Plan 8 Architects (www.plan8.ie) are applying, on behalf of our clients Robert & Gosia Freeze, Kerrie & Shane Doyle, Michael & Susan O’Neill, and Ryan Esmonde for Retention Planning Permission for the following: • Retention of Existing front boundary treatments and vehicular entrances. • Retention of Existing side boundary treatments. Planning Permission sought for the following: • Set back roadside boundary of dwelling No. 04. • Provision of new 2m wide roadside setback to allow for the future provision of a public footpath. At Ballyfree East, Glenealy, Co. Wicklow.
Extend the appropriate period of a permission - 15/695 - Permission for demolition of existing 43sqm dwelling and construction of replacement dwelling. Permission for conversion of existing out building for use as a store, studio and workshop for domestic use along with elevational changes to connect it to the main dwelling. Conversion of another outbuilding to a domestic garage. Existing entrance to be replaced with a pedestrian entrance only and new vehicular entrance created, new well, new waste water treatment system to EPA 2009 standards and associated drainage an site development works
As constructed side extension to existing dwelling and all associated ancillary site works and services
Entrance porch and balcony and raising of lower section of dormer roof to match height of main roof and provision of two dormer windows to new ensuite shower rooms within the extended roof space
A proposed porch at the main entrance, additional first floor level, balconies to the east & west facing elevations, new roofs, refurbishment of the existing Ground Floor, replacement wastewater treatment system and all associated site works
(a) 19 No. dwellings comprising 10 no. (113 sq.m.) 3 bedroom dormer bunglaows, 07 no. (138 sq.m.) 4 bedroom dormer bungalows and 02 no. (102 sq.m.) 3 bedroom dormer bungalows.(b) New pedestrian links. (c) New vehicular entrance off R752. (d) Connection to all public services. (e) All necessary ancillary and site works to facilitate the above
(1) a two-storey side extension including provision of 2 no. new dormer windows and (2) a new single-storey porch with an additional first floor dormer window over to the front of the existing dwelling
The following works - (1). 4 no detached dwellings on individual sites ( which will include 2 separate house types ) (2). The provision of a proposed garage for sites 1, 2 and 4. (3) The provision of an office/shed/studio for site 3. (4) A Proposed secondary treatment system to current EPA guidelines and percolation area to each of the 4 sites.(5). Connection to all services. (6). The Provision of a new vehicular entrance off the public road and internal access road (7). All ancillary works, inclusive of tree-planting, hard/soft landscaping, boundary treatment, provision of solar panels and any drainage infrastructure, necessary to facilitate the development/sites and all associated site works
(1) a two-storey side extension including provision of 2 no. new dormer windows, (2) a single-storey rear extension and (3) a first floor extension over previously approved porch structure (Reg. Ref. 19/1346) to the front of the existing dwelling
1. change of house type to previously approved planning register ref 18/233. 2. Revised location of vehicular entrance to above dwelling, 3. Proposed new garage of 20sqm, 4. together with all necessary ancillary works to facilitate this development
(a) change of use from residential to commercial use (coffee shop and ice cream parlour), (b) retention and completion of 14sqm rear extension to house new customer toilets including 1 no. fully accessible W.C., (c) provision of a total of 5 no. velux windows to the side (north and south) elevations and (d) upgrading of the existing effluent disposal system to current EPA standards and all associated site works
New side extension to existing dwelling, new front elevation extension to existing dwelling, new flat roof to rear of existing dwelling, removal of existing window to side elevation, new window layout to existing rear elevation, new metal sheeting roof cover on existing dwelling section, removal of existing sewage system, new wastewater treatment unit & soil polishing filter, upgrading of existing entrance and associate works
Removal of existing septic tank and installation of new wastewater treatment unit, polishing filter to current standards and associate works
