Demolition of 3No. derelict houses and rear outbuildings, erection of replacement 1.8m high concrete block front boundary wall capped and rendered externally, replacement 1.5m aluminium grey painted access gates adjacent to eastern boundary, topsoiling, seeding, landscaping and ancillary works, all to form part of the curtilage of the host bungalow, widening and improvement works to existing vehicular access to host dwelling on 0.29 ha site.
Remove sections of existing grass margin and grass verge and extend concrete apron to front and rear of existing public footpath, install accessible kerb and erect of a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 No. LED illuminated Advertising Panels each of 2.0 square metre area.
The installation of 1.6m x 0.87m x 0.5m (hxlxw) pressure reduction installation and 3.25m (h) vent stack with all ancillary services & associated site works.
Two bedroom, single storey bungalow to side.
Family flat to side.
Modifications to the granted permission (planning reg. ref. SD16A/0210). The proposed Modifications will consist of the addition of 6 No. apartment units (1 No. 1-bed unit,5 no. 2-bed units) on the third floor and set back floor plan on the Fourth Floor, Increasing the overall Apartment Block from 4-storeys to 5-storeys, and from 20 No. apartment units to 26 No. apartment units (consisting of 4 no. 1-bed units, 22 no. 2-bed units ) and 1 community floor space of 160 sqm. No modifications to as-granted 90 no. houses, The overall total no. of units in this development is now increased to 116. All with associated site works, Bin and Bike storage, the site layout has been modified slightly to accommodate additional surface car parking and other ancillary works.
Removal of all existing temporary accommodation and construction of a new 16 classroom part three storey, part two storey primary school (Roll No 19503H); including GP Hall, 2 classroom Special Educational Needs Unit and all ancillary site works. The proposed project also incorporates associated staff car parking, delivery aces, drop off areas, pedestrian/bicycle access, construction of 2 external ball courts, acoustic boundary wall plus additional boundary treatments, landscaping, connection to public services and all associated site works.
Seeking full planning permission for retention of a single storey extension to rear of existing dwelling along with retention of partially completed garage and full planning permission for completion of the garage along with all associated site works
Demolition of existing single storey extensions to front & rear (60.15sq.m) & entire first floor (66.87sq.m). Construction of single storey pitched roof extension to front & flat roof extensions to rear & side (58.82sq.m), new first floor extension to include raising of perimeter walls by 1.45m, raising of ridge height to main roof to front by 0.515m to 7.375m above ground level, matching level of return roof to side, all to create new first floor area (181.46sq.m), complete with new former roof's and velux roof windows to front side & rear, selected stone cladding at ground level, together with internal alterations & renovations and all associated site works.
A development consisting of the construction of a Proposed Agricultural Storage Shed, total area 70m², includes 6 no. Roof-lights and shall include all associated site works.
The proposed development will consist of a Change of use of 4 No. office units in the building to the rear of the site (Block B) into 4 No. one-bed apartments as well as minor elevational changes to install additional windows to side elevations to facilitate this new use. This change will convert the building fully to residential. Works will include construction of a secure bicycle enclosure on the site, as well as all associated and ancillary site and landscaping works. The Site is located at the rear of a second building and site, also in their ownership (Block A) which fronts onto the main street. Block A is a protected structure. Note there are no works proposed to Block A as part of this application.
Extension to the rear and side of the existing house to be refurbished including an undercroft lower floor level below the new extension providing access to the lower rear garden; works to the house will include replacing the existing entrance with a window, a new bay window to the side (southwest) elevation, new vehicle entrance gate, driveway and parking area to the west of the existing house, leading to a new glazed entrance and hall way to the side (existing garden and gates in front of the cottage to be retained); the rear extensions will provide new living/dining/kitchen facilities with the extended and refurbished cottage providing room four bedrooms; the undercroft level will provide a garden level play room as well as storage areas; works include for all services on and under land including a new effluent treatment system and new dry stone rubble boundary walls along the existing road.
We Kingscroft Development Limited seek Planning Permission for modifications to the granted permission (planning reg ref SD16A/0210) at the site west of Citywest Road (N82) South of Garter Avenue/Citywest Avenue, Citywest Dublin 24., The development site is bounded to the east by the N82 Citywest Road, to the North East by Garter Avenue and to the south by lands. The modifications include the change of use of the granted community floor space on the ground Floor of the granted 4 Storey Apartment Building to 1no 2 bed apartment unit and 1no 1 bed apartment unit. All with associated siteworks
Change of use of 3 office units in the building to the rear of site (Block B) into 3 one-bed apartments; minor elevational changes to install additional windows to side elevations; the site is shared with a second building (Block A) which fronts onto the main street, Block A is a Protected Structure (no works proposed to Block A).
