To construct a new dwelling house with attached carport and private garage, site entrance, access road, on-site wastewater treatment system and all other associated site works
To (a) demolish a conservatory / rear hallway, bay window, dormer, chimney, mansard roof and garage (b) to construct a second storey extension to the rear, single storey extension to the rear, porch to the front and new garage (c) elevation changes with all associated site works
For the construction of a dwelling house and garage with new vehicular entrance and driveway, a treatment unit and percolation area, bored well and all associated ancillary site works
To construct a single dwelling house, advanced wastewater treatment system along with ancillary site works
To construct a dwelling house, garage, entrance, driveway, wastewater treatment system, bored well and all associated site works
To carry out the following development: 1) The construction of a new 4m wide cycling infrastructure approximately 1185 metres in length, travelling from north to south on the R458, commencing with an uncontrolled crossing point north of the river Rine, then veering off-road over a refurbished masonry arch bridge, under the M18 Bridge and over the OPW embankment. The cycle path will then travel south via the existing access road serving the motorway attenuation ponds to where it will cross the L3148 east of the Dromoland East Roundabout via an uncontrolled crossing. It then veers south off-road, tying back in with the existing cycling infrastructure on the R458 with an uncontrolled crossing located approximately 300m south of the Dromoland East Roundabout. 2) An extension of the existing 60Kph speed limit for consideration of the scheme. 3) Installation of public lighting 4) The installation of associated signage. 5) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. The masonry bridge is a Protected Structure RPS No.:211 NIAH 20404204 as noted in the Clare County Development Plan 2017-2023 (as varied) Volume 4
To construct dwelling house, septic tank, percolation area and new site entrance
For the construction of two single-storey extensions, including all associated site works.
Of (a) 'as constructed existing' dwelling house i.e. (P8/13134) (b) 'change of use' of attached garage from previous domestic garage use to ancillary granny flat accommodation. (c)all ancillary site works and services
To (a) demolish previously constructed extensions (b) construct new extension and carry out alterations to dwellinghouse (c) Install new septic tank and percolation area together with all associated site development works and services
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
On the grant of outline permission (Planning Ref. No. P22-479) which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
(Planning ref. no P19-753) which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To extend the existing dwelling house to the rear to provide a new kitchen/dining area and to the side to provide an attached Granny Flat & all other associated site and ancillary works
(Planning ref. No. P22 480) which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To a) Retain Existing Garage and Storage Shed b) Retain Existing fuel storage bunker and associated shed cover c) Retain Existing offices and valet shed. d) Retain Existing concrete yard e) Retain Existing Car display area f) Provide a new exit onto the R352. g) Retain stone surface to rear yard h) Retain the existing Commercial use of the property
To construct a dwelling house and garage, with effluent treatment system, and all associated site works, accessed by an existing entrance and private road
For the construction of a dwellinghouse with integrated auxiliary living accommodation, garage & proprietary waste treatment plant, bored well & road entrance including ancillary site works
To construct a single dwelling house, advanced wastewater treatment system along with ancillary site works
The development will consist of the construction of a slatted unit and associated site works
The development will consist of the demolition of existing boundary walls, demolition of existing single storey six classroom school building of 685sq.m demolition of existing open shed of 25sq.m and demolition of prefabricated classroom building of 207 sq.m. The existing 4no. Classroom block constructed in 2011 with a gross floor area of 370sq.m will be retained and integrated into the new school. The new development consists of new two storey primary school building with a gross floor area of 1720sq.m. New accommodation consists of 8no. new Classrooms, a General Purpose Room and ancillary accommodation. In addition, site works include the replacement of the existing gated entrance with 2no. new gated vehicular and 2 no. new separate pedestrian entrance off the Knockanean Road boundary, serving 24 no. on site car parking spaces and associated set down areas, pedestrian pathways, together with 2 ball courts, play areas, a bin store, a bicycle shelter, gas tank enclosure, 3no. flagpoles, connection to existing foul drainage treatment system, separate surface water drainage, signage, landscaping and all associated site works on an overall site area oof 1.34 hectares. The building will be set back 63.285m from the Knockanean Road
For development which will consist of the construction of a dwelling house with garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of a revised dwelling house with garage design, to that previously approved under planning ref. P20-334
The development will consist of: 1) The installation of an external heat pump, to the rear of the proposed new school building (Planning Ref: P19/961) 2) The construction of a 2.6 m high acoustically insulated compound enclosure, of approx 45m2. 3) All associated site works
Of modifications to the design of the dwelling house and adjacent ancillary independent living accommodation granted under planning reference 23/104. Amendments to include the retention and completion of minor elevational changes, alterations to the internal layout of dwelling and modification of roof over ancillary independent living accommodation.