(1) alterations and revisions to the elevations and layout of the as-built dwelling along with services on revised site boundaries as opposed to that granted under Planning Register Reference 11/4213 and (2) Permission to erect a single storey extension to the side of the existing dwelling along with all associated site development works
1. The demolition of 2 No. existing timber sheds (previously used as part of Kerry Foods plant operations). 2 The erection of two new storage unit facilities (each measuring c 409m2), new entrance and access road, new security fencing to perimeter as well as parking facilities and all associated site works
Development at this site: Coast Guard Station Cottages, Ballynacarrig, Co. Wicklow, A67 RX27 (which is a Protected Structure) the development will consist of revisions to the existing Grant of Permission (Reg. Ref. 21/1388) as follows: Revision of site application boundary to reflect ownership of applicant; Full demolition of the existing non-original extensions to side (single storey with mezzanine floor) and front (single storey bay windows with canopy); Revisions to the extension granted previously to the side and rear of the Cottage including reduced size/ altered footprint shape and changes to roof (part pitched, part flat) and elevation design, This will be a single storey extension to side and rear of Cottage with undercroft storage shed to rear, Overall size of Cottage will increase from 95sq.m to 109sq.m (previously 154sq.m was granted); Alterations to the original Cottage including conversion of the existing door opening into a window and replacement of existing window all on the south-west side, Wall infill with 2no. new windows all on the front north-west side, Partial wall infill on north-east elevation where non-original side extension is to be removed.; To include rooflight and solar panels within new extension roofs; Construction of a new balcony structure with glass balustrading to the rear; All associated conservation works to the Cottage walls / roof / floor, drainage works, hard landscaping with steps and ancillary alterations
Side extension as built to main dwelling and rear extension as built to main dwelling and permission for removal of existing septic tank, new wastewater treatment unit & polishing filter and associate works
(a) Demolition of the agglomeration of five different non-original extensions to the east façade at the rear of the main house, (b) Demolition of the non-original timber-glazed extension and wheelchair ramp at the north-east corner of the main house, (c) Demolition of the non-original timber-glazed extension at the south elevation of the main house, (d) Part demolition of the outbuildings situated to the rear of the main house to expose, retain and express the remaining historic east wall of the c.1892 constructed original outbuilding, which is currently hidden and adsorbed by various non-original additions, (e) Full internal and external refurbishment of the original house to re-instate it to its original form, including the reinstatement of the principal historic entrance to the three-bay façade of the Chief Boatman’s house, (f) The construction of a new glazed link and single storey extension to the rear of the main house, (g) The construction of a new glazed link and single storey extension to the rear and side of the existing cottage (former equipment store), (h) Elevational & internal alterations as shown on attached drawings and conservation reports, (i) All associated site & landscaping work including 2 x new wastewater treatment systems (A Protected Structure)
Demolition of two existing sheds and demolition of part of original house and construction of two-storey and single storey extensions to the front, sides and rear of the existing dwelling with attached garage and to upgrade the effluent treatment system to current EPA standards and all ancillary site works
The construction of an 18 metre monopole support structure (overall height of 19.5 metres) carrying telecommunications antennas, dishes and associated equipment, together with new ground level equipment cabinets, landscaping and all associated site works
Alterations to previously approved Pl.Reg Ref. 17/706 for the following: 1. New clubhouse design. 2. New Effluent treatment system design. 3. New carparking layout. 4. Repositioning of Pitch no. 02 together with all associated ancillary works to facilitate the above at, Ballyfree West, Glenealy, Co. Wicklow.
