To construct a building consisting of a meeting room on the ground floor and a gym on the first floor including associated site worksDecision record indexed
A dwelling house and septic tank, to refurbish the existing derelict dwelling on site and convert it to a domestic garage and to relocate the existing entrance to the siteDecision record indexed
Two soiled water tanks, alterations to waste water and surface water drainage, RETENTION of eight dog runs, RETENTION of pump house, office/canteen, smoking hut, portaloo, laundry and two sheds. All structures are single-storey structuresDecision record indexed
1. Carry out renovation works to cottage to include raising of roof height and the addition of new external openings 2. Install domestic wastewater treatment system and polishing filter to current EPA guidelinesDecision record indexed
For the erection of 1 no. 500kw wind turbine(hub height 50.00m / blade tip height 73.50m and the construction of a 14.00 sq.m control building / electrical sub-station, site entrance, site access track and hard standing and all ancillary works.Decision record indexed
The construction of a 21 metre high free standing communications structure (total height with antennas 21.1 metres) carrying telecommunications equipment, together with associated exchange cabinets, fencing, access gate, hedgerow removal, hardstand entrance and all associated site development works. The development will form part of Eircom Ltd. existing telecommunications and broadband networkDecision record indexed
(1) the construction of a new 10 span A-roof shed complete with milking parlour, dairy, store, electrical room, office, cubicles, effluent tank and meal bin, collecting area and holding pins. (2) Retention permission for as built 7 span lean-too shed and effluent tank. (3) Permission to demolish existing shed and build a new 7 span lean-too shed and extend the existing effluent tank and all associated site worksDecision record indexed
Cattle house with scraper passage, cubicle beds and calf house with straw bedding and Permission for round slurry Store and all assoicated site worksDecision record indexed
To construct Milking parlour incorporating dairy, plant, storage, meal bin, rain water storage tank, holding yard with crush/drafting yard, underground effluent tank with flow channels and all associated site worksDecision record indexed
To construct Cubicle shed with slatted tanks and all associated site works. Demolition of cubicle shed and open tank also requiredDecision record indexed
The construction of a new Inlet Pump Station, a new Balance Tank, and a new Aeration Tank to replace the existing infrastructure. The upgrade also includes new Air Blowers, a new Sludge Tank, a new Final Clarifier, new Chemical Storage facilities and a new Electrical Control Panel. The upgrade also includes the construction of a reinforced concrete bund to house the upgraded Wastewater Treatment Plant and all associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the applicationDecision record indexed
The demolition of a single-storey porch to the front and demolition of chimney, demolition of shed to rear, alterations to elevations, external works and all necessary site services and site development works, erection of new porch, erection of rear single storey structure, alterations to front dormer windows to roofDecision record indexed
The construction of a milking parlour building incorporating: dairy, plant, storage, meal bin, rain water storage tank, milk silo, holding yard with crush/drafting yard, underground effluent tank with flow channel and all associated site worksDecision record indexed
For ten-year permission for development. The development will consist of the provision of a temporary prefabricated welfare unit on the site of Callan Water Treatment Plant including associated site works. The planning application is accompanied by a Stage 11 Appropriate Assessment (Natura Impact Statement)Decision record indexed
The development will consist of the erection of a 36m tall Telecommunication Lattice Support Structure carrying antennas and dishes together with associated ground-based equipment all enclosed in security fencing with proposed site access taken from an existing site access from the L-6617 and all ancillary site worksGrounds not yet categorised
To construct a 2 storey dwelling, garage, entrance, wastewater system, borehole, soakpits and all other associated site worksGrounds not yet categorised
TO CONSTRUCT A 2 STOREY DWELLING, GARAGE, ENTRANCE, WASTEWATER TREATMENT SYSTEM, CONNECTION TO MAINS WATER SUPPLY, SOAKPITS AND ALL OTHER ASSOCIATED SITE WORKSDecision record indexed
The demolition of an existing dwelling and to erect a single-storey replacement dwelling. The works are summarized as – a) the demolition of existing two-storey dwelling b) the demolition of existing farm buildings c) the provision of a new vehicular entrance d) the decommissioning of an existing septic tank and site percolation area e) the provision of a new on-site sewage treatment plant and associated site percolation area f) the adjustment of site levels g) the construction of a new single-storey replacement dwelling with domestic garage and carport and to carry out all associated site development works.Decision record indexed
To construct a 2 storey dwelling, garage, entrance, wastewater system, connection to mains water soakpits and all other associated site worksDecision record indexed
Foylatalure and Courtstown, Tullaroan, Co. Kilkenny
For (A) permission for removal of part of site access road and reinstatement with topsoil (B) retention permission for part of upgraded farm track as part of the overall site access road to the existing wind farm. The works comprise alterations to the site access road to the existing wind farm at Foylatalure and Courtstown, Tullaroan, Co. Kilkenny (permitted under parent planning permission PL.Ref. No. 12/378 as amended by PL.Ref.No. 13/09).Decision record indexed
A change of the house type from that granted under planning permission reference number 21/790 & all associated site development worksDecision record indexed
The construction of a slatted shed with feeding area and cubicles and all associated site works. PERMISSION FOR RETENTION for (i) loose shed, (ii) calf shed, (iii) loose shed with slatted feeding area, (iv) dairy plant room, (v) collecting yard, (vi) walled silage slabs and all associated site worksDecision record indexed
To construct a single storey dwelling, new entrance with gates and piers together with a new wastewater treatment system and all associated site worksDecision record indexed
For a new four bedroom single storey, split level dwelling, on site wastewater treatment system and all associated site works, site access as permitted under Planning Register Reference No. P19/450Decision record indexed
For Upgrade Works to the Entrance to Ballykeeffe Woods from the Regional Road R695 to include regrading to provide new dwell area, set back of existing Boundary Wall to improve sightlines, new wing walls, new surfacing & signage along with all associated site development worksDecision record indexed
To demolish existing dwelling and construct a replacement 1 1/2 storey dwelling with increased set back from the public road, close existing entrance and provide entrance in new location with improved sightlines onto the N76, car garage, wastewater treatment system & polishing filter, soakpits all other associated site worksDecision record indexed
Permission for (a) 2 No attic dormer roof windows to front of house and (b) flat roof single storey side/rear extension (23.2M2), all to my house locatedDecision record indexed
Of extensions to existing dwelling which include 1) conversion of attic to habitable floor space including dormer windows and velux roof lights, 2) Front porch and 3) extensions to rear of dwelling and permission for retention of garage and store to rear and side of dwelling and permission for retention of treatment system and percolation area and all associated site worksDecision record indexed
To carry out internal alterations to existing dwelling, decommission and replace existing septic tank and percolation area with new Secondary Treatment System and Soil Polishing Filter and all associated site worksDecision record indexed