The demolition of the 16sqm rear extension (total area of existing house is 64sqm), construction of a single storey render clad extension (approx. 111sqm) to the rear of the retained portion of the existing house, changes to selected window opes, external wall finishes and roof of the existing house, a bored well, a new site specific treatment unit and percolation area replacing an existing septic tank and soak pit and all associated site works
Retention of dormer bedroom extension floor area 19m2 and retention of garage to rear of dwelling of 19.5m2 floor area
Dwelling, garage, waste water treatment system to EPA standards, entrance and associated works
The construction of a new dwelling, treatment unit and soil polishing filter, new well, new entrance onto existing lane and associate works
Amend previously permitted development as granted under P.A. Ref. 18/1158, alterations to the internal site layout, amended café and ancillary facilities, orientation space, covered exhibition space, exhibition/craft space, WC and changing facilities, relocation of service yard, staff parking and relocation and reduced size of electricity sub-station & switch room, provision of disabled car parking area, administrative office, refuse store, fuel store and boiler room, children's play area, external lighting, roof mounted solar panels to new café and orientation space, amended wastewater treatment system, amended storm water system, landscaping to Walled Garden, landscaping and all related site development works
Replacement of an existing 12m communications pole for an 18 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network
New dwelling with new roadside entrance from Killacloran Road and all associated ancillary works to create new access road, surface water soakaway and foul water treatment and percolation area
Construct (i) cubicle shed with milking area, storage, slatted tanks and loose straw areas (ii) storage shed (iii) calf shed and all associated site works
For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
Extension of existing farmhouse and permission for change of use of existing farm outbuildings to habitable space and connection back to existing farmhouse. The development consists of connection of existing farmhouse to 3 number outbuildings to provide additional family accommodation and amendments to existing effluent disposal system to EPA Standards and change of use of separate south barn to short term holiday let and separate effluent disposal system for this unit to current EPA standards
To erect an extension to our existing dwelling and upgrade of our existing percolation area all with associated site works and services
Subdivision of existing site, a new dwelling, new entrance onto public road, wastewater treatment unit and soil polishing filter for proposed dwelling, removing existing septic tank and installing a wastewater treatment unit and soil polishing filter for existing dwelling, new well for proposed dwelling and associate works
A dormer bungalow with onsite waste-water treatment and percolation area including driveway, bore well, improvements to existing entrance, landscaping and boundary treatment and ancillary works
Proposed change of use (the removal of condition 2(a) of planning register reference 01/5292) from restricted use as a dwelling to use by all classes of persons
Construction of a storage/machinery shed and all associated site works
Existing extensions to front and rear of existing house and retention of change of use from residential to short-term letting use and associated works
Single storey dwelling, wastewater treatment system to EPA standards, garage, entrance and associated works
Change of house type and site plan previously granted under Planning Ref 16/904 and also the provision of a double garage
Demolition of existing unused cow kennel shed and underground slatted slurry storage shed and for construction of a calf rearing shed and underground effluent storage tank and all associated siteworks
(1) construct extension to the rear of the property and alterations to existing roof to accommodate same (2) permission for removal of existing porch to front and replace same with open porch (3) permission to construct a domestic garage and all associated site works
Single storey extension to the side of my existing dwelling house and all associated site works
Construction of a storey & a half dormer style dwelling, domestic car garage, wastewater treatment system, bored well & all associated site works
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev
Importation of greenfield soil and stone for the improvement of land for agriculture, requiring the importation of 34654 cubic metres of inert greenfield soil and stone over a period of up to 3 years. The development will include resurfacing of the existing private access roadway, temporary wheelwash, temporary welfare cabin and all ancillary site works. The development will be subject to a waste management permit from Wicklow County Council
Construction of a dwelling, garage and effluent treatment system, all together with associated site works
Part demolition of existing extension to facilitate construction of a new single storey side and rear extension to the existing house and all ancillary site works
Construction of a dwelling, garage and effluent treatment system, all together with associated site works
Domestic garage and associate works
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
(1) Retention permission of existing garage, plant rooms and first floor pigeon loft. (2) Retention of part built single story vintage car storage building and Permission to complete same with a flat green roof. (3) All associated site works