(1) a 94.00 m2 single storey dwelling, (2) 3 No. 100 m2 Hydroponic Grow Houses (3) a waste-water treatment unit and its associated percolation area, all to EPA standards, (4) a revised site entrance and (5) all associated site works
(a) The demolition of the rear extension to Rockingham House; (b) Proposed modifications to Rockingham House’s rear elevation and internal layout to achieve a 3-bed house; (c) The Construction of 2 no. 3-bed houses; all with associated private open space, communal open space, landscaping, car parking, and other necessary site works
Section 254 - Roadside Directional Signs - Location 15 Map WH7
For proposed improvements of existing logistics facility. The proposal will include the following (1.) A 383sq.m. extension to existing 287 sq.m. of logistics/distribution buildings on site ( 2). A Proposed new circa 1540sq.m. purpose built logistics/distribution facility with ancillary office space of circa 140 sq. m.attached with associated parking ( 3). The provision of a new truck/trailer storage yard. (4). Proposed new entrance gates /piers (5). The provision of new upgraded vehicular entrance off the public road with associated improved internal access road (6). A Proposed new secondary treatment system to current EPA guidelines and percolation area to service the development (7.) the reinstatement of an existing weigh bridge on site to working order (8) The provision of new security fencing to areas required (9) Demolition of Existing Shed/ building Circa 286 sq.m. and (10) all ancillary works including all drainage infrastructure, and any other works necessary to facilitate the development
Single storey flat roof extensions to the east and west side and to the rear, new entrance porch, raised parapet walls, alterations to elevations, alterations to the rear terrace and all associated site works to existing single storey detached dwelling
The construction of a bungalow, new entrance off existing lane, new treatment system and percolation area to current EPA standards and all ancillary site works
1. The demolition of 2 No. existing outbuildings/store units (previously used as part of Kerry Foods plant operations) circa 340 sq.m. 2 The erection of a new storage/grain storage facility circa 1164m2. 3 A new garage structure for maintenance and upkeep of Fleet vehicles for Kinsella Transport and Logistics Limited. 4. New security fencing to perimeter as well as parking facilities and all associated site works 5. The proposed works will be accessed and serviced by that previously granted permission under file ref 23/60069
1) The construction of sites for 8 no. additional mobile homes, the installation of a mobile home with associated external deck area and parking area on each site and access driveway, external lighting, berm mounding and landscaping; 2) The construction and installation of 1 no. 5-a-side football pitch, 2 no. pickleball courts, and 1 no. padel tennis court; 3) The construction of a hard standing area to provide for the storage of boats and jet skis, car parking spaces, storage containers and recycling containers; and 4) All associated site development works including drainage, pedestrian pathways, landscaping and water features
Milking parlour and dairy, collecting yard with an external slatted tank, drafting area and meal bin, cubicle shed with internal slurry slatted tanks and concrete yard, applying for new splayed stone wing walls to create wider farm entrance and for a setback of the roadside hedges on both sides to provide sufficient sightlines, applying for retention of an existing manure pit and all associated site development works
Construction of a loose shed for young horses, hard core surround and all associated site works
Proposed relocation and upgrading of existing vehicular entrance realignment of part of access road (circa 85 metres) & ancillary works
Construction of 50-unit rotary milking parlour and covered collecting yard with 2 no slatted tanks, and 2 no meal bins, external milk tank, water storage tank and a new location of an over ground circular slurry store previously granted under planning reference 16/2013, and all associated site development works
Of a gazebo structure located over an existing decking area.
Outbuilding to include a garage, music room, home office and storage room & associated site works
Bungalow, detached domestic garage, effluent treatment system in accordance with EPA 2009, and associated site works
Demolition of existing single storey dwelling house and shed, construction of new dwelling with single storey to front to match existing and two storeys to rear, new waste water treatment system and associated site works
Provision of a replacement on-site effluent treatment system and associated works
Section 254 - roadside directional - location 1 map WH1
Change of use (removal of planning condition no. 2 of planning ref. no. 09/922) from restricted use as a dwelling to use by all classes of persons
Extensions and alterations to an existing 120.15m2 dwelling. The works will include: 1. A proposed new 88.5m2 ground floor extension to the side and rear of existing dwelling to include new entrance and living/ancillary spaces. 2. A 7.3mm new extension to the side of the existing dwelling to accommodate a new stairs. 3 A 2.5m2 extension to upper floor to accommodate new layout and bathroom. 4 Alterations to existing plans and elevations to accommodate new proposals. 5. The removal of existing render on existing building to allow for existing stonework to be exposed. 6. All associated siteworks and landscaping
New dwelling house, new entrance with sight lines, connection to existing sewage and public water supply, all associated works
1. 14sqm extension to the rear of the existing garage and 2. planning permission for a new 28sqm standalone office studio to the rear of the main house
As follows: 1. Retention planning permission for an existing mobile home, site entrance and all associated works and 2. Planning permission for a new mobile home (to replace the existing mobile home), effluent treatment system and polishing filter, use existing entrance and all associated site works
Erection of 108.80m² side extension to existing 261.12m² shed, along with all associated site development works
Dwelling, wastewater treatment system to EPA standards, entrance and associated works
Change of house type of previous planning permission reference 211289, proposed dwelling, waste water treatment system to EPA standards, driveway and associated site works
Garage/home office as constructed on site and all associated site works
The construction of a new vehicular entrance and all ancillary site works
Construction of a single storey detached dwelling, effluent treatment system to current EPA standards and all ancillary site works