Building 'A' fronting Main Street (as per previously granted planning permission, Reg. Ref. S00A/0732) - change of use of first floor 124sq.m of office to 2 x 1 bed apartments of 51sq.m & 55sq.m plus circulation with minimal alterations to the rear elevation only. Also Building 'B' to rear (as previously granted planning permission, Reg. Ref. SD02A/0474) - change of use of part ground floor from office 47.8sq.m to 1 x 1 bed apartment with the addition of one window to the east elevation. The subject site adjoins Protected Structures RPS Ref. 2-203 & 2-204. Car parking (as per Reg. Ref. SD02A/0474) within the development to the rear to remain with 1 space and 1 visitors space to be allotted to each proposed apartment. All site boundaries, landscaping, ramps, steps and access including right of way to be retained. Revisions now made at this Additional Information stage are - Building 'A' is identified and highlighted as as protected structure RPS Ref. 318 - Adjoining protected structures references revised from RPS Ref. 2-203 & 2-204 to RPS Ref. 319 & 326.
The development will consist of a ground floor porch extension to the front, a ground floor rear extension, the removal of tile cladding from the front of the house and the creation of a new vehicular entrance and driveway and all associated ancillary works.
Provision of a temporary primary school by way of construction of 2 prefabricated buildings (c 180sq.m & 390sq.m) on a defined site area (c 0.4Ha) to be enclosed within a 2 metre high welded mesh fencing and access gates with associated site works including provision of new site entrance, car parking, drop off area and hard surface play area. Temporary permission for a period no longer than 3 years is being sought.
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
The construction of a single storey dwelling with waste water treatment system, well, 3 polytunnels in relation to proposed on site Strawberry Farm Enterprise and all site works.
Construction of single storey dwelling with waste water treatment system, well, 3 ploytunnels in relation to proposed on-site strawberry farm enterprise and all site works.
Erection of three bed bungalow; strawberry farming; contain of 1 stable area for horse; food store and forge installation of wastewater treatment plant and percolation area stormwater disposal; new vehicular access and walling; existing well & pumphouse; landscaping and ancillary site works; temporary Retention of an existing 2 bed log cabin; temporary septic tank and temporary vehicle driveway.
Construction of a single storey dwelling, waste water treatment system, well, 3 polytunnels in relation to proposed on site strawberry farm enterprise and all site works.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 15sq.m and is ancillary to the primary retail use.
Minor alterations to the existing Pastoral Centre to include the formation of a new entrance door and enlarged window on the elevation to Fortunestown Road. The provision of a community café service within the existing main room of the building and all associated works including new skylights to north & south faces of the roof & minor site works.
Revisions to permitted house types under Reg.Ref. SD15A/0127 and relates to three house types i.e. house types E1, E3 and E4. It is proposed to modify the ground floor extensions to the rear of 156 of the aforementioned house types.
Single storey side extension with a flat roof for extended living.
Planning permission for attic conversion with dormer to rear roof to accommodate stairs to access attic as non-habitable storage space. Retention permission for single storey shed extension to side of existing house, Retention permission for extended vehicle access all with associated ancillary works
Retention of modifications to the permitted ground floor layout to include a reduction in the area of the permitted hot food deli, the inclusion of a second deli/servery, both selling hot and cold food for consumption on and off the premises, and changes to the associated seating areas, all remaining subsidiary to the overall use of the premises as a service station.
Single storey prefabricated buildings (floor area 870sq.m) to the side/rear of existing Community Centre for community/recreational use.
Change of use of ground floor of property from retail (butchers) to commercial (combining hot food, restaurant and take away). Part demolition of existing rear external wall (ground floor). Proposed new signage. All associated site, internal alterations, drainage and landscaping works.
1 x 50 KWp solar photovoltaic (PV) will consist of 154 PV panels on the warehouse roof and will occupy an area of 254sq.m.
The development comprises of permission for new signage elements and site development works. As well as retention permission for various minor amendments to the development permitted under South Dublin County Council Planning Reference SD22A/0282. Specifically, 3no additional high power electric vehicle charging units, bollards, and 6no parking spaces, relocation of existing light column and previously approved substation, and all associated site development works.
Planning permission for the construction of 2 no semi-detached 2 storey dwellings, including all associated site works, landscaping and SUDs drainage details, increasing a section of the side boundary wall to 1.8m in height, new vehicular access exiting onto Cloonmore Drive, Dublin 24, for each dwelling, all at the site to the side of 1 Cloonmore Drive, Dublin 24.
A high powered electric vehicle charging station consisting of the: (1) Installation of 2 No: Electric vehicle charging bays, and comprising a parking space and electric vehicle charging unit (2) Installation of a prefabricated ESB substation (3) Erection of associated signage (4) All associated lighting, infrastructure and site development works
The construction of a two storey extension (c.70m.sq.) to the side of the existing two storey dwelling along with the widening of the existing vehicular access including dishing of kerb, alterations to the existing boundary treatments and all other ancillary site development works at 1 Cloonmore Drive. Retention permission is also sought for the existing single storey shed (c.35m.sq.) to the rear of the existing dwelling.
For the construction of a single two storey three bedroom detached dwelling to the side of the existing two storey dwelling along with new vehicular access and dishing of existing kerb on the western boundary and all other ancillary site development works.
Construction of one two storey, detached 2 bedroom (plus study) dwelling with 1 off street parking space; relocation of 2 parking spaces from Barrack Court; access roadway; footpath and all associated ancillary works including drainage, boundary treatment and landscaping.
