To erect a warehouse for storage purposes, including all associated site works
Of garden shed erected to the rear of house and for PERMISSION to convert same for use as a "Granny Flat" for private family use and install an effluent treatment system and percolation area and all associated site works
For the construction of a single storey extension to the rear and side of the existing dwelling, together with all associated ancillary and incidental site works
To construct dwelling house, septic tank, percolation area, entrance and all associated site works
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
For to erect an extension to the side of house and all associated site works
Amendments to part of the design of an approved solar farm development (Clare County Council Planning Reg. Ref. P23/60249). The proposed amendments comprise the erection of eight new pole sets and two new masts and replacement of two existing pole sets with two new masts; Placement of overhead lines (comprising 688m) to enable connection to the national grid; Placement of underground cables (comprising 91m) to enable connection from the overhead lines to the approved substation; Alterations to the design, layout and scale of the approved substation; Removal of solar panels (comprising 668sqm) adjacent to the substation; Removal of underground cable route (comprising 1,457m) and associated works for the cable route from the substation to the national grid at Ardnacrusha; and all other associated works
To construct an Agricultural Shed and associated site works
For development, the development consists of the construction of an underslat tank, dairy store and associated site works
For development which will consist of a floodlit Sports Pitch including the use of existing soil on site, together with the provision of boundary fence and other ancillary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
Of commercial store
For the construction of a single storey detached house, a waste water treatment and disposal system, a bored well, a new site entrance and all associated works
To construct a slatted shed and associated site works
To construct a new dormer type house complete with a domestic garage, effluent treatment system and a new site entrance
To RETAIN two existing stables and PERMISSION for change of use of permitted stables (04-1563 refers) to dwelling house, install new waste water treatment system with percolation and all associated site works
For a revised site boundary and revised position of a single 800kW wind turbine, 73 metres to hub height as granted under P10/453 and P15/812
Of existing carparking area, sales cabin office, storage unit and planning PERMISSION for new signage with all ancillary site works
For refurbishment of and extension to an existing derelict cottage, construction of a three bay detached garage a waste water treatment system, a bored well and all associated works
Of (1) conservatory, (2) attic conversion, (3) extension to rear & (4) detached garage
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
To convert the existing attached garage at side of house into extended family room (existing house) including raising height of existing flat roof of garage to match floor to ceiling height of existing family room (house). Permission for retention for the following (1) detached flat roofed double garage at side of house including canopy attached to rear wall of garage. (2) new entrance driveway including front boundary walls and piers, splayed entrance walls including gate piers and entrance gates. (3) timber post and rail boundary fence to front and side boundaries, along public access roadway. (4) mid level blockwork walls at rear and sides of existing house forming enclosed rear parking area. (5) extended gravel stone driveway to front, side and rear of existing house
Of the following development on property at Larkin's Bar, Larkin's Cross - change of use of first floor from residential use to use as consulting/treatment rooms, as constructed detached outdoor function room and additional bar together with all associated ancillary and incidental works
For the construction of a 2 storey extension to the side of existing dwelling, modifications to existing elevations and to internal layout, widening of existing site vehicular entrance and all associated site works
To construct a new dwelling house, site entrance, on-site wastewater treatment system and all associated site works and services
For a dwelling house, entrance and all associated site works
To RETAIN change of use of an existing agricultural storage building to a commercial warehouse building, the RETENTION of the construction of two commercial warehouse buildings, all to the rear of the site, all to be used for storage ancillary to the adjacent Limerick Blow Moulding factory building and all associated site works both above and below ground
To RETAIN a ground floor extension with alterations to existing house and for planning PERMISSION to construct a detached garage building with new entrance, for insertion of dormer windows and alterations to existing attic space, and a yoga studio extension to first floor flat roof to existing house, solar panels and all associated site development works
For a new part single storey, part two storey dwelling house with garage and associated landscaping boundary walls, fences, entrance, and all associated site services and works
