A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, BORED WELL, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
A new dwelling house, domestic garage, wastewater treatment system, bored well, driveway and entrance and all associated site works.Decision record indexed
CONSTRUCTION OF A DWELLING HOUSE WHICH WILL BE PART SINGLE/PART TWO STOREY, DOMESTIC GARAGE, SEPTIC TANK SYSTEM AND PERCOLATION AREA AND ALL OTHER ASSOCIATED SITE WORKSDecision record indexed
A NEW DWELLING HOUSE, GARAGE, NEW ENTRANCE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND POLISHING FILTER AND ALL ANCILLARY SITE WORKSDecision record indexed
For the construction of a single storey dwelling house, waste water treatment plant with percolation area and all associated external works including a new entrance. Gross floor space of proposed works: 87.1 sqmGrounds not yet categorised
For the construction of following: a) Agricultural building to include milking parlour, ancillary rooms, partially roofed collecting yard and livestock handling facilities along with slatted soiled water tanks, b) Agricultural building to include cubicle & straw bedded livestock housing along with slatted slurry storage tanks, c) Agricultural building to include cubicle livestock housing along with slatted slurry storage tanks, d) Soiled water tank, e) Erection of milk silo, 2 no. rainwater harvesting tanks, 2 no. meal bins & 2 no. water storage tanks, f) Overground slurry store along with associated site works. Gross floor space of proposed works: 10978 sqm.Decision record indexed
For a change of house plans from those granted previously under Pl. Ref.'s 11/28 and 16/172 including all associated site works. Gross floor space of proposed works: 211 sqmDecision record indexed
(A) FORM NEW ATTACHED GRANNY FLAT TO EXISTING DWELLING HOUSE, BY CONVERTING THE EXISTING DETACHED DOMESTIC GARAGE TO HABITABLE LIVING AREA AND THE CONSTRUCTION OF ADDITION AND ALTERATIONS TO EXISTING DETACHED DWELLING HOUSE TO CONNECT THE TWO STRUCTURES AND (B) ERECTION OF PREFABRICATED STEEL DOMESTIC GARAGE AND ALL ANCILLARY SITE WORKSDecision record indexed
Construction of a dwelling house and domestic garage, to include a septic tank and percolation area, proposed connection to mains water supply, new site entrance and all associated site worksDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, FORM NEW ENTRANCE, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA & ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLERY SITE WORKSDecision record indexed
CONSTRUCTION OF A SINGLE STOREY DWELLING WITH PROPRIETARY EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
CONSTRUCTION OF A SINGLE STOREY DWELLING, WITH PROPRIETARY EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED WORKSDecision record indexed
CONSTRUCTION OF A SINGLE STOREY DWELLING, WITH PROPRIETARY EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED WORKSGrounds not yet categorised
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKSDecision record indexed
Alterations to existing house, to construct a side and rear extension to existing house, to include connection to the existing public foul sewer and existing water mains services on site, proposed new site entrance, proposed garage and all associated site worksDecision record indexed
Construction of a proposed single storey dwelling, domestic garage, septic tank, percolation area, and all associated site works, including a proposed site entranceDecision record indexed
THE DEMOLITION OF THE EXISTING DWELLING HOUSE AND CONSTRUCTION OF NEW REPLACEMENT DWELLING HOUSE, GARAGE, ENTRANCE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER, CONNECTION TO SERVICES AND ALL ANCILLARY SITE WORKSDecision record indexed
For installation of a Wastewater Treatment System with percolation area and all associated works. The proposed Wastewater Treatment System with percolation area is with the curtilage of a protected structure under RPS Reg No. 1016.Decision record indexed
THE RENOVATION OF AN EXISTING SINGLE STOREY DWELLING AND THE CONSTRUCTION OF A TWO-STOREY EXTENSION TO THE REAR, A DOMESTIC GARAGE, ALL INTERNAL MODIFICATIONS, A PROPOSED SEPTIC TANK AND PERCOLATION AREA, FRONT BOUNDARY ADJUSTMENTS AND ALL ASSOCIATED SITE WORKSDecision record indexed
Waterways Ireland Shannon Navigation, downstream of Victoria Lock in the townland of Clonahenoge (river location adjacent to R42WF97), Co. Offaly
Essential maintenance works to the Shannon Navigation in accordance with Waterways Ireland’s statutory remit comprising of the following: (i) Removal of 710m3 silt build up, downstream of Victoria Lock. (ii) All works ancillary and incidental to the maintenance item referred to in (i) above. An Ecological Impact Assessment (EcIA) and Natura Impact Statement (NIS) has been prepared in respect of the planning application. The proposed maintenance works will require access through the front and rear curtilage of Victoria Lock House (RPS No. 38-04) and use of the field to the rear of Victoria Lock House beyond its immediate curtilage & access only through the east and south curtilage of Victoria Lock (RPS 38-05). No works or alterations to the physical structure of either the Lock House, its associated outhouses or to the Lock, are required as part of proposed maintenance works.Decision record indexed
A dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site worksDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKSDecision record indexed
DEMOLITION OF EXISTING DWELLING HOUSE AND REPLACEMENT WITH THE CONSTRUCTION OF A NEW DWELLING HOUSE, SEPTIC TANK AND PERCOLATION AREA WITH ALL ASSOCIATED SITE WORKS AND ALL ANCILLARY SERVICES THERETODecision record indexed
To construct a six bay double slatted cubicle unit with roofed collecting yard, milking parlour, dairy and plant room. Gross floor space of proposed development: 681 msqDecision record indexed
The demolition of elements of the existing dwelling and the provision of a new single storey extension to the rear of the dwelling, internal and external alterations and refurbishment works to the existing dwelling including a new front porch and new wastewater treatment system and coco filter together with all associated site development works.Decision record indexed
A new dwelling, a new proprietary effluent treatment and polishing filter, a new replacement road entrance, and all ancillary site works.Decision record indexed
An existing garage with a rear storage shed, a separate open shed, a rear entrance extension to the main house and including all ancillary site worksDecision record indexed
To construct dwellinghouse, domestic garage, wastewater treatment system, percolation area, and all associated site services. Gross floor area of proposed works: 190.5 sqm (dwellinghouse) 29.75 sqm (domestic garage)Decision record indexed
(A) DOMESTIC GARAGE/FUEL SHED & (B) ADDITION & ALTERATIONS TO DWELLING HOUSE PREVIOUSLY GRANTED PERMISSION UNDER PL2/4181 AND ALL ANCILLARY SITE WORKSDecision record indexed
For the construction of a single storey dwelling, construction of a domestic garage, wastewater treatment system with percolation area, new site entrance & all associated external site worksDecision record indexed