The development will consist of a cemetery including: 8,047 No. traditional burial plots; Columbarium walls; 1 single storey reception building (214.7m2 Gross Floor Area (GFA)) comprising a reception, 1 office, 1 reception store, WC, kitchenette with photovoltaic (PV) solar panels at roof level; and the provision of an ancillary maintenance shed, bin and battery storage structures; The development includes a new vehicular access road from Garters Lane to the N7 /M7 Naas Road, with 2 vehicular access points serving the proposed cemetery; 110 car parking spaces (25 spaces to the east of the reception building and 85 within overflow car park areas to the south of the development); 8 bicycle parking stands; and all associated hard and soft landscape and boundary treatment works including the reshaping of an existing lake and provision of a footbridge; provision of SUDS measures, associated lighting, associated signage, site services (foul and surface water drainage and water supply); and all other associated site excavation, infrastructural and site development works above and below ground.
Change of use of existing acupuncture clinic to a single dwelling house.
(i) Construction of 1 two storey two-bedroom, infill dwelling serviced by private amenity space to rear and 1 on-curtilage vehicular parking space accessible via Barrack Court; (ii) provision of 2 replacement vehicular parking spaces for use by residents of Barrack Court; and (iii) all ancillary works, inclusive of SuDs surface water drainage, site works, boundary treatments and landscaping necessary to facilitate development.
Retention of change of use from retail use to use as a créche/childcare facility.
The Construction of 2 no. 6.50m wide X 3.0m high digital advertising panels (arranged in a V plan 6.50 meters from ground to top of structure) with a 250mm frame all around each
Change of use for part of existing retail unit to a coffee shop and all associated site works.
Permission for development at this site of c. 0.22 hectares at lands. This application site consists of: Parcel A, measuring c. 0.13 hectares, which is principally bounded by the red line rail LUAS tracks associated with the Citywest Campus Luas stop to the north/northwest, existing dwelling No. 19 Citywest Village Avenue to the south, The Mews, Citywest Village residential development and existing dwellings No. 1 The Court and No. 4 The Place to the east and Citywest Village Avenue (road) to the west; Parcel B, measuring c. 0.08 hectares, is principally bounded by The Court (road) to the north, existing dwellings Nos. 10, 12 and 14 The Place to the south, residential development known as Árd Mor Dale to the east and existing dwelling No. 4 The Court to the west; and Two existing parking spaces north of The Court road will be allocated to the proposed childcare facility. The development will consist of the construction of a mixed-use development comprising 12 no. residential units (4 no. apartments and 8 no. houses), coffee kiosk and childcare facility. The apartments, coffee kiosk and childcare facility will be located in a single building arranged across three storeys. The residential units will comprise of 4 no. 1 bedroom apartments (ranging from c.50-52sqm GFA each) with northeast and southwest facing balconies, 4 no. 2 bedroom mid-terrace two-storey houses (c.74sqm GFA each) and 4 no. 3 bedroom end terrace two-storey houses (ranging from c.93-103sqm GFA each) with associated rear private gardens. The apartment building will contain residential bin and bike storage (c.10sqm GFA combined), a coffee kiosk (c.13sqm GFA) with separate bin storage (c.1.5sqm GFA) and outdoor seating area, a three classroom childcare facility with associated office, staff, toilet and laundry facilities (c.135sqm GFA), an external play area (c.67sqm GFA) and external bin and bike store (c.6sqm) serving the childcare facility, all located at ground floor level. The development will also consist of 17 no. proposed car parking spaces, 2 no. existing spaces allocated to the proposed childcare facility, vehicular drop-off zone serving the childcare facility, dedicated bicycle stores in front gardens serving houses, secure visitor bicycle parking throughout, bin storage, open space, public realm areas serving the mixed-use apartment building, hard and soft landscaping, boundary treatment works, photovoltaic panels to houses, pedestrian access, road works consisting of a proposed raised platform/pedestrian crossing over The Court road, provision of Sustainable Urban Drainage systems (SUDS) and all other associated site excavation, infrastructural and site development works above and below ground, including site servicing (foul and surface water drainage and water supply including minor diversion to the existing watermain).
Removal of chimney from existing gable. Construction in side garden of end of terrace 2 storey 2 bedroom dwelling with ground floor front extended, first floor rear extended, new vehicular entrance & partial dishing of kerb.
Alterations to existing two storey detached house to include partial demolition works, new two storey front extension, new single storey rear extension, new chimney stack to rear and side, alterations to existing external window fenestration, energy update including full external insulation system, revised external elevations, increased ridge and chimney stack height to facilitate new slate pitched roof, internal modifications, additional habitable floor area, landscaping works, SuDS drainage and all associated ancillary works to facilitate the development.
Construction of a single storey extension to the south east gable of the existing 4 bed single storey detached bungalow consisting of: a sunroom of 20sq.m (for the existing dwelling) and a 2 bed family flat of 70.91sq.m; the construction of a detached single storey growing shed of 35.00sq.m on lands to the rear of the existing dwelling and all development works.
Retention to retain single storey independent unit in rear garden, and all associated site works.