For the conversion of the existing outbuildings into 2 No. 2 Bed apartments, 1 No. 1 bed apartment and 2 No. Studio apartments, demolition of the remainder of the existing outbuildings as indicated, onsite wastewater treatment system, connection to necessary services, together with all associated ancillary and incidental site works
To install new wastewater treatment system, puraflo filtration and percolation area and all associated site works
For development which will consist of the construction of a detached domestic single storey garage and home gymnasium for use ancillary to the enjoyment of the existing dwelling house on the site and all associated site works
To construct an extension to the rear and side of the existing house
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
For a new single storey dwelling house, new domestic garage, new site entrance adjacent to the existing site entrance to serve the existing neighbouring dwelling at Kincora House and all ancillary site works above and below ground
To RETAIN change of use of room, for use as a morning sessional pre-school service and PERMISSION to use the same room for an afternoon sessional pre-school service
For the following: 1. Demolish existing shed to facilitate a rear extension to the existing dwelling. 2. Widen the existing vehicular entrance. 3. Elevational changes to the house. 4. All ancillary site works
For development which will consist of: 1. The removal of the front boundary wall to provide vehicle access for private parking purposes with suitable surface finish, 2. And all associated site works
To construct a Slatted Shed and associated site works
Of a) 1st floor conversion dormer windows, rear extensions, alterations and fenestration changes b) detached garage c) installation of new wastewater treatment system and location of soil polishing filter, d) boundaries as constructed together with all ancillary site development works and services
For the construction of a storey and a half dwelling house, detached domestic garage, wastewater treatment system, percolation area, new entrance, bored well and all ancillary site works
Of a) enlarged dwelling house from what was granted under P05/1935 b) 1st floor attic conversion c) chimney location, installation of roof windows and fenestration changes d) 2no. domestic sheds along with boundaries as constructed together with all ancillary site development works and services
For the construction of a dwelling house, garage and proprietary waste treatment plant, bored well, new entrance and including all ancillary site works
For the construction of a single storey dwellinghouse, garage & proprietary waste treatment plant, bored well, new entrance and including all ancillary site works
For the construction of a single storey dwelling house, ancillary garage, vehicular entrance with new boundaries, new effluent treatment plant and all ancillary site works
For the construction of a dwelling house, new entrance and all associated site works
To construct dwelling house, bored well, garage, waste water treatment system, percolation area, entrance and all associated site works
For a period of ten years for a residential development on land bound by the Corbally Road to the east and access road to Carriag Midhe to the south in the townland of Knockballynameath, Athlunkard, Co. Clare. This is a Large Scale Residential Development LRD Application. The proposed development includes: (i) Demolition of existing ruinous house / shed structures; (ii) Construction of 101 no. residential units including 49 no. houses and 52 no. apartments comprising 28 no. one bed units; 24 no. two bed units; and 49 no. three bed units; (iii) Landscaping works including provision of (a) open space and kick about areas; and (b) new pedestrian and cycle connections; (iv) Vehicular access onto the Carraig Midhe Estate road; (v) Relocation of the existing agricultural entrance onto the R463 regional road further north beyond the development site; and (vi) Associated site and infrastructural works including provision for (a) 2 no. ESB substations and switchroom; (b) car and bicycle parking; (c) public lighting; (d) bin storage; (e) temporary construction access; and (f) varied site boundary treatment comprising walls and fencing. The planning application is accompanied by a Natura Impact Statement. All planning application documentation and information is available to view online at the following website set up by the Applicant: https://athlunkardlrd.ie
To construct a dwellinghouse, garage, splayed entrance, bored well, wastewater treatment system and polishing filter, and ancillary site works
For development which will consist of planning permission for a period of 10 years to construct and complete a Solar Energy development with a total site area of 36.70 hectares, to include the construction of PV panels mounted on metal frames, a substation, inverter substations, internal access tracks (new and upgraded), underground cabling, security fencing with CCTV cameras and access gates, a temporary construction compound and all ancillary grid infrastructure and associated works. The Solar Farm would be operational for 40 years. The proposed grid route will connect the substation at the application site to the existing grid infrastructure at Ardnacrusha Power Station via a 38kV underground cable which is 1.2km in length (320m of which is on the local road L3056). A Natura Impact Statement (NIS) will be submitted with this application