A dwelling, garage, bored well, wastewater treatment system to current EPA standards and all associated ancillary site works and servicesDecision record indexed
Construction of a new single storey industrial unit with ancillary 2 storey office accommodation (Total Floor Area 2310 sq.m) and all associated site development worksDecision record indexed
Erection of new over ground fibre optic cables on existing timber poles, the erection of new poles and associated fibre optic cablesDecision record indexed
Erect a 2,300m2 manufacturing & engineering industrial unit with connecting 440m2 office building along with all associated site development works including storage yard, car parking, signage and connect to the existing servicesDecision record indexed
To erect a 1,555m² extension to the rear and 720m² extension to the side of the existing 2,575 m² manufacturing & engineering industrial unit & 700m² office building along with all associated site development worksDecision record indexed
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning applicationDecision record indexed
Installation of a new effluent treatment system and percolation area in full accordance with EPA Cop 2009 standards and all associated site works, together with a new bored well4 conditions indexed