other site development and ancillary works.
Planning permission is sought for retention of single storey building to rear garden for home office / playroom use and all associated site works.
Clonmill Limited are applying for Permission, for the proposed amalgamation of shop units 19 and 20, at The Mill Shopping Centre Clondalkin, Ninth Lock Road, Clondalkin, Dublin 22. The proposed development will consist of the amalgamation of the existing retail Unit 19 (c. 78 sq.m) and existing retail Unit 20 (c. 74 sq.m) into a single retail unit 19/20 c. 155 sq.m through the removal of the existing wall between the two units. The existing entrance to Unit 20 is to be closed with a partition wall and the shop front glazing to be removed and replaced with a glazing unit to match height to Unit 19. Including all associated site services and development works.
Retention permission consists of the construction of a canopy structure to the west of the main school building.
Retention of construction of canopy structure to the west of the main school building.
Change of use and amalgamation of Unit 24A with Dunnes Stores Cafe (units 25/26) to increase the cafe's size from 257sqm to 368sqm, including an extended mall seating area and all other associated site works/services
Retention and completion of amendments to the permitted internal road layout, internal fencing and other ancillary internal layout amendments that were permitted under SDCC Planning Ref. SD18A/0298.
Construction of a temporary logistics and storage facility within the Clonburris NorthWest Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The facility includes the provision of a logistics facility comprising a warehouse (single story pitched roof c.11.356 meters in height) and adjoining unit (single storey pitched roof c. 6.22m in height) with a combined Gross Floor Area of 1,411sq.m; The provision of a single-storey ancillary office and staff facilities to include an office (25sq.m), canteen/ changing area (24.8sq.m), and WC (9sq.m); Vehicular and pedestrian access from the Fonthill Road (R113) to the east, 24 car-parking spaces, 5 HGV setdown parking spaces and turning/loading areas and 18 bicycle parking spaces; All ancillary site development works including attenuation, footpaths, lighting, landscaping boundary treatments and signage; The logistics facility will exist for a temporary period of up to 10 years to facilitate the delivery and storage of building materials throughout the construction phases of the development of the entire Clonburris Strategic Development Zone; The logistics facility will not be open to the general public; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015 all on wider lands bounded generally by Thomas Omer Way (L 1059) to the north, the Dublin-Cork railway line to the south, the Fonthill Road (R 113) to the east and undeveloped lands to the west.
The proposed development will consist of the internal alterations to the existing ground floor retail unit and external alterations to the Ninth Lock Road elevation through the reopening of existing blocked window openings, the formation of a new entrance doorway, and the installation of a new glazed shopfront, fascia and illuminated signage, and all associated site works.
Construction of a single storey pitched roof (with 'Velux' roof windows) extension to the side of house and conversion of attic space to include a dormer type roof window to side and 'Velux' windows to rear of existing roof.
The proposed development will consist of the temporary storage of inert soil and stone generated by construction and development activity and imported as waste under licence or as by-product (in accordance with Article 27 of the European Communities (Waste Directive) Regulations 2011 (as amended)) as a non-waste by-product on a 3.87-hectare site within the Clonburris North-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The proposed development will include for: i. The provision of temporary soil and stone storage for later re-distribution and use within the Clonburris SDZ; ii. The proposed fill material will be stored in 2 no. stockpiles of c.90,000m3 and 18,000m3. iii. The proposed 2 no. stockpiles will provide for a combined c.108,000m3 of material to be stored on site and will be c.6m in height; iv. Vehicular and pedestrian access will be provided via approved access off the Fonthill Road (R113), which will also serve the Logistics Facility as approved under Reg. Ref. SDZ23A/0016. The proposed inert soil and stone stockpiles will be temporary in nature and will be operational for an anticipated 7-year time period. It will then be decommissioned, and the subject lands will be restored and developed in line with the Clonburris Strategic Development Zone Planning Scheme 2019.
(i) A change of use from existing residential dwelling to guest house, and (ii) the provision of 1 no. accessible bathroom at ground floor level. The development includes drainage, landscaping, boundary treatments and all ancillary works needed to facilitate the development.