CHANGE OF HOUSE LOCATION, SITE BOUNDARIES AND SITE ENTRANCE TO PREVIOUSLY GRANTED UNDER P16/748 TOGETHER WITH ALL ANCILLARY SITE WORKSGrounds not yet categorised
Planning Permission to demolish the front porch and the single storey wing to the side of the existing dormer dwelling and construct a new larger single storey wing in its place, together with elevational alterations to the existing dwelling and connection into existing services.Decision record indexed
Construct A New Storey and a half Type Dwelling House, Proprietary Effluent Treatment System, Soil Polishing Filter/Percolation Area Including All Associated Site Development WorksDecision record indexed
Construction of a 4 bay cattle slatted shed with underground slurry storage tank together with cattle crush, dry storage area and all associated site worksDecision record indexed
Construction of a cattle slatted shed with underground slurry storage tank together with cattle crush, dry storage area and all associated site worksDecision record indexed
ALTERATIONS, MODIFICATION AND REFURBISHMENT OF THE EXISTING SINGLE STOREY DETACHED DWELLING HOUSE ALONG WITH THE CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE REAR AND SIDE, NEW PROPRIETARY WASTEWATER TREATMENT UNIT, IN LIEU OF THE EXISTING SEPTIC TANK, NEW POLISHING FILTER/PERCOLATION AREA, NEW DETACHED SINGLE STOREY SHED, ENCLOSURE STRUCTURE FOR THE AIR TO WATER UNIT AND BINS, ALONG WITH ALL ASSOCIATED SERVICES, SERVICE CONNECTIONS LANDSCAPE AND SITE DEVELOPMENT WORKSDecision record indexed
RETENTION OF EXTENSION TO REAR OF THE MAIN DWELLING GRANTED UNDER P08/282; ART STUDIO CONSTRUCTED IN PLACE OF GARAGE GRANTED UNDER P08/282; EXTERNAL DINING AREA, CHANGES TO WINDOW STYLE TO THE FRONT AND REAR OF THE MAIN DWELLING AND ASSOCIATED WORKS; WALL AND GARDEN FEATURES AND CHANGE TO ROOF PLAN GRANTED UNDER P08/282Decision record indexed
Construction of a detached dwelling house, domestic garage, proprietary treatment system and all associated site works at the above address.Decision record indexed
Construct a domestic garage and independent living unit associated with the existing dwelling house together with associated site servicesDecision record indexed
DEMOLITION OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF NEW DWELLING HOUSE, UPGRADING OF EXISTING WASTE WATER SYSTEM AND ASSOCIATED SITE WORKSDecision record indexed
Reinstatement of ground works for proposed agricultural access, provide access via existing private access road, permission to construct a private dwelling house with an effluent treatment system including all ancillary site works.Decision record indexed
Retention of staff accommodation & amenity rooms adjacent to existing sheds, (2) retention of rear elevation alterations where proposed dining room granted under P90/1135 was omitted in lieu of 2 no. access patio doors, (3) renovate and extend existing gate lodge, (4) install 6 no. of glamping pods to be used in conjunction with existing guest house/ enterprise, (5) upgrade existing septic tank & percolation area for existing guest house, (6) and to install new septic tank and percolation area for the gate lodge together with all ancillary site works.Decision record indexed
FILLING OF LANDS WITH INERT WASTE CONSISTING OF SOIL AND STONE MATERIAL TO IMPROVE LAND FOR AGRICULTURAL USE (APPLICATION AREA = 2.0 Ha, VOLUME 25,000 TONNES OVER 10 YEARS) AND ALL ASSOCIATED ANCILLARY WORKSDecision record indexed
Planning Permission for land reclamation and improvement works over an area of 2 acres, following the successful reclamation completed under P12/631. The works will consist of the stripping of top soil, the importation and levelling of subsoil and clean fill and the recovering with top soil together with all ancillary site works.Decision record indexed
Construction of new dwelling house and domestic garage with wastewater treatment system along with all necessary site works and ancillariesDecision record indexed
CONSTRUCT EXTENSION AND CARRY OUT ALTERATIONS TO EXISTING DWELLING HOUSE TO INCLUDE A SELF CONTAINED UNIT, TOGETHER WITH ASSOCIATED SITE WORKSDecision record indexed
DEMOLITION OF EXISTING DWELLING HOUSE ON SITE AND CONSTRUCTION OF A NEW PRIVATE DOMESTIC DWELLING HOUSE, EFFLUENT TREATMENT UNIT AND PERCOLATION AREA TOGETHER WITH ASSOCIATED SITE WORKSDecision record indexed
Construction of a new extension to the side and rear of the existing dwelling house and demolition of existing rear extension along with necessary modifications and alterations to the existing dwellingDecision record indexed
Change of use from holiday home to permanent residential dwelling, including renovation and extension of existing property together with all ancillary site works.Grounds not yet categorised
CONSTRUCT A PRIVATE DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER TOGETHER WITH ALL ANCILLARY SITE WORKSDecision record indexed
Retain access road as constructed, construct stables, tackroom/canteen, fodder store with connection to effluent treatment system together with associated site servicesDecision record indexed
CONSTRUCT A PRIVATE DWELLING HOUSE DOMESTIC GARAGE PROPRIETARY EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER TOGETHER WITH ALL ANCILLARY STIE WORKSGrounds not yet categorised
(Faiche An Teampaill) Rushbrook, Clogher, Westport Co. Mayo.
Full planning permission for the following: (1) Demolish existing detached dwelling house, (2) Construct replacement detached dwelling house, together with all associated site works at (Faiche An Teampaill) Rushbrook, Clogher, Westport, Co. Mayo.Decision record indexed
CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH ASSOCIATED SITE SERVICESDecision record indexed
(1) To construct a hardstand/boat storage area, (2) To construct a floating pontoon with link to the shore and (3) To alter the Western side of the existing slipway so as to provide a vertical wall and increased slipway width, (4) To include rehabilitation works when vacation of the site is undertaken, together with all ancillary site works and services at Rosmoney, Westport, Co. Mayo. A Natura Impact Statement & MARA Consent has been lodged with the application.Decision record indexed
CONSRUCT A HARDSTAND/BOAT STORAGE AREA. TO CONSTRUCT A FLOATING PONTOON WITH LINK TO THE SHORE. TO ALTER THE WESTERN SIDE OF THE EXISTING SLIPWAY SO AS TO PROVIDE A VERTICAL WALL AND INCREASED SLIPWAY WIDTHDecision record indexed