For; a) renovation of existing derelict dwelling b) construction of new 2 storey extension of dwelling c) change of use of adjacent structure from licence premises to ancillary independent living accommodation, d) construction of a new garage, e) revised vehicular entrance, f) proprietary wastewater treatment system with percolation area g) and all associated site works
For development at Dromoland Castle and Estate, (Dromoland Castle is a Protected Structure: RPS No. 278). The development will consist of: the demolition of the 20th century / non-original infill structures at the castle courtyard and the construction of a glazed roof structure (max height c.11m) to provide additional internal guest recreation / dining space for guests (c.300sqm additional floor area); Demolition of existing part one/part two element and the construction of a part three/part four storey extension to the existing 21st century castle's east wing to provide additional guest accommodation, resulting in the loss of 1 No. existing guest room and an additional 17 No. guest rooms, resulting in a net gain of 16 No. rooms within this part of the castle. Internal upgrades and reconfiguration to the castle's ground floor, resulting in a consolidated kitchen / back of house area and improved and extended guest dining and bar facilities, installation of new lift, alterations to ancillary facilities and loss of 3 No. existing guest bedrooms. Internal upgrades and reconfiguration at the castle's lower ground floor level, to provide additional bar space, kitchen facilities, the upgrade of existing spa areas together with the introduction of new wet spa facilities, all resulting in the loss of back of house space and 1 No. guest bedroom. Removal of existing deck and canopy and the extension of the existing clubhouse building through the reinstatement of the former orangery building to provide a guest restaurant / event space; Alteration and change of use of existing farm structures from agricultural to a golf maintenance facility and central delivery and procurement hub for the estate, including staff car parking to provide 11 No. spaces, including accessible spaces and EV charging spaces; and the provision of new / formalised car park to serve the Castle guests and Brian Boru Hall (event facilities) to provide 85 No. spaces, including accessible spaces and EV charging spaces. The proposed development will also comprise all ancillary landscaping and boundary treatment works, site services, wayfinding, site lighting, and all other associated site excavation, construction compound, infrastructural and site development works. The planning application includes a Natura Impact Statement
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
Of the existing entrance and driveway to dwellinghouse
To construct a two storey dwelling house, waste water treatment system and all ancillary and associated site and ground works
To construct a dwelling house and garage with effluent treatment system, new entrance from public road, and all associated site works
Of a domestic garage and retention of alterations to existing dwelling house's front elevation and roof.
To construct a single storey extension to the side of the existing dwelling house, including site services and all ancillary site works
To construct a new dwelling house, septic tank, sewerage treatment system and access to the public road
For development, the development consists of the construction of a slatted unit and associated site works
To decommission and remove existing septic tank, install secondary treatment system and polishing filter
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
For development which will consist of the following, (1) The relocation and extension of the existing first level retail outlet into an existing enclosed courtyard (2) A new yoga-meditation at the lower floor level in the existing courtyard (3) Minor alterations to existing internal walls and layout (4) Ancillary site works (The development is proposed within the existing hotel complex a protected structure Dromoland Castle, Dromoland)
Of a separate garage to the side of the existing dwelling house
To demolish an existing Industrial building and associated works on site and to construct a dwelling house and garage, with effluent treatment system, with all associated site works
For development of a livestock slatted unit with associated ancillary siteworks
To Extend the Appropriate Period of Planning permission for P20/562 the development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
The development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application.
For the following proposed development: a. to demolish existing single storey rear annex and utility sheds b. alteration and refurbishment of existing dwelling house c. construct both 2 storey and part single storey rear extensions d. construct detached remote home office and gym including utility storage shed e. construct new on-site wastewater treatment system f. adjust existing vehicular site entrances g. including all associated siteworks and services etc
To construct a storage shed together with ancillary site development works and services
To construct an entrance, dwelling house, garage, wastewater treatment system with soil polishing filter together with all associated site development works and services
For following works, (A) Construct an extension to the rear of the existing agricultural building on site, which will include a slatted / cubicle area with slurry storage tank, and (B) Construct a concrete silage slab base, all with associated site works
For to construct a concrete base and to erect a vertical milk cooling tank (Silo) on the base, with all associated site works