Works to existing two storey dwelling (original floor area 70.25sqm) comprising (a) demolition of existing extension (18.25sqm) to rear/side, (b) construction of new two storey extension (120.1sqm) to rear incorporating balcony to rear/side, (c) projecting canopy roof at existing hall door, (d) widening vehicular access gateway, (e) new WWTS to replace existing septic tank, (f) all ancillary site works. Protected Structure - whilst Avon Cottage itself is not a protected structure, the King George post box at the roadside boundary wall is listed - ref.30-02. The post box is unaffected by the proposed works
1. construction of a porch extension. 2. construction of an extension to rear and side of existing house. 3. conversion of existing attic to habitable space to include 2 new dormer windows to rear. 4. changes to all elevations. 5. upgrade of existing treatment system and percolation area to current EPA standards
Erect an extension to existing cubicle shed previously granted under planning ref 17/745 to include underground slatted tanks and all associated site and ancillary works
A dwelling and garage with services along with all associated site development works
An extension to a single-storey detached dwelling. The development consists of retention of attic conversion with dormer window to rear, velux rooflight to front pitch roof, and retention of outbuildings - home office shed and gym
233 sqm single storey dwelling, 48 sqm single storey garage, vehicular entrance via existing agricultural entrance, bored well, effluent disposal system to current EPA standards, all associated ancillary site development works
Increased ridge height and first floor habitable floor area along with minor alterations and revisions to the elevations and internal layout of the existing dwelling originally approved under P.R.R. 07/1500 along with retention permission for the domestic garage & site development works including the retaining wall & concrete yard
New part-pitched, part-flat roof single storey side extension, (total 65sqm) to facilitate a new entrance, open-plan kitchen/living/dining space, WC, utility and storage, as well as modifications of the existing building to accommodate same, fenestration changes to the existing building, a new wastewater treatment system and all site works associated with the development
Change of use (removal of condition number 2 from PRR 3065/00) from restricted use to use by all classes of persons
Reclamation of land through the filling of material comprising clay, silt, sand, gravel or stone on a site having an area of 9.82 hectares, for the purpose of improvement of land, together with site access and roadway and other ancillary site works
Dwelling, garage, waste water treatment system to EPA standards, new entrance and associated site works
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. generators. 6 no. flues 33 metres in height will be accommodated along the south-western elevation of the building. •Construction of a battery compound to provide electricity storage and backup power, located to the northeast of Energy Centre 2, to comprise 27 no. battery arrays within a compound area of c. 0.7 hectares. A single storey MV switch-room building (c. 181 sq.m. GFA) will be provided to the west of the battery compound. •Provision of a transformer compound (to the northwest of Energy Centre 1), along with a welfare building (c.38 sq.m. GFA).•Provision of fuel storage tanks (2 no.) within a bunded compound to the north of Energy Centre 2.•Construction of a new access from the existing estate access road to the north of the site, internal road network and circulation areas, footpaths, provision of 6 no. car parking spaces and 4 no. cycle parking spaces. •Landscaping and planting, boundary treatments, lighting, security fencing and all associated ancillary and site works including underground foul and storm water drainage network (including on-site wastewater treatment system) and utility cables
The construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto public road, demolition of existing stables and associate works
Proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will provide for a revised energy centre design, to include the provision of 8 no. gas turbines (with associated flues of 25.15m in height), 4 no. black start emergency generators and associated transformers, 2 no. single storey fuel oil pump rooms with a gross floor area (GFA) of 90.17sq.m, a single storey air compressor building with a GFA of 88.9sq.m, 4 no. fuel tanks, 2 no. MCC control rooms with a GFA of 44.17sq.m, 3 no. fire water tanks, a single storey welfare, storage, and pump room building with a combined GFA of 160.97 sq.m, a two storey MV /LV building with a GFA of 655.54sq.m, 8 no. 11kV/ 33kV step-up transformers in the north of the site, water treatment equipment, and a security hut, all within a fenced compound. The proposed development includes landscaping and planting, boundary treatments, lighting, security fencing, car parking, and all site works including underground foul and storm water drainage network (including on-site wastewater treatment system), and utility cables, along with all associated and ancillary works. An EPA- Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development
Construction of a bungalow with new entrance and access driveway, new treatment system and percolation area to current EPA standards and all ancillary site works
Agricultural entrance and all associated site works
Construction of a new dwelling, domestic garage, septic tank and percolation area, new well, upgrade existing entrance onto public road and associate works
Extension and alterations to existing dwelling and garage. The works will include A. Construction of 12.6m2 single storey infill extension to connect existing 30m2 garage (now being converted) to existing 174m2 single storey dwelling. B. Conversion of existing garage to become part of the main dwelling which will contain a new bedroom and study and alterations and modifications to external elevations including 2 new rooflights. C. Minor alterations and modifications to existing dwelling layout and elevations and all associated site works
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works