(1) discontinue and seal existing well on site (2) sink new bored well as replacement and (3) permission to revise site boundaries and all associated site and ancillary works1 condition indexed
Alterations to dwelling type as a change to that granted under Planning Register Reference 05/3929, retention of Kingspan Biotec Wastewater Treatment System type as a change to that granted under Planning Register Reference 05/3929, retention of domestic garage. PERMISSION is sought for revised site boundaries, decommission existing on site effluent disposal polishing filter and install new on site effluent disposal polishing filter and install new on site effluent disposal polishing filter as a replacement and all associated site and ancillary works2 conditions indexed
1. The demolition of the existing first floor storage area to the rear and for the construction of a two-story extension.2. alterations to all elevations with the addition of a new dormer window and link roof onto the existing cottage and all ancillary site worksDecision record indexed
1. Demolition of existing single storey extension 2. Construction of a single storey extension to side and rear of existing dwelling and 3. all ancillary site worksDecision record indexed
For alterations and additions to the existing two storey house, including a rear single storey extension, reconfiguration of the internal layout of the ground and first floors, a new external door to the north elevation, a new pedestrian gate at roadside, and all ancillary site works. (a protected structure Ref No. 43-25, NIAH Reg. No. 16404305Decision record indexed
Section 254 Licence - erection of new over ground fibre optic cables on existing timber poles, the erection of 9 new poles and associated fibre optic cablesDecision record indexed
Effluent treatment system and percolation area to comply with current EPA requirements and associated site works. The works are within the curtilage of a protected structure Eg No 164043062 conditions indexed
New dwelling house, a well, new entrance and driveway, effluent treatment system to comply with current EPA requirements and associated worksGrounds not yet categorised
Construction of an extension to the existing house and new shed, replace existing front boundary which consists of a sod and stone bank with a 1.2metre natural stone-faced wall and all ancillary site worksDecision record indexed
The construction of a dormer to the lean-to roof at the rear of the existing house, the construction of a new extension, including a conservatory type structure to the West of the existing house, the installation of a new wastewater treatment plant, landscaping and site works associated with the proposed developmentDecision record indexed
Erect a fully serviced dwelling house, domestic garage/store, private bored well, on-site wastewater treatment system and all associated site worksDecision record indexed