For changes to previously granted permission ref: 21/632. The changes are namely 1. change of link building flat roof to slate pitch roof, 2. widening of link building, 3. changes to internal layout of apartments, 4. changes to windows on south, west and north facade, 5. changes to finishes of barn roof and walls, 6. PERMISSION to demolish the existing cottage, and all associated ancillary and incidental works
For conversion of existing single storey cottage into 3 No. self contained apartments which will comprise the addition of a second storey to the existing building, the construction of a new 2 storey to the rear of the existing building together with all associated ancillary and incidental works
For construction of additional workshop space, tea rooms, sanitary facilities, all as an addition to the existing woollen mills together with all associated ancillary and incidental works
To change the previously granted permission for construction of additional workshop space, tea rooms, sanitary facilities, all as an addition to the existing Woollen Mills (Ref: 21/613). The changes are namely 1. change to the front of the building to be positioned directly behind an existing wall with attached EIR cabinets. 2. Change to front facade to suit the new position. 3. Change to pitches and position of the roofs to line up with the proposed dwelling on the left, as well as all associated ancillary and incidental works
Is sought to construct a stand alone, single storey Office unit, at the rear of Workshop/Tea Rooms/Sanitary facilities which are under construction. Planning Permission reference: P23/473, and all associated ancillary and incidental works. This unit will be part of Woollen Mills Ltd,
To Extend the Appropriate Period of Planning Permission P09/849 for mixed use tourism, recreational and commercial development
To alter the rear extension design granted under planning reference P23/608 to include revised layout, elevations and roof design at existing dwelling
To erect an extension to the rear of house and all associated site works
To construct a workshop and storage together with associated site works at the rear of the house
To erect a dwelling house, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works
To construct a dwelling house, entrance, waste water treatment system and percolation and associated siteworks
To erect a dwellinghouse, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works
For a new dwelling, wastewater treatment system, polishing filter, entrance and all associated site works
To construct a domestic garage/workshop and associated site works
For a small extension (comprising staff room to existing creche facility and all associated site works
- the development will consist of: A) demolition of part to side and of rear of existing building B) construction of extension to rear of existing building primarily consisting of a chapel C) reworkings interior layout of existing building D) construction of new residential accommodation building for the community and associated site works
To refurbish an existing house and to construct a ground floor and a dormer roof extension, which includes the provision of a supported living accommodation unit, and all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application
To refurbish an existing house and to construct a ground floor and dormer roof extension and a Granny Flat extension to the existing dwelling house and all associated site works
To RETAIN an Outbuilding/ Shed and all associated site works.
To construct a garage with first floor study and link to their existing dwelling house along with all associated site works
To remove existing septic tank and install an effluent treatment system and sand filter infiltration area and all associated site works
For a two-storey detached house, new site entrance, new septic tank connected to existing waste water treatment system and all associated works. A Natura Impact Statement will also be submitted to the Planning Authority
To RETAIN private domestic garage at the rear of house and all associated site works
To re-surface with Astroturf existing pitch and gravel running track, provide fencing to astroturf playing area and to erect flood lighting to same and all associated site works
For Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application
To alter, renovate and extend dwelling house and associated site works
To construct a two storey extension to the rear and side of dwelling house and associated site works
To demolish existing sheds to rear of dwelling house and to construct a two storey extension to the rear of dwelling house and associated site works
To demolish a hayshed part of agricultural structure and replace with larger shed extension, upgrade cattle handling facilities, construct an underground slurry/effluent tank, 2 No silage slabs, silage effluent tank, dungstead and associated site works
To develop swimming platform, yoga deck, outdoor recreation area and changing stalls associated site works. A Natura Impact Statement accompanies this application
To develop a swimming platform, and associated site works. A Natura Impact Statement accompanies this application.
For development at the Further Education and Training Centre, Drewsborough Road, Scariff, Co Clare the development consists of the erection of 2 no. prefabricated classrooms and 1 no. prefabricated isolation room and all associated site works for educational use
Of the development consists of the erection of 1 no. free standing totem sign
To RETAIN alterations to elevations and roof of existing house together with all associated site works
Of existing farm shed and cattle crush, and PERMISSION to erect a new vehicular entrance and close up existing vehicular entrance and all associated site works
To construct a domestic garage along with ancillary site works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For an existing extension to the rear of an existing dwelling and (b) PERMISSION to construct a new extension to the rear of the same existing dwelling along with ancillary works
For the change of use from office to a day services location for people with disabilities / healthcare facility / consultation rooms with ancillary offices, together with all associated site works
To renovate and repair existing storage building and for change of use of same to dwellinghouse and connect to mains services and all associated site works. Note this is a protected structure..
To erect a 30 metre high lattice telecommunications support structure together with antennas, dishes and associated telecommunications equipment, and to remove the existing 30 metre high lattice telecommunications support structure together with associated works, located off the R352
To renovate and repair existing storage building and for change of use of same to dwellinghouse and connect to mains services and all associated site works. Note this is a protected structure..
For to erect a dwelling house, entrance, install an effluent system and percolation area and carry out associated site works
For change of use of an existing shop to a Youth Service Centre and renovation of building to meet current fire regulations
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
Of the development which consists of: a) Alterations to the internal road layout and b) Existing road entrance and c) A change of layout of camping pods and d) A change of camping pod type, all from that previously granted Planning Permission under Planning Reference No. P.16/114. It is proposed to retain the development for an indefinite period.
Of an existing garage for private domestic use and all associated site works
Of extensions to side, rear and first floor to existing dwelling house as constructed and to RETAIN garage/workshop to the rear of this dwelling house and all associated site works
Of the conversion of old stables to a guest cottage, connection to existing services and all associated site works. The stables area to the rear of Fort Edward House which is a protected structure
To construct a slatted cattle shed and associated site works